Question

In: Economics

4. A firm hires two workers to assemble bicycles. The firm values each bicycle assembled at...

4. A firm hires two workers to assemble bicycles. The firm values each bicycle assembled at $12. Alisha’s marginal cost of allocating effort to the production process is 2N, where N is the number of bicycles assembled per hour. Kyle’s marginal cost is 3N.

a) If the firm pays piece rates of $12 per bicycle assembled, what will be each worker’s hourly wage, and how many bikes will they each assemble in an 8-hour day?

Alisha’s wage:                                    # bikes assembled by Alisha:

Kyle’s wage:                                       # bikes assembled by Kyle:

b) Suppose the firm instead pays a time rate of $12 per hour and fires any worker who does not assemble at least 1 bicycle per hour. How many bicycles will each worker assemble in an 8 hour day?

# bikes assembled by Alisha:             # bikes assembled by Kyle:

c) Briefly explain the reason for the difference, if any, between your answers to (a) and (b).

d) If you own this firm, what is likely to influence whether you pay piece rate or time rate?

Solutions

Expert Solution


Related Solutions

5. (30 marks) A bicycle is assembled out of bicycle frame and two wheels. A) Write...
5. A bicycle is assembled out of bicycle frame and two wheels. A) Write down a production function of a firm that produces bicycles out of frames and wheels. The firm requires no assembly, so labour is not an input in this case. Sketch the isoquant that shows all combinations of frames and wheels that result in producing 100 bicycles. B) Suppose that initially the price of a frame is 400 dollars and price of a wheel is 50 dollars....
Write and assemble a program to load values into each of registers R20 – R24 and...
Write and assemble a program to load values into each of registers R20 – R24 and then push each of these registers onto the stack. Single-step the program, and examine the stack and the SP register after the execution of each instruction.
1. Consider a firm that hires quantities x1 and x2 of inputs one and two, at...
1. Consider a firm that hires quantities x1 and x2 of inputs one and two, at prices w1 and w2. The production function is given by f(x1,x2) = x1x2. 1.1 Does the firm’s technology exhibits constant, decreasing, or increasing returns to scale? 1.2 Form the cost-minimization problem for this firm, find the associated first-order conditions, and the conditional demand functions. 1.3 Find the cost function for this firm. 1.4 Indicate whether this firm exhibits increasing, decreasing, or constant average total...
Firm ABC uses two inputs, blue workers and purple workers (measured in number of workers) to...
Firm ABC uses two inputs, blue workers and purple workers (measured in number of workers) to produce output. At Firm ABC’s current input bundle, the marginal product of blue workers is two times the marginal product of purple workers. The wage for a purple worker is one third of the wage for a blue worker. Is the firm currently minimizing its cost of production?
Explain why cost minimization for each level of output implies that the firm hires that basket...
Explain why cost minimization for each level of output implies that the firm hires that basket of inputs for which a). the marginal rate of technical substitution equals the input price ratio. b). the marginal products per dollar of the two inputs are equal. If you use a diagram in your answer, make the diagram large and label all curves, axes, and points.
Explain why cost minimization for each level of output implies that the firm hires that basket...
Explain why cost minimization for each level of output implies that the firm hires that basket of inputs for which a). the marginal rate of technical substitution equals the input price ratio. b). the marginal products per dollar of the two inputs are equal. If you use a diagram in your answer, make the diagram is large and label all curves, axes, and points.
A firm is considering two projects, A and B. Each project will last for 4 years....
A firm is considering two projects, A and B. Each project will last for 4 years. The projects are INDEPENDENT. The projected cash flows for each project are shown below: Year 0 1 2 3 4 Project A -20.00 8.00 8.00 6.00 4.00 Project B -30.00 10.00 10.00 11.00 9.00 The cost of capital for the firm is 10.00%. What is the NPV for project A at the cost of capital? Answer Format: Currency: Round to: 2 decimal places.
Explain how firm and workers " match and mate" or " marry" each other in the...
Explain how firm and workers " match and mate" or " marry" each other in the labour market when there are many types of jobs offering various levels of risk to the worker. (a) Explain in detail what the slope of the hedonic wage function measure? Part (a) is a question on it's own.
In each of problems 1 through 4: (a) Find approximate values of the solution of the...
In each of problems 1 through 4: (a) Find approximate values of the solution of the given initialvalue problem at t=0.1, 0.2, 0.3, and 0.4 using the Euler methodwith h=0.1 (b) Repeat part (a) with h=0.05. Compare the results with thosefound in (a) (c) Repeat part (a) with h=0.025. Compare the results with thosefound in (a) and (b). (d) Find the solution y=φ(t) of the given problem and evaluateφ(t) at t=0.1, 0.2, 0.3, and 0.4. Compare these values with the...
IP Two bicycles approach one another, each traveling with a speed of 7.50 m/s . If...
IP Two bicycles approach one another, each traveling with a speed of 7.50 m/s . If bicyclist A beeps a 310 Hz horn, what frequency is heard by bicyclist B? Which of the following would cause the greater increase in the frequency heard by bicyclist B: (i) Bicyclist A speeds up by 1.50 m/s, or (ii) bicyclist B speeds up by 1.5 m/s?
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT