Question

In: Statistics and Probability

2.a. You are running a batch reactor. Each batch takes about four hours to run. You...

2.a. You are running a batch reactor. Each batch takes about four hours to run. You measure the purity of the batch four times in the last hour to ensure that it has stabilized. You want to monitor the results using an X-R chart. The data you have collected for the first 10 batches are given the table below. X1, X2, X3 and X4 are the four samples you pull from the batch in the last hour. Using all the data, find trial control limits for and R charts, construct the chart, and plot the data. (30 pts)

2.b. Is the process in statistical control? Identify out-of-control points. (30 pts)

Subgroup

X1

X2

X3

X4

X

R

1

98.4

98.6

98.3

98.7

98.5

0.4

2

97.5

97.6

98.0

97.6

97.7

0.5

3

98.8

98.9

98.4

98.7

98.7

0.5

4

99.1

99.3

99.4

99.2

99.3

0.3

5

97.8

98.0

98.2

98.0

98.0

0.4

6

98.3

98.5

98.5

98.5

98.5

0.2

7

98.9

99.0

98.6

99.0

98.9

0.4

8

97.5

97.7

97.6

97.9

97.7

0.4

9

99.3

99.3

99.2

99.4

99.3

0.2

10

98.5

98.7

98.7

98.3

98.6

0.4

Solutions

Expert Solution

2a) From the given data

Subgroup X1 X2 X3 X4 X-Bar R
1 98.4 98.6 98.3 98.7 98.50 0.4
2 97.5 97.6 98 97.6 97.68 0.5
3 98.8 98.9 98.4 98.7 98.70 0.5
4 99.1 99.3 99.4 99.2 99.25 0.3
5 97.8 98 98.2 98 98.00 0.4
6 98.3 98.5 98.5 98.5 98.45 0.2
7 98.9 99 98.6 99 98.88 0.4
8 97.5 97.7 97.6 97.9 97.68 0.4
9 99.3 99.3 99.2 99.4 99.30 0.2
10 98.5 98.7 98.7 98.3 98.55 0.4
Total: 984.98 3.7

b) Control chart:

The process mean may not be stable. 6(60%) subgroups are out of control on the xbar chart.

Unusually small mean 2,5,8 sub groups and unusually large mean 4,7,8 sub groups in xbar chart


Related Solutions

2) Explain what each of Aristotle’s “four causes” would be for a batch of chocolate chip...
2) Explain what each of Aristotle’s “four causes” would be for a batch of chocolate chip cookies.
Mackenzie manages a store that sells cell phones. Each Boomer takes 2 hours to create the...
Mackenzie manages a store that sells cell phones. Each Boomer takes 2 hours to create the plastic pieces, 2 hours to create the electronics, and 16 hours of labor to assemble the final product. Each XL2000 requires 1 hours to create the plastic pieces, 4 hours to create the electronics, and 19 hours of labor to assemble the final product. The factory has 240 hours to create the plastic pieces, 400 hours to create the electronics, and 2030 hours of...
Without running the program, what happens if you run StackofStringsApp with “to be or not to...
Without running the program, what happens if you run StackofStringsApp with “to be or not to be that – is - - the question – whether tis nobler - - -“? Show how you came up with the answer (show your work). Write this on paper by hand. -------------------------------------------------------------------------------------------------------------------------------------------------------------------------- package stackofstringsapp; /****************************************************************************** * * % more tobe.txt * to be or not to - be - * * % java FixedCapacityStackOfStrings * to be or not to - be -...
Christmas Express makes wreaths in batch sizes of 15. The cutting & assembly process takes 2...
Christmas Express makes wreaths in batch sizes of 15. The cutting & assembly process takes 2 minutes per wreath and the decorating process time is 15 minutes per wreath. It takes 5 minutes to move the wreaths from the cutting & assembly process to the decorating process. Compute the value-added, non-value-added, and the total lead time of the wreath process. Value-added lead time: Non-value-added lead time: Move time Within batch wait time Total lead time Compute the value-added ratio. Round...
A sample of 100 lab rats run a complex maze and the time it takes each...
A sample of 100 lab rats run a complex maze and the time it takes each rat to complete the maze is recorded. It is shown that, on average, rats complete the maze in 2.55 minutes. From many replications of the same study over many decades, the standard deviation for all rats to complete the maze has been found to be 0.75 minutes. a.) With 95% confidence, calculate the expected average population mean of maze completion times. b.) If you...
each chair uses 10 lbs of wood and takes 10 hours to make. each table used...
each chair uses 10 lbs of wood and takes 10 hours to make. each table used 15lbs of wood and takes 5 hours to make. up to 150lbs of wood is available abd up to 110 hours. profit from eaxh chair = $3 , profit from each tabel = $4. max = profit a) write formulas b) graph feaseble region c) fund coordinates
1,000 mL was to run in over 10 hours. At 4 hours you noticed 300 mL...
1,000 mL was to run in over 10 hours. At 4 hours you noticed 300 mL left in the bag. What was the original rate with a drop factor of 15?_ ______ How would you recalculate the rate to catch up? _______ Is it safe to change this to the new rate? _________
Think Critically 10-2: Designing a WSUS Deployment. You manage a network with four domain controllers running...
Think Critically 10-2: Designing a WSUS Deployment. You manage a network with four domain controllers running Windows Server 2016, seven member servers running Windows Server 2016, four member servers running Windows Server 2012 R2, 100 Windows 10 computers, and 35 Windows 8.1 computers. You need to maintain updates and patches on all these computers. Explain how you would set up WSUS to do so. Which WSUS features would you use? What method would you use to allow you to target...
A machine is available 10 hours a day. Each part takes 90 minutes to fabricate and...
A machine is available 10 hours a day. Each part takes 90 minutes to fabricate and 10 minutes to setup 10% o the parts made are defect e and must go through the machine again to be reworked, during which both setup and fabrication have to be performed again. The machine is idle for any unused time Or average, 5 good parts are made each day. What is the overall equipment effectiveness of the machine?  0.17 0.75 0.075 0.83
4) If the US has 250,000 hours available to produce 2 goods: Wheat which takes 2...
4) If the US has 250,000 hours available to produce 2 goods: Wheat which takes 2 hours per ton of wheat to produce and Airplanes which takes 1,000 hours per airplane to produce. If China has 500,000 hours available to produce 2 goods: Wheat which take 5 hours per ton of wheat to produce and airplanes which takes 3,000 hours per airplane to produce. a. Draw the PPF diagram for the US assume they consume half of each product without...