In: Operations Management
Mcq choose one option need all questions answered
2.The relationship grid is used when:
I have no clue |
||
When there is no quantifiable data |
||
None of these |
||
We have no idea what to put close to other departments |
||
When there is quantifiable data |
||
When we want to separate items |
3.Efficiency can never be over 100%.
a. True
b. False
4. Scheduling is usually the last step in the production process.
a. True
b. False
5. 100% utilization is a good idea.
a. True
b. False
1. The theory of constraints states that:
The capacity of the system is the capacity at the bottleneck |
||
None of the above |
||
Every system has a bottleneck & The capacity of the system is the capacity at the bottleneck |
||
Every system has a bottleneck |
||
All of the above |
||
Increasing capacity is constrained |
1. (Option c) every system has a bottleneck and the capacity of the system is the capacity at the bottleneck.
The theory of constraints states that every system has a bottleneck and the capacity of the system is the capacity at the bottleneck.
2. (Option d) we have no idea what to put close to other departments.
The relationship grid is used when we have no idea what to put close to other departments.
3. True
The output work is always less than the output work because some of the input work is used to overcome friction. Therefore, efficiency is always less than 100 percent.
4. False
Scheduling is not the last step in the production process. Scheduling is usually the second step in the production process.
5. False
When the team reaches 100% utilization, the individual processors begin to slow as the ability to process information diminishes and anxiety increases. The quality of work and therefore, the productivity of the tem will be reduced.