Question

In: Advanced Math

In a job shop operation, four jobs may be performed on any of four machines. The...

In a job shop operation, four jobs may be performed on any of four machines. The hours required for each job on each machine are presented in the following table. The plant supervisor would like to assign jobs so that total time is minimized. Find the best solution. Which assignments should be made?

Machine

Job

W

X

Y

Z

A12

10

14

16

13

A15

12

13

15

12

B2

9

12

12

11

B9

14

16

18

16

Solutions

Expert Solution


Related Solutions

In a small job shop department there are four jobs to be assigned to three workers....
In a small job shop department there are four jobs to be assigned to three workers. The table below indicates the weekly costs incurred by assigning each worker to each job. The objective is to find the optimal assignment that will minimize the total cost.                      Worker/Job │   I      II     III    IV A     │ 12      10    11    15   B     │ 13      16    14    12   C     │ 11 12    13    10       Formulate this problem as a linear programming model...
1. Production system of any product or service may be categorized as Job shop, Batch, Mass...
1. Production system of any product or service may be categorized as Job shop, Batch, Mass and Continuous production. Explain the characteristics of each system, identifying two advantages and two limitations of each system.
There are 5 jobs that have to be scheduled in a two-machine job shop system. The...
There are 5 jobs that have to be scheduled in a two-machine job shop system. The processing time and the sequence of the required operations of these jobs on the two machines are shown in the table below. For example, job A needs 6 hours on machine 1 (M1) and 4 hours on machine 2 (M2), and it has to be processed on M1 and then M2. You have to use the shortest processing time (SPT) rule to schedule the...
Techuxia Corporation worked on four jobs during October: Job A256, Job A257, Job A258, and Job...
Techuxia Corporation worked on four jobs during October: Job A256, Job A257, Job A258, and Job A260. At the end of October, the job cost sheets for these jobs contained the following data:    Job A256 Job A257 Job A258 Job A260 Beginning balance $ 1,060 $ 530 $ 0 $ 0 Charged to the jobs during October: Direct materials $ 2,820 $ 4,040 $ 1,530 $ 3,780 Direct labor $ 1,150 $ 880 $ 520 $ 310 Manufacturing overhead applied...
Techuxia Corporation worked on four jobs during October: Job A256, Job A257, Job A258, and Job...
Techuxia Corporation worked on four jobs during October: Job A256, Job A257, Job A258, and Job A260. At the end of October, the job cost sheets for these jobs contained the following data:    Job A256 Job A257 Job A258 Job A260 Beginning balance $ 1,050 $ 540 $ 0 $ 0 Charged to the jobs during October: Direct materials $ 2,840 $ 4,000 $ 1,420 $ 3,770 Direct labor $ 1,240 $ 840 $ 530 $ 360 Manufacturing overhead applied...
Job Costs At the end of May, Bergan Company had completed Jobs 200 and 305. Job...
Job Costs At the end of May, Bergan Company had completed Jobs 200 and 305. Job 200 is for 2,390 units, and Job 305 is for 2,053 units. The following data relate to these two jobs: On May 7, Bergan Company purchased on account 10,000 units of raw materials at $8 per unit. During May, raw materials were requisitioned for production as follows: 7,500 units for Job 200 at $8 per unit and 1,480 units for Job 305 at $5...
To test for any significant difference in the number of hours between breakdowns for four machines,...
To test for any significant difference in the number of hours between breakdowns for four machines, the following data were obtained. Machine 1 Machine 2 Machine 3 Machine 4 6.5 9.0 11.0 9.7 7.9 7.8 10.2 12.7 5.4 9.8 9.6 12.1 7.6 10.4 10.4 10.8 8.7 9.5 9.2 11.3 7.7 9.9 9.0 11.2 (a) At the α = 0.05 level of significance, what is the difference, if any, in the population mean times among the four machines? State the null...
To test for any significant difference in the number of hours between breakdowns for four machines,...
To test for any significant difference in the number of hours between breakdowns for four machines, the following data were obtained. Machine 1 Machine 2 Machine 3 Machine 4 6.6 8.6 10.9 9.7 8.0 7.4 10.3 12.7 5.5 9.5 9.7 11.9 7.7 10.0 10.2 10.6 8.7 9.3 9.1 11.1 7.9 9.8 8.6 11.2 Use Fisher's LSD procedure to test for the equality of the means for machines 2 and 4. Use a 0.05 level of significance. Find the value of...
To test for any significant difference in the number of hours between breakdowns for four machines,...
To test for any significant difference in the number of hours between breakdowns for four machines, the following data were obtained. Machine 1 Machine 2 Machine 3 Machine 4 6.5 8.9 10.7 9.9 7.8 7.7 10.0 12.9 5.4 9.6 9.4 12.0 7.5 10.2 10.0 10.7 8.4 9.5 8.9 11.2 7.6 9.9 8.6 11.7 (a) At the α = 0.05 level of significance, what is the difference, if any, in the population mean times among the four machines? State the null...
To test for any significant difference in the number of hours between breakdowns for four machines,...
To test for any significant difference in the number of hours between breakdowns for four machines, the following data were obtained. Machine 1 Machine 2 Machine 3 Machine 4 6.7 8.8 10.8 9.6 7.9 7.6 10.2 12.6 5.6 9.5 9.6 11.9 7.5 10.2 10.1 10.5 8.6 9.4 8.9 11.2 7.5 10.3 8.6 11.4 Find the value of the test statistic. (Round your answer to two decimal places.)___ Use Fisher's LSD procedure to test for the equality of the means for...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT