  1. A new well is to be drilled in a developed area. The production data for a typical well in the area is shown in the Table below. These are used to forecast the production of the new well over an 11 year life. The initial production rate for wells in the area is bellow the allowable rate and thus there is no period of constant rate production. Other data are as follows:

Crude oil price = $30 per barrel

Royalty = 20%

Operating cost = $1500 /well/month

Mineral tax = 7% of gross working interest income

Investment = $440,000

  1. Using midyear discount rate, calculate the ROR (Rate of Return)
  2. Assume total production of 50,000 barrels, calculate the profit-to-investment ratio.

Year

Production

1

12400

2

11300

3

8000

4

5300

5

4200

6

3300

7

2600

8

2100

9

1600

10

1300

11

1000

Total

53100

Solutions

Expert Solution

Formulas used :-

Revenue
=C3*30
royalty
=D3*0.2
operating cost
=1500*12
gross working interest income
=D3-E3-F3
aftere tax income
=G3*(1-7%)
ROR =IRR(H2:H13,10%)
(b) Production 50000 =C16*30 =D16*0.2 =1500*12*11 =D16-E16-F16 =G16*(1-7%)
profit to investment =H16/-H2

Related Solutions

A natural gas well is being drilled in your community. It is estimated that amount of...
A natural gas well is being drilled in your community. It is estimated that amount of recoverable natural gas is equivalent to 5 MCF and that your community will use this fuel at an initial rate of 0.4 MCF/year, selling an additional 0.6 MCF/year back to the utility. Assuming that the annual rate of increase in consumption will be at 2%, determine how long (in years) it will take to exhaust this natural gas well
In a rural area only about 39% of the wells that are drilled find adequate water...
In a rural area only about 39% of the wells that are drilled find adequate water at a depth of 100 feet or less. A local man claims to be able to find water by​ dowsing, that​ is, using a forked stick to indicate where the well should be drilled. You check with 66 of his customers and find that 35 have wells less than 100 feet deep. Answer the questions below. ​(a) Write appropriate hypotheses. Upper H 0 :H0:...
What maximum temperature might be expected at the bottom of a well drilled within a relatively...
What maximum temperature might be expected at the bottom of a well drilled within a relatively high-grade geothermal energy such as Lightning Dock geothermal resource in southwest New Mexico? Please cite references
A well was drilled to 3000 meters depth with a casing of (9 5/8 inches) nine...
A well was drilled to 3000 meters depth with a casing of (9 5/8 inches) nine and five eigths inches with an internal diameter of 6,69 inches, they continued drilling up to 4800 meters obtaining a diameter of 6.7 inches average. Before finishing the drilling they made a test with a drill pipe of (5 1/2 inches) five and a half inches long with a diameter of 4,78 inches until the bottom of the well. If we consider that the...
Scammers Inc. has developed a new Immune Booster drink (IB) as well as a “cure” for...
Scammers Inc. has developed a new Immune Booster drink (IB) as well as a “cure” for Covid-19 based on Colloidal Silver (CS). As the product manager for the firm, you are responsible for setting the pricing policy for the new products. You are considering a bundled package that includes both products, and you assume the marginal cost of production is zero for planning purposes. You have identified four basic types of customers who may buy these new products, and their...
Response must: be in the form of a 100 to 250-word well-developed paragraph contain well-developed sentences,...
Response must: be in the form of a 100 to 250-word well-developed paragraph contain well-developed sentences, correct spelling, and proper grammar demonstrate your achievement of lesson objectives in your response include data, facts, key terminology, specific examples and direct quotations from the textbook and at least 1 other resource to support your main point include appropriate citation and a resource list for all sources used. Case Scenario: Your patient, a 70-year-old male recently admitted to the hospital, has a pCO2...
David Happy has developed a new product that he is considering the production and selling of...
David Happy has developed a new product that he is considering the production and selling of it. To proceed with this project, David will be renting a small building to rent for $1,250 a month that will house production facilities. Utility cost of building is expected to be $400 per month. One major piece of equipment that will be used to manufacture the product will be rented for $600 a month. Material costs to make the product are estimated at...
David Happy has developed a new product that he is considering the production and selling of...
David Happy has developed a new product that he is considering the production and selling of it. To proceed with this project, David will be renting a small building to rent for $1,250 a month that will house production facilities. Utility cost of building is expected to be $400 per month. One major piece of equipment that will be used to manufacture the product will be rented for $600 a month. Material costs to make the product are estimated at...
A company is considering the purchase of new equipment for its production area. The equipment has...
A company is considering the purchase of new equipment for its production area. The equipment has an initial cost of $ 3,000 with operation and maintenance costs, as well as the market liquidation value as shown in the following table: Year Costs of operation Rescue value 1 $1,000 $1,500 2 $1,700 $1,000 3 $2,400 $500 4 $3,100 $0 Determine the Optimal Economic Life of this investment, if the MARR of the company is 12%
In a reverse fault stressed area, a horizontal wellbore has been drilled parallel to maximum horizontal stress (VH).
In a reverse fault stressed area, a horizontal wellbore has been drilled parallel to maximum horizontal stress (VH). Consider two 180 deg angle apart completion strategies: perforation to the sides of the wellbore and perforation to the top and bottom of the wellbore. Using a schematic Mohr Circle plot explain which completion method results in a longer stable perforation tunnel.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT