The oil company located near Germany wants to install a new pipeline to connect a storage tank to an existing pump 1,000 feet away. Three possible diameters are being considered to make the pipeline, the related costs of which are presented below:

The company is presumed to apply a 10% interest rate on its projects. Both maintenance and the annual cost of pumping are considered as expenses that occur at the end of the year (conventional flows).

For what number of pumping hours per year will the 4 and 6 inch pipelines be equally economical?

You must show in detail how you got your result. It is important that you submit the relevant evidence (cash flow equations, Excel, photo, etc.) in the link provided by this question for correction.

Pipeline diameter

4 pulg.

6 pulg.

8 pulg.

Initial cost

$2,000

$3,000

$4,000

Maintenance cost / year

600

500

400

Cost of pumping per hour

2.70

1.30

1.00

Residual value

100

150

300

Useful life (years)

10

10

10

Solutions

Expert Solution

Let us first see the PV Factors at 10%

Year PV Factor
0 1
1        0.909
2        0.826
3        0.751
4        0.683
5        0.621
6        0.564
7        0.513
8        0.467
9        0.424
10        0.386
       6.144

For 4 pulg.

Let number of hours be H

Present value = 2,000 + 600 X 6.144 + 2.70H X 6.144 - 100 X 0.386 = 16.5888 H + 5647.8

For 6 pulg

Let number of Hours be H

Present value = 3,000 + 500 X 6.144 + 1.30H X 6.144 - 150 X 0.386 = 7.9872 H + 6014.1

Since hours would be same

16.5888 H + 5647.8 = 7.9872 H + 6014.1
8.6061 H = 366.3
H = 42.5851 Hours

Here is the proof PV of both options is equal

Year PV Factor Amount Present value Amount Present value
0 1 2000 2000 3000 3000
1        0.909 714.9797712 649.916612 555.3606306 504.8228132
2        0.826 714.9797712 590.573291 555.3606306 458.7278809
3        0.751 714.9797712 536.9498082 555.3606306 417.0758336
4        0.683 714.9797712 488.3311837 555.3606306 379.3113107
5        0.621 714.9797712 444.0024379 555.3606306 344.8789516
6        0.564 714.9797712 403.248591 555.3606306 313.2233956
7        0.513 714.9797712 366.7846226 555.3606306 284.9000035
8        0.467 714.9797712 333.8955532 555.3606306 259.3534145
9        0.424 714.9797712 303.151423 555.3606306 235.4729074
10        0.386 614.9797712 237.3821917 405.3606306 156.4692034
       6.144 6354.235714 6354.235714

Related Solutions

An oil company installs a new pipeline to connect a storage tank to an existing pump...
An oil company installs a new pipeline to connect a storage tank to an existing pump 1,000 feet away. Three possible diameters are being considered to make the pipeline, the related costs of which are presented below: pipeline diameter 4 inch. 6 inch. 8inch. initial cost $2,000 $3,000 $4,000 maintnance cost per year 600 500 400 pumping cost per hour 2.70 1.30 1.00 residual value 100 150 300 useful life 10 10 10 The company is presumed to apply a...
An oil company wants to build a pipeline to take oil from an oil well to...
An oil company wants to build a pipeline to take oil from an oil well to a refinery. Unfortunately, the well and the refinery are on either side of a straight river which is 10 miles wide, and they are 50 miles apart along the coastline (that is, if you want to go from the well to the refinery you must first cross 10 miles of river and then go 50 miles along the side of the river). The company...
Two fuel storage tanks will be placed at an oil refinery near Bakersfield. The tanks are...
Two fuel storage tanks will be placed at an oil refinery near Bakersfield. The tanks are 10 m in diameter, are spaced center-to-center at 15 m, and contain fuel that has a Gs=0.95. The height of the fuel in the tanks is 4 m. Determine the stress change in the soil below the tanks at 4 locations: a) beneath the centerline between the tanks, b) beneath the edge closest to the other tank, c) beneath the center of one tank,...
Kinder Morgan, an oil and gas pipeline company, is contemplating the expansion of its TransMountain Pipeline,...
Kinder Morgan, an oil and gas pipeline company, is contemplating the expansion of its TransMountain Pipeline, which runs from Alberta to the British Columbia coast. The project is estimated to cost $7.4 billion and is expected to have a useful life of 15 years, with a salvage value of $0.5 billion. The new equipment will be added to an existing CCA Class with a rate of 5%. The pipeline expansion will increase capacity from the current level of 300,000 barrels...
Nabrich-co wants to buy a pipeline for oil transportation after nine years. The current cost of...
Nabrich-co wants to buy a pipeline for oil transportation after nine years. The current cost of the pipeline is $200,000. Inflation rate is 5%. Nabrich-co currently has $15,000 in a bank account that pays an interest rate of 14% compounded semiannually. Nabrich-co wants to save on a semiannually basis from now until the day it buys the pipeline. Compute the amount Nabrich-co has to save semiannually. After four years, nabrich-co decided to buy a pump. The current cost of the...
A company has hired you as a contractor to install their backbone to connect four 100base-T...
A company has hired you as a contractor to install their backbone to connect four 100base-T Ethernet LANs (each of which uses a 24port hub) for connection to the Internet. Let’s assume Cat5, Cat5e, Cat6, and optical fiber cables all have a fixed cost per circuit to purchase and install of $50, $60, $120, and $300, respectively (disregard the installation distance of the cables). For this assignment, consider how you would design an efficient backbone and create a total cost...
The new Fore and AftMarina is to be located on the Ohio River near Madison,...
The new Fore and Aft Marina is to be located on the Ohio River near Madison, Indiana. Assume that Fore and Aft decides to build a docking facility where one boat at a time can stop for gas and servicing. Assume that arrivals follow a Poisson probability distribution, with an arrival rate of 8 boats per hour, and that service times follow an exponential probability distribution, with a service rate of 10 boats per hour. The manager of the Fore...
Rosita wants to install a circular sink in her new triangular countertop.She wants to choose the...
Rosita wants to install a circular sink in her new triangular countertop.She wants to choose the largest sink that will fit.which point of concurrency must she locate? explain how to find the answer and make a sketch
The branch manager of a nationwide bookstore chain (located near a college campus) wants to study...
The branch manager of a nationwide bookstore chain (located near a college campus) wants to study characteristics of her store’s customers. She decides to focus on two variables: the amount of money spent by customers (on items other than textbooks) and whether the customers would consider purchasing educational DVDs related to graduate preparation exams such as the GMAT, CRE, or LSAT. The results from a sample of 70 customers are as follows: Amount spent; mean = $28.52, standard deviation =...
The new Fore and Aft Marina is to be located on the Ohio River near Madison,...
The new Fore and Aft Marina is to be located on the Ohio River near Madison, Indiana. Assume that Fore and Aft decides to build a docking facility where one boat at a time can stop for gas and servicing. Assume that arrivals follow a Poisson probability distribution, with an arrival rate of 4 boats per hour, and that service times follow an exponential probability distribution, with a service rate of 8 boats per hour. The manager of the Fore...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT