Question

In: Statistics and Probability

Thompson Photo Works purchased several new, highly sophisticated processing machines. The production department needed some guidance...

Thompson Photo Works purchased several new, highly sophisticated processing machines. The production department needed some guidance with respect to qualifications needed by an operator. Is age a factor? Is the length of service as an operator (in years) important? In order to explore further the factors needed to estimate performance on the new processing machines, four variables were listed:

  

X1 = Length of time an employee was in the industry
X2 = Mechanical aptitude test score
X3 = Prior on-the-job rating
X4 = Age

  

Performance on the new machine is designated Y.

  

      Thirty employees were selected at random. Data were collected for each, and their performances on the new machines were recorded. A few results are:

  

  Name Performance
on New
Machine,
Y
Length of
Time in
Industry,
X1
Mechanical
Aptitude
Score,
X2
Prior
on-the-Job
Performance,
X3


Age,
X4
  Mike Miraglia 111 7 315 127 50
  Sue Trythall 112 2 306 127 29

  

The equation is:

  

Yˆ Y⁢^⁢  = 11.5 + 0.9X1 + 0.886X2 + 0.212X3 + 0.003X4

  

a. What is this equation called?
  
(Click to select)Multiple regression equation, Multiple standard error of estimate, Coefficient of determination

  

b. How many dependent and independent variables are there?
  
(Click to select)One, Two, Three, Four, Five dependent, (Click to select)One, Two, Three, Four, Five independent

  

c. What is the number 0.212 called?
  
(Click to select)Regression coefficient, Coefficient of determination, Homoscedasticity, Multicollinearity

  

d.

As age increases by one year, how much does estimated performance on the new machine increase? (Round your answer to 3 decimal places.)

  

  

e.

Carl Knox applied for a job at Photo Works. He has been in the business for 3 years and scored 305 on the mechanical aptitude test. Carl’s prior on-the-job performance rating is 95, and he is 30 years old. Estimate Carl’s performance on the new machine. (Round your answer to 3 decimal places.)

  

Solutions

Expert Solution

A multiple regression equation

Where Y: dependent variable ; X1, X2,.....Independent variables;

b0, b1, b2 , ....are regression coefficients.

a. What is this equation called?

Multiple regression equation

b.
How many dependent and independent variables are there?

one Dependent variable :

Four Independent variables

c.

What is the number 0.212 called?

Regression coefficient.

d.

As age increases by one year, how much does estimated performance on the new machine increase?

Age is represented as X4 ; ie. As X4 is increased by 1 ; then the Y: estimated performance on the new machine increases by the coefficient of X4 i.e 0.003

Ans : 0.003

e.

Carl Knox applied for a job at Photo Works. He has been in the business for 3 years and scored 305 on the mechanical aptitude test. Carl’s prior on-the-job performance rating is 95, and he is 30 years old

i.e

X1 = Length of time an employee was in the industry=3 years
X2 = Mechanical aptitude test score=305
X3 = Prior on-the-job rating=95
X4 = Age=30

Substitute the values of  X1 = 3 ; X2 =305 ; X3 =95 ; X4 = 30 in the multiple regression equation:


Related Solutions

Thompson Photo Works purchased several new, highly sophisticated processing machines. The production department needed some guidance...
Thompson Photo Works purchased several new, highly sophisticated processing machines. The production department needed some guidance with respect to qualifications needed by an operator. Is age a factor? Is the length of service as an operator (in years) important? In order to explore further the factors needed to estimate performance on the new processing machines, four variables were listed: x1 = Length of time an employee was in the industry x2 = Mechanical aptitude test score x3 = Prior on-the-job...
Thompson Photo Works purchased several new, highly sophisticated processing machines. The production department needed some guidance...
Thompson Photo Works purchased several new, highly sophisticated processing machines. The production department needed some guidance with respect to qualifications needed by an operator. Is age a factor? Is the length of service as an operator (in years) important? In order to explore further the factors needed to estimate performance on the new processing machines, four variables were listed: x1 = Length of time an employee was in the industry x2 = Mechanical aptitude test score x3 = Prior on-the-job...
Thompson Photo Works purchased several new, highly sophisticated processing machines. The production department needed some guidance...
Thompson Photo Works purchased several new, highly sophisticated processing machines. The production department needed some guidance with respect to qualifications needed by an operator. Is age a factor? Is the length of service as an operator (in years) important? In order to explore further the factors needed to estimate performance on the new processing machines, four variables were listed: x1 = Length of time an employee was in the industry x2 = Mechanical aptitude test score x3 = Prior on-the-job...
Thompson Photo Works purchased several new, highly sophisticated processing machines. The production department needed some guidance...
Thompson Photo Works purchased several new, highly sophisticated processing machines. The production department needed some guidance with respect to qualifications needed by an operator. Is age a factor? Is the length of service as an operator (in years) important? In order to explore further the factors needed to estimate performance on the new processing machines, four variables were listed: X1 = Length of time an employee was in the industry. X2 = Mechanical aptitude test score. X3 = Prior on-the-job...
Thompson Photo Works purchased several new, highly sophisticated processing machines. The production department needed some guidance...
Thompson Photo Works purchased several new, highly sophisticated processing machines. The production department needed some guidance with respect to qualifications needed by an operator. Is age a factor? Is the length of service as an operator (in years) important? In order to explore further the factors needed to estimate performance on the new processing machines, four variables were listed: x1 = Length of time an employee was in the industry x2 = Mechanical aptitude test score x3 = Prior on-the-job...
3.    Thompson Machine Works purchased several new, highly sophisticated machines. The production department needed some guidance with...
3.    Thompson Machine Works purchased several new, highly sophisticated machines. The production department needed some guidance with respect to the qualifications needed by the operator. Is age a factor? Is the length of service as a machine operator important? In order to explore further the factors needed to predict performance on the new machines, four variables were listed:                         X1  =                length of time the employee was a machinist                                                  X2  =                mechanical aptitude test score                         X3  =               prior on-the-job rating                         X4  =                age Performance on the new machine is...
A company needs to purchase several new machines to meet its future production needs. It can...
A company needs to purchase several new machines to meet its future production needs. It can purchase three different types of machines A,B,andC. Each machine A costs $80,000 and requires 2,000 square feet of floor space. Each machine B costs$50,000 and requires 3,000 square feet of floor space. Each machine C costs $40,000 and requires 5,000 square feet of floor space. The machines can produce 200, 250 and 350 units per day respectively. The plant can only afford $500,000 for...