Men at a construction site were moving concrete blocks from a
truck, a short distance to the base of a house. The first day the
average man moved 62 blocks per hour.
The current day the numbers were :
70,63,76,86,86,62,97,70,77,81
1. Assume all assumptions are met. Provide descriptive
statistics for the sample.
2. Conduct a statistical test to assess if the men were able to
move more than 62 blocks per hour.
3. The men had more rest than they...