Sunland Manufacturing produces two products in its Saratoga
plant, balzene and galvene. Since it opened its doors in 1965,
Sunland has been using a single manufacturing overhead pool to
accumulate overhead costs. Overhead has been allocated to products
based on direct labor hours.
Until recently, Sunland was the sole producer of galvene in the
country and was therefore able to dictate the selling price.
However, last year Marcella Products began marketing a comparable
product at $53 per unit—a price that is below Sunland’s product
cost. Sunland’s market share of galvene has declined rapidly as a
result. The company’s managers must now decide whether to meet the
competitive price or discontinue the product. Sunland’s cost
accountant has suggested that the company do an activity-based cost
analysis before managers make the decision.
The two main indirect costs of manufacturing balzene and galvene
are power usage and setup costs. Most of the power usage occurs in
the fabricating department; most of the setup costs are incurred in
the assembly department. Setup costs are incurred predominantly in
the production of balzene. The fabricating department has
identified machine hours as the appropriate cost driver; the
assembly department has identified setups as the appropriate cost
driver. Direct labor rates are the same in both departments.
The combined budget for manufacturing is as follows.
Total |
Balzene |
Galvene |
||||
---|---|---|---|---|---|---|
Number of units |
10,000 | 10,000 | ||||
Direct labor |
$1,080,000 | 10 hours per unit | 20 hours per unit | |||
Direct material |
$11.00 per unit | $4 per unit | ||||
Overhead |
||||||
Indirect labor |
$50,000 | |||||
Fringe benefits |
18,000 | |||||
Indirect materials |
31,000 | |||||
Power |
180,000 | |||||
Setup |
90,000 | |||||
Quality assurance |
25,000 | |||||
Other utilities |
20,000 | |||||
Depreciation |
30,000 |
The cost accountant has prepared the following estimates of
overhead usage by the two departments:
Fabricating |
Assembly |
|||||
---|---|---|---|---|---|---|
Indirect labor |
75% | 25% | ||||
Fringe benefits |
70% | 30% | ||||
Indirect materials |
$20,000 | $11,000 | ||||
Power |
$100,650 | $79,350 | ||||
Setup |
$20,000 | $70,000 | ||||
Quality assurance |
65% | 35% | ||||
Other utilities |
60% | 40% | ||||
Depreciation |
80% | 20% |
Activity Base Usage |
Machine Hours |
Setups |
||
---|---|---|---|---|
Balzene |
4 MH/unit | 1,000 | ||
Galvene |
6 MH/unit | 250 |
Calculate the unit costs of balzene and galvene using the current overhead allocation basis of direct labor hours.
cost per unit for Balzene 61.80 galvene 105.60
Calculate the amount of overhead cost assigned to the Fabricating and Assembly activity cost pools using the cost accountant’s estimates. Determine the overhead rate for each cost pool. (Round overhead rate answers to 3 decimal places, e.g. 15.215.)
OH cost assigned 243000 Fabricating 201000 Assembly
OH rate 2.43/ MH 160.80/setup
C.
Calculate the unit costs of balzene and galvene using
activity-based costing. (Round all rates and final
answers to 2 decmial places, e.g. 15.25.)
Balzene |
Galvene |
||
---|---|---|---|
Cost per unit |
Can someone please help me solve for C. please explain.
*****************