Question

In: Economics

a. Explain the relevance of minimum cost analysis in engineering economics B. Formulate a strong argument...

a. Explain the relevance of minimum cost analysis in engineering economics

B. Formulate a strong argument for applying minimum cost analysis to the design of a product in a plant that you own.  Please identify the product and explain how its design can benefit from the minimum cost analysis.

Solutions

Expert Solution

Engineering economics is the application of science. It established varied application systems based on different scientific principles. Efficient and effective functioning of the organization would certainly help it to provide goods/services at a lower cost which in turn will enable to fix a lower price for its goods or services.

Definition:

Engineering economics deals with the method that enable on to take economic decisions towards minimizing costs and maximizing benefits to the business organizations.

a)

Relevance of minimum cost analysis:

  • Costs as well as revenues are considered, for each alternative, for an analysis period that is either a fixed number of years or the estimated life of the project. The salvage value is often forgotten, but is important, and is either the net cost or revenue for decommissioning the project.
  • Cost–benefit analysis, sometimes also called benefit–cost analysis, is a systematic approach to estimating the strengths and weaknesses of alternatives used to determine options which provide the best approach to achieving benefits while preserving savings.
  • We will assume a clearing crew of 20 men is clearing road right-of-way and the following facts are available:

    1. Men are paid at the rate of $0.40 per hour.
    2. Time is measured from the time of leaving camp to the time of return.
    3. Total walking time per man is increasing at the rate of 15 minutes per day.
    4. The cost to move the camp is $50.

b)

Strong argument for applying minimum cost analysis to the design of a product in a plant:

  • Plant is a best alternative to minimum cost analysis .
  • Fixed capital
  • Manufacturing (direct)
  • Nonmanufacturing (indirect)
  • Working capital Product Costs
  • Manufacturing costs
  • Variable costs
  • Fixed costs
  • Overhead costs
  • General expenses
  • Administrative expenses
  • Distribution & Marketing costs

Benefit from the minimum cost analysis:

  1. Discount costs and benefits to obtain present values. This means converting future costs and benefits into present value. This is also known as the social discount rate, or the rate at which society makes tradeoffs over time. Every agency tends to have a different discount rate. It generally ranges between 2-7%.
  2. Set the framework for the analysis. Specify the program or policy change and the current status quo, or the state of the world before implementation compared to after.
  3. Decide whose costs benefits should be recognized. You need to determine the geographic scope of the analysis in order to limit the groups impacted by the policy.
  4. Project costs and benefits over the life of the program. Assess how costs and benefits will change each year. It is important to do this even before you begin to place numbers on things.
  5. Compute net present values. This is done by subtracting costs from benefits. The policy is considered efficient if a positive result is produced; however, it is important to think about the policy’s feasibility and social justice.
  6. Monetize costs. Make sure to place all costs in the same unit.
  7. Identity and categorize costs and benefits. It is important to label costs and benefits as direct (intended costs/benefits)/indirect (unintended costs/benefits), tangible (easy to measure and quantify)/intangible (hard to identify and measure), and real (anything that contributes to the bottom line net-benefits)/transfer (money changing hands) in order to ensure that you understand the effects of each cost and benefit.
  8. Monetize benefits. Make sure to place all benefits in the same unit.
  9. Make a recommendation. Assess all results and account for other qualitative considerations.
  10. Perform sensitivity analysis. This step allows you to check the accuracy of your estimates and assumptions. This is normally done by altering the social discount rate utilized, by increasing it and decreasing it. If you still get a positive number during this step, then the policy should be accepted. If you get a negative number during this step, then you should calculate where the balancing point is zero.

Related Solutions

A. Explain the relevance of minimum cost analysis in engineering economics. B. Formulate a strong argument...
A. Explain the relevance of minimum cost analysis in engineering economics. B. Formulate a strong argument for applying minimum cost analysis to the design of a product in a plant that you own. Please identify the product and explain how its design can benefit from minimum cost analysis..
1.Give definitions of below terms briefly. (a) Environmental economics vs engineering economics (b) Opportunity cost (c)...
1.Give definitions of below terms briefly. (a) Environmental economics vs engineering economics (b) Opportunity cost (c) Externality (d) Valuation of Environmental resources (e) Polluter pays / user pays principle 2.Please define and compare the terms “willingness to pay” and “affordability”.
Explain the characteristics of an "effective" minimum wage. What is the argument for the minimum wage?...
Explain the characteristics of an "effective" minimum wage. What is the argument for the minimum wage? What is the argument against the minimum wage?
Formulate a cost-benefit analysis for care at a distance, prevention and selfmanagement by the patient.
Formulate a cost-benefit analysis for care at a distance, prevention and selfmanagement by the patient.
Overall, do you think Saletan’s inductive argument is relatively strong or weak? Explain. it is an...
Overall, do you think Saletan’s inductive argument is relatively strong or weak? Explain. it is an article from William Saletan named "Please do not feed the humans"it is in practical arguemnt 4th edition why does he place the thesis where he does
Explain the relevance of earthing and bonding in an electrical Installation. (b) Explain how a load...
Explain the relevance of earthing and bonding in an electrical Installation. (b) Explain how a load is wired to an MCB and how the MCB is supplied with power from the distribution board.
Explain the relationship between engineering economic analysis and engineering design. How does economic analysis assist decision...
Explain the relationship between engineering economic analysis and engineering design. How does economic analysis assist decision making in the design process? Give an example. use any engineering design parameter as an example
EGN3613: Engineering Economics Analysis Assignment 1 What are the steps used in a decision making process?...
EGN3613: Engineering Economics Analysis Assignment 1 What are the steps used in a decision making process? Provide an example of the process in bank replacing their old ATM machines with new state of the art ones. Define the role of engineers in the Business Decision Making Process. Explain the difference between large and small scale Engineering Projects. Explain in details that factors that might affect Engineering Economic Decisions What does the Economic Principle “Marginal revenue must exceed marginal cost” means?...
Advanced Engineering Economy 1. What is benefit-cost analysis?
Advanced Engineering Economy 1. What is benefit-cost analysis?
Topic: Time Value money Subject: Engineering economics Explain the need for the consideration of Benefit to...
Topic: Time Value money Subject: Engineering economics Explain the need for the consideration of Benefit to Cost (BC) ratio as oppose to only taking the Present Worth (PW) into account. Provide a case study to justify your answer.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT