Question

In: Economics

Question 1 A company is considering drilling a development well. Wellsite preparation, drilling and testing of...

Question 1

A company is considering drilling a development well. Wellsite preparation, drilling and testing of the well is expected to cost $2.2 million. Completion of the well and the field equipment necessary to get the well ready for production (wellhead, tubing, flowline, etc.) would cost $1.4 million. Company geologists have suggested that there is a 20% probability that the well will be dry. If that is the case, abandonment and reclamation costs would be $150,000. In the event the well is successful (80% probability), it is anticipated that it would have an initial production rate of 80 barrels/day with production declining by 17% per year and an economic life of 13 years. A $150,000 abandonment and reclamation cost would have to be incurred at the end of the well’s economic life. Operating costs are expected to be $250,000 per year. Oil prices in the first year of production are expected to be $70/barrel and are expected to rise by 2% annually thereafter. Given a marginal opportunity cost of investment for the company of 18%, use the expected monetary value (EMV) criterion to determine whether this well should be drilled. Assume all capital costs occur in the present period (time 0) and production and operating costs begin in year 1.

Question 2

With respect to the previous question, suppose that, after drilling, testing reveals that the initial production rate would be 40 barrels/day instead. If capital costs, abandonment/reclamation costs, initial prices, operating costs and growth/decline rates all remain the same, would the company complete the well ? Note that the well’s economic life under the assumptions used here would be 9 years.

Solutions

Expert Solution


Related Solutions

Question 1 A company is considering drilling a development well. Wellsite preparation, drilling and testing of...
Question 1 A company is considering drilling a development well. Wellsite preparation, drilling and testing of the well is expected to cost $2.2 million. Completion of the well and the field equipment necessary to get the well ready for production (wellhead, tubing, flowline, etc.) would cost $1.4 million. Company geologists have suggested that there is a 20% probability that the well will be dry. If that is the case, abandonment and reclamation costs would be $150,000. In the event the...
A company is considering drilling a development well. Wellsite preparation, drilling and testing of the well...
A company is considering drilling a development well. Wellsite preparation, drilling and testing of the well is expected to cost $2.2 million. Completion of the well and the field equipment necessary to get the well ready for production (wellhead, tubing, flowline, etc.) would cost $1.4 million. Company geologists have suggested that there is a 20% probability that the well will be dry. If that is the case, abandonment and reclamation costs would be $150,000. In the event the well is...
A company is considering drilling four oil wells. The probability of success for each well is...
A company is considering drilling four oil wells. The probability of success for each well is 0.40, independent of the results for any other well. The cost of each well is $200,000. Each well that is successful will be worth $600,000. a) What is the probability that one or more wells will be successful? b) What is the expected number of successes? c) What is the expected gain? d) What will be the gain if only one well is successful?...
A company is considering drilling oil wells. The probability of success for each well is 0.20....
A company is considering drilling oil wells. The probability of success for each well is 0.20. The cost of each well is $5 (in1000). Each well that is successful will be worth $60 (in 1000). 1) If the company drills 4 wells, the probability of at least one successful well is 2) If the company drills 40 wells, the approximate probability of at most one successful well is 3) The expected profit and the variance of profit in 4 drillings...
Decision analysis. After careful testing and​ analysis, an oil company is considering drilling in two different...
Decision analysis. After careful testing and​ analysis, an oil company is considering drilling in two different sites. It is estimated that site A will net ​$20 million if successful​ (probability.2) and lose ​$4 million if not​ (probability.8​);site B will net ​$60 million if successful​ (probability.1) and lose ​$5 million if not​ (probability.9​). Which site should the company choose according to the expected return from each​ site?
Question 3 (25 marks) Kavango drilling Limited is a Rundu based mining company that provides drilling...
Question 3 Kavango drilling Limited is a Rundu based mining company that provides drilling services to mines in Namibia. They have been in business for the past five years and their success has been anchored on carrying out proper investment appraisals. However, their management accountant with whom they have worked with for the past five years has been offered a job with another company. This has happened at the time when they are considering two important projects. They have been...
1) While drilling a well, a kick was detected at 10100 ft depth, the driller immediately...
1) While drilling a well, a kick was detected at 10100 ft depth, the driller immediately closed in the well and recorded following data was data: Hole diameter = 8 1/2 inch Mud weight = 13.2 ppg Shut in drill pipe pressure (SIDPP) = 530 psi Shut in casing pressure (SICP) = 800 psi Pit gain =14 bbls Assuming that the slow pump rate @30 SPM = 360 psi and the Annular pressure loss (APL) = 210 psi Calculate each...
The management of Devine Instrument Company is considering the purchase of a new drilling machine, model...
The management of Devine Instrument Company is considering the purchase of a new drilling machine, model RoboDril 1010K. According to the specifications and testing results, RoboDril will substantially increase productivity over AccuDril X10, the machine Devine is currently using. The AccuDril was acquired 8 years ago for $80,000 and is being depreciated using the straight-line method over a 10-year expected life and an estimated salvage value of $20,000. The engineering department expects the AccuDril to keep going for another 3...
"An oil and gas company is considering whether to begin drilling a new oil field. The...
"An oil and gas company is considering whether to begin drilling a new oil field. The company will need to pay $4.6 million as an initial investment in order to extract the oil. The company will operate the field for a total of 5 years, during which its annual profit will be $3,344,000. During the 6th year, the company will not operate or gain any revenue from the oil field, but it will need to pay $8,990,000 in environmental remediation...
Assume that Western Exploration Corp. is considering the acquisition of Ogden Drilling Company. The latter has...
Assume that Western Exploration Corp. is considering the acquisition of Ogden Drilling Company. The latter has a $550,000 tax loss carryforward. Projected earnings for the Western Exploration Corp. are as follows: 2011 2012 2013 Total Values Before-tax income $ 205,000 $ 290,000 $ 410,000 $ 905,000 Taxes (35%) 71,750 101,500 143,500 316,750 Income available to stockholders $ 133,250 $ 188,500 $ 266,500 $ 588,250 a. How much will the total taxes of Western Exploration Corp. be reduced as a result...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT