In: Accounting
Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis
Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 6,400 units of product were as follows:
Standard Costs | Actual Costs | ||
Direct materials | 8,300 lb. at $4.90 | 8,200 lb. at $4.70 | |
Direct labor | 1,600 hrs. at $17.40 | 1,640 hrs. at $17.60 | |
Factory overhead | Rates per direct labor hr., | ||
based on 100% of normal | |||
capacity of 1,670 direct | |||
labor hrs.: | |||
Variable cost, $3.30 | $5,230 variable cost | ||
Fixed cost, $5.20 | $8,684 fixed cost |
Each unit requires 0.25 hour of direct labor.
Required:
a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Price variance | $ | |
Quantity variance | $ | |
Total direct materials cost variance | $ |
b. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Rate variance | $ | |
Time variance | $ | |
Total direct labor cost variance | $ |
c. Determine variable factory overhead controllable variance, the fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Variable factory overhead controllable variance | $ | |
Fixed factory overhead volume variance | $ | |
Total factory overhead cost variance | $ |
Part A
Materials price variance = AQ *(AP-SP) =8200*(4.70-4.90) = -1640 =1640 favorable
Materials quantity variance = SP * (AQ-SQ) = 4.90*(8200-8300) = - 490 =490 Favorable
Total materials cost variance = 1640 favorable + 490 favorable = 2130 Favorable
Part B
Labor rate variance = AH* (AR - SR) =1640*(17.60-17.40)= 328 Unfavorable
Labor efficiency variance = SR *(AH - SH) =17.40*(1640-1600) =696 Unfavorable
Total direct labor cost variance = 328 Unfavorable + 696 Unfavorable = 1024 Unfavorable
Part C
Variable factory overhead controllable variance = actual variable factory overhead cost incurred - Budgeted variable factory overhead for 1600 hrs = 5230-(1600*3.30) =-50 =50 favorable
Fixed factory overhead volume variance = standard fixed factory overhead cost incurred *(hours at normal capacity - Standard hours for amount produced) = 5.20*(1670-1600)= 364 Unfavorable
Total factory overhead cost variance = 50 favorable + 364 Unfavorable = 314 Unfavorable