Question

In: Civil Engineering

The Problem involves building a 12 – foot diameter sewer at a bottom depth of 40...

The Problem involves building a 12 – foot diameter sewer at a bottom depth of 40 feet in loose sand with a water table at a depth of 8 feet. The alignment is along city streets. The project needs to be completed in 800 days. Determine the amount and types of equipment you feel should be used on this project. The sewer is ten miles in length.

Solutions

Expert Solution


Related Solutions

The involves building a 80 feet highX80X100 foot in dimension reinforced concrete structure with 3 -...
The involves building a 80 feet highX80X100 foot in dimension reinforced concrete structure with 3 - foot thick walls in the river that extends to twenty feet below river bottom in soft clay. Water depth at the location is 30 feet. The structure starts at 200 feet from the river edge where land is about 5 feet above the river level.The project needs to be completed in 800 days. Determine the amount and types of equipment you feel should be...
Description This problem involves forecasting techniques only Instructions Question 1 contains the actual values for 12...
Description This problem involves forecasting techniques only Instructions Question 1 contains the actual values for 12 periods (listed in order, 1-12). In Excel, create forecasts for periods 6-13 using each of the following methods: 5 period simple moving average; 4 period weighted moving average (0.63, 0.26, 0.08, 0.03); exponential smoothing (alpha = 0.23 and the forecast for period 5 = 53); linear regression with the equation based on all 12 periods; and quadratic regression with the equation based on all...
Problem 12-18 (Algorithmic) A building contractor is preparing a bid on a new construction project. Two...
Problem 12-18 (Algorithmic) A building contractor is preparing a bid on a new construction project. Two other contractors will be submitting bids for the same project. Based on past bidding practices, bids from the other contractors can be described by the following probability distributions: Contractor Probability Distribution of Bid A Uniform probability distribution between $530,000 and $730,000 B Normal probability distribution with a mean bid of $630,000 and a standard deviation of $43,000 If required, round your answers to three...
Problem 12-6 During 2015, Crane Company purchased a building site for its proposed research and development...
Problem 12-6 During 2015, Crane Company purchased a building site for its proposed research and development laboratory at a cost of $54,000. Construction of the building was started in 2015. The building was completed on December 31, 2016, at a cost of $360,000 and was placed in service on January 2, 2017. The estimated useful life of the building for depreciation purposes was 20 years. The straight-line method of depreciation was to be employed, and there was no estimated residual...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT