Question

In: Accounting

Case on Job-Order Costing and Pricing Decisions Nutratask, Inc., is a pharmaceutical manufacturer of amino-acid-chelated minerals...

Case on Job-Order Costing and Pricing Decisions

Nutratask, Inc., is a pharmaceutical manufacturer of amino-acid-chelated minerals and vitamin supplements. The company was founded in 1974 and is capable of performing all manufacturing functions, including packaging and laboratory functions. Currently, the company markets its products in the United States, Canada, Australia, Japan, and Belgium.

Mineral chelation enhances the mineral's availability to the body, making the mineral a more effective supplement. Most of the chelates supplied by Nutratask are in powder form, but the company has the capability to make tablets or capsules.

The production of all chelates follows a similar pattern. Upon receiving an order, the company's chemist prepares a load sheet (a bill of materials that specifies the product, the theoretical yield, and the quantities of materials that should be used). Once the load sheet is received by production, the materials are requisitioned and sent to the blending room. The chemicals and minerals are added in the order specified and blended together for two to eight hours, depending on the product. After blending, the mix is put on long trays and sent to the drying room, where it is allowed to dry until the moisture content is 7 to 9 percent. Drying time for most products is from one to three days.

After the product is dry, several small samples are taken and sent to a laboratory to be checked for bacterial level and to determine whether the product meets customer specifications. If the product is not fit for human consumption or if it fails to meet customer specifications, additional materials are added under the direction of the chemist to bring the product up to standard. Once the product passes inspection, it is ground into a powder of different meshes (particle sizes) according to customer specifications. The powder is then placed in heavy cardboard drums and shipped to the customer (or, if requested, put in tablet or capsule form and then shipped).

Since each order is customized to meet the special needs of its customers, Nutratask uses a job-order costing system. Recently, Nutratask received a request for a 300-kilogram order of potassium aspartate. The customer offered to pay $8.80/kg. Upon receiving the request and the customer's specifications, Lanny Smith, the marketing manager, requested a load sheet from the company's chemist. The load sheet prepared showed the following material requirements:

Material Amount Required
Aspartic acid 195.00 kg
Citric acid 15.00 kg
K2CO3 (50%) 121.50 kg
Rice 30.00 kg

The theoretical yield is 300 kg.

Lanny also reviewed past jobs that were similar to the requested order and discovered that the expected direct labor time was 16 hours. The production workers at Nutratask earn an average of $12.50 per hour.

Purchasing sent Lanny a list of prices for the materials needed for the job.

Material Price/kg
Aspartic acid $5.75
Citric acid 2.02
K2CO3 4.64
Rice 0.43

Overhead is applied using a companywide rate based on direct labor dollars. The rate for the current period is 110 percent of direct labor dollars.

Whenever a customer requests a bid, Nutratask usually estimates the manufacturing costs of the job and then adds a markup of 30 percent. This markup varies depending on the competition and general economic conditions. Currently, the industry is thriving, and Nutratask is operating at capacity.

Required:

1. Prepare a job-order cost sheet for the proposed job. If required, round your answers to the nearest cent. If an answer box does not require an entry, leave it blank.

Job-Order Cost Sheet
Potassium Aspartate
MATERIALS DIRECT LABOR OVERHEAD
Type Quantity Cost Hrs. Rate Amount Cost Rate Amount
Aspartic __ $__ ___ $___ $____ $___ %___ $___
Citric __ ___ ___ ____ _____ ____ _____ ____
K2CO3 __ ___ ___ ____ _____ ____ _____ ____
Rice __ ___ ___ ____ _____ ____ _____ ____
Cost Summary
Direct materials $___
Direct labor ___
Overhead ___
Total cost $___
÷
Unit cost $___

For the following: When required, round your answers to the nearest cent.

What is the expected per-unit cost including the markup (the price charged)?
$__ per unit

Should Nutratask accept the price offered by the prospective customer?

No

2. Suppose Nutratask and the prospective customer agree on a price of cost plus 30 percent. What is the gross profit that Nutratask expects to earn on the job? Round your intermediate and final answers to the nearest cent.
$___

3. Suppose that the actual costs of producing 300 kg of potassium aspartate were as follows: Round your intermediate and final answers to the nearest cent.

Direct materials:
Aspartic acid $1,170.00
Citric acid 30.00
K2CO3 577.00
Rice 13.00
Total materials cost $1,790.00
Direct labor $ 225.00
Overhead 247.50

What is the actual per-unit cost?
$__ per unit

The bid price is based on expected costs. How much did Nutratask gain (or lose) because of the actual costs differing from the expected costs?
Loss     $__

Solutions

Expert Solution

Job-Order Cost Sheet for 300 units based on estimates and actuals
Potassium Aspartate
Type Estimated Quantity Required(Kgs) Price per KG ($) Amount (Qty * Price) ($) Cost per unit ($) Actual total cost ($) Actual Cost per unit ($) Loss ($)
Aspartic 5.75 1121.25 3.74 1170 3.9
Citric 15.00 2.02 30.3 0.1 30 0.1
K2CO3 121.5 4.64 563.76 1.88 577 1.92
Rice 30.00 0.43 12.9 0.04 13 0.04
Total material cost 1728.21 5.76 1790 5.97
Direct labor 16 hours $12.5/hr 200 0.67 225 0.75
Prime cost 1928.21 6.43 2015 6.72
Overhead ( @ 110% of Direct labour) 220 0.73 247.5 0.83
Total cost 2148.21 7.16 2262.5 7.54 114.29
Mark up @ 30% on total cost 644.46 2.15 678.75 2.26
Selling price 2792.67 9.31 2941.25 9.8


expected per-unit cost including the markup (the price charged) : $ 9.31 per unit
Gross profit : In Costing terminology there is no "Gross profit". It is only in Financial accounting'.
However, the total profit is the mark- up on the cost : Expected to be $ 644.46
Based on the actual amount, the per unit cost = $ 9.8 per unit (including its mark- up)
Nutratask gain (or lose) because of the actual costs differing from the expected costs = $ 114.29

