An automatic machine in a manufacturing process is operating properly if the lengths of an important subcomponent are normally distributed with a mean of 111 cm and a standard deviation of 5.5 cm.

A. Using Excel, find the probability that one selected subcomponent is longer than 113 cm.

Probability =

B. Using Excel, find the probability that if 3 subcomponents are randomly selected, their mean length exceeds 113 cm.

Probability =

Solutions

Expert Solution

Given data,

mean = 111 cm

standard deviation = 5.5 cm

A)

Go to formulas section in menu bar----select more functions -- select NORMDIST enter the values (x=113, mean=111, std deviation=5.5 ,cumulative =1)--press enter

You will get the value of P(x<113)

But we need P(x>113) here which is equal to 1-P(x<113)

= 1-0.641935 = ' 0.358065 ' .

B)

Here ,we will use sample std deviation = 5.5/ sqrt(3) = 5.5/1.732 = 3.17.

by using the same method from above part (a)

as NORMDIST(x=113, mean=111, std deviation=3.17 ,cumulative =1)--- press enter then we get 0.735952

the answer you should get is (1- 0.735952) = ' 0.264048 ' .


Related Solutions

An automatic machine in a manufacturing process is operating properly if the lengths of an important...
An automatic machine in a manufacturing process is operating properly if the lengths of an important component are normally distributed with a mean of 110 cm and a standard deviation of 4.8 cm. a) Find the probability that a selected component is longer than 112 cm. b) Find the probability that if 3 are randomly selected, all have lengths less than 112 cm. c) Which length marks the longest 15% of the subcomponents?
QUESTION 2: When a manufacturing process is operating properly, maximum length of a certain part must...
QUESTION 2: When a manufacturing process is operating properly, maximum length of a certain part must be 25cm. The lengths which are more than 25cm are scrap. If the proportion of scrap is more than 0.171255, then a modification of the process is needed to reduce this amount. On one production run, a random sample of 50 consecutive parts are selected and the following lengths are observed. 19.52 23.15 23.17 18.33 25.68 18.51 20.63 25.68 21.21 26.58 19.85 19.63 20.58...
A company is considering buying an automatic machine for a certain process. The machine has an...
A company is considering buying an automatic machine for a certain process. The machine has an initial cost of 23,000, a residual value of 4,000 and a useful life of 10 years. The production of this machine is 8 tons per hour. You need an operator that makes $ 12.00 per hour. The annual cost of operation and maintenance is 3,500 As a second alternative you can buy a small machine for 8,000 that has a residual value of 0...
2. An automatic welding machine is being considered for use in a production process. It will...
2. An automatic welding machine is being considered for use in a production process. It will be considered for purchase if it is successful on 99% of its welds. Otherwise, it will not be considered efficient. A test is to be conducted with a prototype that is to perform 100 welds. The machine will be accepted for manufacture if it misses no more than 3 welds. (a) What is the probability that a good machine will be rejected? (b) What...
A Patent Medicine Company supervisor assumes that the bottling machine is operating properly if only 5...
A Patent Medicine Company supervisor assumes that the bottling machine is operating properly if only 5 percent of the processed bottles are not full. A random sample of 100 bottles had 7 bottles that weren’t full. Using a significance level of .01, conduct a test to see if the machine is operating properly. 10. According to Management Accounting, salary figures for certified management accountants (CMAs) who are in the field less than 1 year are normally distributed with a mean...
Consider an automatic bank machine, known as Automatic Teller Machine (ATM), and a customer who wishes...
Consider an automatic bank machine, known as Automatic Teller Machine (ATM), and a customer who wishes to withdraw some cash from his or her banking account. Draw a UML system sequence diagram to represent this use case.
When things are operating​ properly, a certain Internet bank can process a maximum of 28 electronic...
When things are operating​ properly, a certain Internet bank can process a maximum of 28 electronic transfers every minute during the busiest periods of the day. If it receives more transfer requests than​ this, then the​ bank's computer system will become so overburdened that it will slow to the point that no electronic transfers can be handled. If during the busiest periods of the day requests for electronic transfers arrive at the rate of 180 per​ 10-minute period on​ average,...
When the manufacturing process is working properly, NeverReady batteries have lifetimes that follow a slightly right-skewed...
When the manufacturing process is working properly, NeverReady batteries have lifetimes that follow a slightly right-skewed distribution with µ = 7 hours. A quality control supervisor selects a simple random sample of n batteries every hour and measures the lifetime of each. If she is convinced that the mean lifetime of all batteries produced that hour is less than 7 hours at the 5% significance level, then all those batteries are discarded. a. State appropriate hypotheses for the quality control...
When the manufacturing process is working properly, NeverReady batteries have lifetimes that follow a slightly right-skewed...
When the manufacturing process is working properly, NeverReady batteries have lifetimes that follow a slightly right-skewed distribution with µ = 7 hours. A quality control supervisor selects a simple random sample of n batteries every hour and measures the lifetime of each. If she is convinced that the mean lifetime of all batteries produced that hour is less than 7 hours at the 5% significance level, then all those batteries are discarded. a. State appropriate hypotheses for the quality control...
In a properly validated biotechnology process (i.e., it was proven that the process occurs in the...
In a properly validated biotechnology process (i.e., it was proven that the process occurs in the same way each time it is run) three samples of the product are taken during a manufacturing stage to verify the percentage of the active ingredient. The researcher suspects that the first sample influences the result of the second and in turn the second influences the result of the third. For this reason, the researcher decided to compare lots to verify if the samples...