Imagine you are a pipeline company trying to sell a new project to a shipper of oil for a new refinery.

Pipeline Length: 266 miles (16,853,760 inches)

The refinery is scheduled to take 300,000 barrels per day of Bakken Crude at typical temperatures. ​Temperature: 60 degrees Fahrenheit. Flow rate = 33687.5 in3​/s. Kinematic viscosity: 3.337 centistokes or 0.0051723603 in2​/s. Specific Gravity = 0.7

​Calculate Reynold's number.

​Friction Factor: 0.0275.

​Calculate Pressure Drop.

Pipeline flows entirely through class I locations except for 10 miles located in a class IV location. You have the option of bypassing the class IV location by running the pipeline an additional 50 miles.

Pipe Diameter: 12 inches X-42 Schedule 20

​Calculate Maximum Pressure

The inlet pressure of pumping stations should not fall below 400 psi.

Set distance between pumping stations optimally.

Calculate horsepower requirements

Solutions

Expert Solution

Pipeline Length: 266 miles (16,853,760 inches)

Flow rate,Q = 33687.5 in3​/s

Kinematic viscosity=0.0051723603 in2​/s

​Friction Factor: 0.0275

Pipe diameter, d=12 in

Therefore Area of pipe, A= pi X d2 / 4=3.142 X 144/4=113.112 sq in

Flow rate = Area x Velocity

Velcoty, V =Flow rate/Area= 33687.5/113.112 = 297.824 in per sec

Reynolds Number, R = V x D/(Kinematic viscosity) = 297.824 x 12/0.0051723603 = 690959.47

To find Pressure drop,

​Friction Factor, f: 0.0275

Pipeline Length, L: 16,853,760 in

Acceleration due to gravity, g = 392.4 in/s2

Head loss h1= f L V2/(2 g D) = 0.0275 x 16,853,760 x 297.8242 /( 2 x 392.4 x 12) = 4365245.196 in

Density of oil = Specific Gravity x density of water =0.7 x 1000= 700 kg/m3 = 0.0252891 lb/in3

Therefore pressure drop = density x g xh1= 0.0252891 x 392.4 x 4365245.196 = 43318261.19 psi

After By- Passing the the oil through Class IV section oil needs to travel extra 50 miles(3168000 in),

Therefore pressure drop will be( By performing the same presure drop calculation by changing L= 16,853,760 + 3168000 =20021760 in)

Head loss h2 = 0.0275 x 20021760 x 298.0142 /(2 x 392.4 x 12) = 5192398.766 in

Total pressure drop = density x g x h2= 0.0252891 x 392.4 x 5192398.766= 51526472.35 psi

Therefore Maximum pressure in pipe should be after by-passing is 51526472.35 psi

As we know that the total pressure should be 51526472.35 psi and inlet pressure of pumping stations should not fall below 400 psi,

then total number of pumping station required is 51526472.35/400 = 128816.18 or 128817

The distance between each pumping station is 20021760/128817 =155.428 in

Total Horse power required is P= Density x g x Q x h2 = 0.0252891 x 392.4 x 33687.5 x 5192398.766= 1.735798 x 1012  in2 lb/s3 = 508.42 M watt = 681802.45 Hp (1Hp = 745.7 W)


Related Solutions

Imagine you are a pipeline company trying to sell a new project to a shipper of...
Imagine you are a pipeline company trying to sell a new project to a shipper of oil for a new refinery in Grand Forks. In order to prepare for selling this idea to shippers and hopefully win the contract, you need to calculate the average cost per unit ($/barrel) of oil to ship over this line in the first year; taking into account Capital, Operating and Energy Cost. This is a competitive proposal, so you will want to make sure...
Imagine that you are a project manager who was just assigned to a new project. You...
Imagine that you are a project manager who was just assigned to a new project. You received no additional information except that your primary constraint is time and the initial cost estimates should be based on previously completed projects. Assume that you were able to find ways to gather the information you needed, and that you have already created a project plan and schedule. Now imagine that your team discovers discrepancies in the material and resource costs. Since you used...
Imagine you are trying to sell your digital marketing services to local small firms. Explain how...
Imagine you are trying to sell your digital marketing services to local small firms. Explain how you would use each of the six steps in the selling process.
An insurance company is trying to sell you an investment policy that will pay you and...
An insurance company is trying to sell you an investment policy that will pay you and your heirs $100,000 per year forever. If the required return on this investment is 6.5 percent, how much will you pay for the policy? A. $1,538,461.54 B. $925,925.93 C. $1,265,455.25 D. $2,627,950.42
You are trying to value the following project for your company. You know that the project...
You are trying to value the following project for your company. You know that the project will generate free cash flows in perpetuity that will grow at a constant annual rate of 2% after year 2. The applicable interest rate for this project is 11%. What is the NPV of this project? Express your result in $-millions (do not include the $-symbol in your answer). If you calculate a negative NPV enter a negative number. Free Cash Flow Forecasts (in...
Imagine you are a conservation manager in New York City, trying to protect an endangered squirrel....
Imagine you are a conservation manager in New York City, trying to protect an endangered squirrel. How would you design a reserve system that would help the squirrel, but also work in the context of the city? What are key things to consider, based on your knowledge of island biogeography?
An insurance company is trying to sell you a retirement annuity. The annuity will give you...
An insurance company is trying to sell you a retirement annuity. The annuity will give you 20 payments with the first payment in 12 years when you retire. The insurance firm is asking you to pay $50,000 today. If this is a fair deal, what must the payment amount be (to the dollar) if the interest rate is 8 percent? please show in excel
Let's imagine that you are the project manager in the IT department of a large company....
Let's imagine that you are the project manager in the IT department of a large company. The project team is creating a maintenance plan. The team consists of three technicians, a network architect, a training specialist, and you, the project manager. The project is currently in the project-execution phase, and it is time to have your first project status-update meeting. Here are some tips for conducting a successful project status-update meeting: • Determine the meeting place and time. • Invite...
1. Imagine that you are a member of a new-project team of a large appliance manufacturer....
1. Imagine that you are a member of a new-project team of a large appliance manufacturer. Your team is given the task of designing a new refrigerator for the U.S. consumer market. (a) For each of the five types of consumer needs Objective-performance needs (Hedonic/esthetic-performance need, Social-performance needs, Performance-reliability needs, Product-convenience needs)give a suggestion for how a new refrigerator could satisfy that need better than most currently available refrigerators. (b) For two of the suggestions you made in Part (a),...
Problem 6 You are evaluating a project to build an oil pipeline in one of the...
Problem 6 You are evaluating a project to build an oil pipeline in one of the emerging markets. Building the pipeline will take 8 annual investments, each of which is paid at the beginning of the year, starting immediately. The first of these investments is $20 million and the amount of the remaining 7 investments is expected to decrease by 3% per year. The pipeline will commence its operations in year 9 and will transport 3,500,000 barrels of oil per...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT