A typical kanban signal is an empty container designed to hold a standard quantity of material...

A typical kanban signal is an empty container designed to hold a standard quantity of material or parts b) when stock is available c) from a MRP based system. D) communication devices from the previous operation to the point of use

Solutions

Expert Solution

Correct option is a.

The typical Kanban signal is an empty container designed to hold a standard quantity of materials or parts. The question asks for a definition. The option which describes the question is point a.

option d is wrong as Kanban act as communication devices from the point of use to the previous operation and as visual communication tools and not vice verca.

option c is wrong as The kanban system is a pull system. The push system is also more commonly known as Material Requirement Planning (MRP) based system. Hence kanban signal does not come from a MRP based system/push system. It comes from Pull system.

option b: Kanbans are used to eliminate or reduce the wastes through an organization due to the pull system that is employed. Wastes can come from inventory and hence there is the need for a stockroom. option b does not define what is kanban signal. Due to this reason, this cannot be the correct answer.


Related Solutions

Standard cost information: Standard Quantity / Unit Standard Price Standard Cost / Unit Direct Material 2...
Standard cost information: Standard Quantity / Unit Standard Price Standard Cost / Unit Direct Material 2 $0.75 $1.50 Direct Labor 5 $0.35 $1.75 Variable Overhead 3 $1.20 $3.60 Actual cost information: Total Actual Used Total Actual Cost Direct Material 19,500 $19,500 Direct Labor 34,500 $15,750 Variable Overhead 18,000 $22,000 Do not enter dollar signs or commas in the input boxes. Round all Unit values to 2 decimal places. Round all other answers to the nearest whole number. Enter all variances...
Superlight Limited has the following standard information for its single product: Quantity Standard Price Standard Material...
Superlight Limited has the following standard information for its single product: Quantity Standard Price Standard Material 7 kilogram per unit $1.50 per kilogram Labour 2.5 hours per unit $20 per hour In March, the company produced 6,000 units. Actual data associated with March’s operations are as follows: Materials purchased 19,000 kilograms at a cost of $26,100 Material used in production 51,000 kilograms Labour used in production 14,500 hours at $23 per hour Required: Calculate the material price variance and material...
1. Craydye makes all sorts of moldings. Its standard quantity of material allowed is 1.1 foot...
1. Craydye makes all sorts of moldings. Its standard quantity of material allowed is 1.1 foot of wood per 1 foot of molding at a standard price of $3.37 per foot. During August, it purchased 220,032 feet of wood at a cost of $3.71 per foot, which produced only 202,646 feet of molding. Calculate the materials price variance. 2. During June, Cisco Company produced 1,323 chainsaw blades. The standard quantity of material allowed per unit was 1.88 pounds of steel...
Standard costing 1) Your organisation has just recorded a favourable direct material quantity variance. What are...
Standard costing 1) Your organisation has just recorded a favourable direct material quantity variance. What are some of the factors that could have caused this variance? 2) Are any of the factors you listed in your answer to (1) likely to impact on the magnitude of the direct material price variance or the direct labour variances? If so, how? 3) An organisation has just recorded an unfavourable total direct labour variance. What are the possible explanations for such a variance...