Question

In: Statistics and Probability

There are 50 parts that are checked using a GO-NOGO gauge. A GO reading would be...

  1. There are 50 parts that are checked using a GO-NOGO gauge. A GO reading would be considered a pass (or success) for the part. What is the probability that 37 parts will successfully pass?
  2. Given the following table determine the mean and standard deviation

Score

Frequency

0-8

15

9-17

3

18-26

25

27-35

4

36-44

3

Solutions

Expert Solution

a)

b)

Please like ?


Related Solutions

using visual basic how would i go about coding: if checkbox 1 is checked add 10...
using visual basic how would i go about coding: if checkbox 1 is checked add 10 to subtotal if checkbox 2 is checked add 50 to subtotal if checkbox 3 is checked add 100 to subtotal subtotal label is 'lblSubtotal' all 3 boxes are independent. example if checkboxes 1 and 3 are checked 110 would be added to subtotal.
In order to study the quality of parts, a batch of 100 parts was checked at...
In order to study the quality of parts, a batch of 100 parts was checked at the enterprise. The results are presented in the following table: Groups of parts by weight, g 40-50 50-60 60-70 70-80 80-90 90-100 100-110 110-120 Total Number of parts 2 4 11 19 21 25 10 8 100 Determine the mean, variance, mode, median, 1st and 3rd quartiles, coefficient of variation, plot a histogram, find asymmetry and kurtosis. Calculated indicators indicate in the figure.
An operator using a gauge measure collection of n randomly selected parts twice. Let Xi and...
An operator using a gauge measure collection of n randomly selected parts twice. Let Xi and Yi; denote the measured values for the ith part. Assume that these two random variables are independent and normally distributed and that both have true mean μi and variance 2. a) Derive the maximum likelihood estimator for 2. b) Compute the bias of the maximum likelihood estimator that you derived in part a). For part a, please explain how you obtained the likelihood function....
Parts coming off an assembly line in a manufacturing process are checked by one of three...
Parts coming off an assembly line in a manufacturing process are checked by one of three quality assurance technicians. Technician 1 receives 40% of parts, Technician 2 receives 25% of parts, and Technician 3 receives the remaining parts.Occasionally, even the best trained technicians can let a defective part slip through. Of the parts they receive, Technician 1 misses 5% of the parts that are defective. Technician 2 misses 7% of the parts that are defective. Technician 3 misses 3% of...
Would the mixed melting method (50:50 mixture of an unknown and one possibility) work using a...
Would the mixed melting method (50:50 mixture of an unknown and one possibility) work using a thermometer that reads 10 degrees high? Explain
Air at 50 ° C with 1.7 bar gauge pressure enters the cylindrical bearing system, the...
Air at 50 ° C with 1.7 bar gauge pressure enters the cylindrical bearing system, the diameter of which is below, and standing in an upright position, with an average flow rate of 2.6 m / s for drying purposes. In the fluid state, the porosity value of the bed is desired to be 0.61 m and its height 0.53 m. Inside the bed are fresh kidney beans with a diameter of 8 mm. a). When the air enters the...
A manager checked production records and found that a worker produced 165 units while working 50...
A manager checked production records and found that a worker produced 165 units while working 50 hours. In the previous week, the same worker produced 104 units while working 40 hours. a. Compute Current period productivity and Previous period productivity. (Round your answers to 2 decimal places.) Current period productivity Units / hr Previous period productivity Units / hr b. Did the worker's productivity increase, decrease, or remain the same? (Round your intermediate calculations and final answer to 2 decimal...
A manager checked production records and found that a worker produced 185 units while working 50...
A manager checked production records and found that a worker produced 185 units while working 50 hours. In the previous week, the same worker produced 116 units while working 40 hours. a. Compute Current period productivity and Previous period productivity. (Round your answers to 2 decimal places.) Current period productivity Units / hr Previous period productivity Units / hr b. Did the worker's productivity increase, decrease, or remain the same? (Round your intermediate calculations and final answer to 2 decimal...
A bin of 50 parts contains 5 that are defected. A sample of 10 parts is...
A bin of 50 parts contains 5 that are defected. A sample of 10 parts is selected at random without replacement. How many samples contain at least four defective parts? Please show work using factorials.
A day’s production of 850 parts contains 50 defective parts. Three parts are selected at random...
A day’s production of 850 parts contains 50 defective parts. Three parts are selected at random without replacement. Let the random variable ? equal the number of defective parts in the sample. 1. Find the probability mass function 2. Find the cumulative distribution function of ?. 3. Find ?(? > 0.5) = 4. Find ?(1.5) = 5. Find ?(2) − ?(0.3) = 6. Find ?(0.99 < ? < 2.5) =
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT