A Functional Configuration Audit looks at the useful qualities
of the arranged item and checks that the item has met the
necessities determined in its Functional Baseline documentation
endorsed at the Preliminary Design Review and Critical .
It needs to accomplish more with frameworks building and
program the executives that official examining.
The FCA is an audit of the setup thing's test and investigation
information to approve the planned capacity meets the framework
execution detail.
FCA is ordinarily performed
before Low-Rate Initial Production and preceding or related to a
Physical Configuration Audit . A fruitful FCA regularly exhibits
that Engineering and Manufacturing Development item is adequately
full grown for entrance into LRIP.
A FCA may likewise be directed simultaneously with the System
Verification Review .The issues that are tended to during a FCA
are:
Status issues for proceeding with plan, proceeding with checks,
creation, preparing, organization, activities, backing, and removal
have been settled.
Design reviews, including fulfillment of all change activities,
have been finished for all .
Hazard the board arranging is/has been refreshed for creation
.
Frameworks Engineering arranging is refreshed for creation
.
Basic accomplishments, achievement criteria and measurements
have been built up for creation.
In huge framework with complex Configuration Items the FCAs
might be cultivated in increases. Every addition may address a
particular useful zone of the framework and will report any
disparities that are found in the presentation capacities of that
increase.
. After the entirety of the additions have been finished, a
last FCA might be held to address the status of the entirety of the
activity things that have been recognized by the gradual gatherings
and to report the status of the FCA for the framework or CI in the
minutes and affirmations. Right now, review is adequately
cultivated with at least inconveniences.
The Program Management Office is at last answerable for the
presentation of reviews.
The Program Manager has by and large air expert on review
results and reports. The PM's designee, who might be the System
Engineer or Logistics Management Specialist will guarantee reviews
necessities are appropriately depicted in the agreement and the FCA
is appropriately executed.
general question for validation system
1.Describe what is function configuration Audit
please answer this question nice and neat (one Page or more
Please)
Question 41
Which of the following is not an example of a non-functional
business requirement.
audit and control
security
legal and licensing issues
reliability
context-level data flow diagram
Question 42
According to Carkenord, which of the following is not a core
requirement component?
Data
Process
Logic (business rules)
Design thinking
External agents
Question 43
Which of the following is not an example of a decomposition
diagram.
work breakdown structure
program hierarchy chart
use case description
organization chart
Question 44
Program...
What is audit risk?
What is the Audit Risk Model?
What are the components of audit risk and how do these relate
to each other?
How does materiality and the audit approach interact with the
Audit Risk Model?
What is the ground electronic configuration of phosphorous? How
many microstates does this configuration contain? Write the spin
arrow diagram for phosphorus. Derive the term and state symbols.
How many microstates does each state contain? Which state is the
ground state?