Related Solutions

International Marketing Strategies Pricing Decisions Case Analysis PolyPrin Clothing Inc. is a manufacturer of women’s fashion...
International Marketing Strategies Pricing Decisions Case Analysis PolyPrin Clothing Inc. is a manufacturer of women’s fashion clothing out of San Diego, California. The company has been in business for five years operating a plant capable of producing 4 million items per annum. PolyPrin’s fashion lines are a series of casual yet elegant light dresses designed with the tropical spirit in mind. The name of the company is derived from the influence of Pacific culture, and positioned for young to middle...
Job Order Costing: Define job order costing. Compare and contrast job order costing with process costing....
Job Order Costing: Define job order costing. Compare and contrast job order costing with process costing. Trace the flow of costs through a job order costing system. Discuss manufacturing overhead and how it is applied. Why is the manufacturing overhead account adjusted at the end of the period?
Opticom, Inc. a manufacturer of fiber optic communications equipment, uses a job-order costing system. Since the...
Opticom, Inc. a manufacturer of fiber optic communications equipment, uses a job-order costing system. Since the production process is heavily automated, manufacturing overhead is applied on the basis of machine hours using a predetermined overhead rate. The current annual rate of $15 per machine hour is based on budgeted manufacturing overhead costs of $1,200,000 and a budgeted activity level of 80,000 machine hours (the company’s estimated practical capacity). Operations for the year have been completed, and all of the accounting...
FiberCom, Inc., a manufacturer of fiber optic communications equipment, uses a job-order costing sys-tem. Since the...
FiberCom, Inc., a manufacturer of fiber optic communications equipment, uses a job-order costing sys-tem. Since the production process is heavily automated, manufacturing overhead is applied on the basis of machine hours using a predetermined overhead rate. The current annual rate of $15 per machine hour is based on budgeted manufacturing overhead costs of $1,200,000 and a budgeted activity level of 80,000 machine hours (the company’s estimated practical capacity). Operations for the year have been completed, and all of the accounting...
Job-order costing:
Lueckenhoff Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor-hours. The company based its predetermined overhead rate for the current year on total fixed manufacturing overhead cost of $497,000, variable manufacturing overhead of $2.40 per direct labor-hour, and 70,000 direct labor-hours. The company has provided the following data concerning Job T498 which was recently completed: Number of units in the job 40 Total direct labor-hours 80 Direct materials $ 950 Direct labor...
What are job-order costing and process costing? What types of firms use job-order costing? Process costing?...
What are job-order costing and process costing? What types of firms use job-order costing? Process costing? Explain how overhead is assigned to production when a predetermined overhead rate is used. Assume that a company has decided not to allocate any support department costs to producing departments. Describe the likely behavior of the managers of the producing departments. Would this be good or bad? Explain why allocation would correct this type of behavior.
II. JOB ORDER COSTING (Chapter 19) a.Describe when the use of Job order costing would be...
II. JOB ORDER COSTING (Chapter 19) a.Describe when the use of Job order costing would be appropriate b. Prepare journal entries for the following transactions (explanations not required) 1. materials purchased 2. materials used 3. wages payable 4 - 7 actual overhead costs incurred 8.overhead allocation 9.transferring costs to finished goods (YOU WILL HAVE TO MAKE UP NUMBERS FOR THE JOURNAL ENTRIES)
Overhead Application and Job-Order Costing Heurion Company is a job-order costing firm that uses a plantwide...
Overhead Application and Job-Order Costing Heurion Company is a job-order costing firm that uses a plantwide overhead rate based on direct labor hours. Estimated information for the year is as follows: Overhead $789,000 Direct labor hours 100,000 Heurion worked on five jobs in July. Data are as follows: Job 741 Job 742 Job 743 Job 744 Job 745 Balance, July 1 $29,870 $55,215 $27,880 $0 $0 Direct materials $25,500 $39,800 $14,450 $13,600 $8,420 Direct labor cost $61,300 $48,500 $28,700 $24,500...
Bunnell Corporation is a manufacturer that uses job-order costing. On January 1, the company’s inventory balances...
Bunnell Corporation is a manufacturer that uses job-order costing. On January 1, the company’s inventory balances were as follows: Raw materials $ 65,000 Work in process $ 20,400 Finished goods $ 52,800 The company applies overhead cost to jobs on the basis of direct labor-hours. For the current year, the company’s predetermined overhead rate of $15.75 per direct labor-hour was based on a cost formula that estimated $630,000 of total manufacturing overhead for an estimated activity level of 40,000 direct...
Bunnell Corporation is a manufacturer that uses job-order costing. On January 1, the company’s inventory balances...
Bunnell Corporation is a manufacturer that uses job-order costing. On January 1, the company’s inventory balances were as follows: Raw materials $ 65,000 Work in process $ 20,400 Finished goods $ 52,800 The company applies overhead cost to jobs on the basis of direct labor-hours. For the current year, the company’s predetermined overhead rate of $15.75 per direct labor-hour was based on a cost formula that estimated $630,000 of total manufacturing overhead for an estimated activity level of 40,000 direct...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT