In: Statistics and Probability
Quality Associates, Inc., a consulting firm, advises its clients about sampling and statistical procedures that can be used to control their manufacturing processes. In one particular application, a client gave Quality Associates a sample of 800 observations taken during a time in which that client’s process was operating satisfactorily. The sample standard deviation for these data was .21; hence, with so much data, the population standard deviation was assumed to be .21. Quality Associates then suggested that random samples of size 30 be taken periodically to monitor the process on an ongoing basis. By analyzing the new samples, the client could quickly learn whether the process was operating satisfactorily. When the process was not operating satisfactorily, corrective action could be taken to eliminate the problem. The design specification indicated the mean for the process should be 12. Corrective action will be taken any time H0 is rejected.
The samples were collected at hourly intervals during the first day of operation of the new statistical process control procedure. These data are available in the Excel file named Quality.
Managerial Report
3. Discuss the implications of changing the level of significance to a larger value. What mistake or error could increase if the level of significance is increased?