A can company reports that the number of breakdowns per 8-hour shift on its machine operated...

A can company reports that the number of breakdowns per 8-hour shift on its machine operated assembly line follows a Poisson distribution with a mean of 1.5.

  1. What is the probability of exactly three breakdowns on the midnight shift?
  2. What is the probability of greater than two breakdowns in one hour?
  3. What is the probability that the time between two successive breakdowns is at most three hours?
  4. If two hours have gone by without a breakdown, what is the probability that a breakdown will occur in the next one hour?

Solutions

Expert Solution

The solution to this problem is given by


Related Solutions

8 hour shift                                         &
8 hour shift                                                         Stage A 20 cars per hour               Initial set up time of 20 minute when changing the car model or size Stage B 20 cars per hour               Must be shut down for maintenance and cleaning for 30 minute after every 90 minute of operation Stage C 18 cars per hour               More customization, but no setups                                                                 PART A Single car model                               Stage A is already set up                                How many cars can be produced by...
   A local bottling company has determined the number of machine breakdowns                  ...
   A local bottling company has determined the number of machine breakdowns                      per month and their results are below:                                             Breakdowns (x)   Probability   (x-mean)^2              0 ............................0.15...............?    1 ............................0.41...............?    2 ............................0.22 ..............?    3 ............................0.17...............?    4 ............................0.04...............?    5 ............................0.01...............?    Use the SUMPRODUCT function in Excel to answer parts a and b.                             ...
Exhibit 5-4 A local bottling company has determined the number of machine breakdowns per month and...
Exhibit 5-4 A local bottling company has determined the number of machine breakdowns per month and their respective probabilities as shown below. Number of Breakdowns Probability 0 0.12 1 0.38 2 0.25 3 0.18 4 0.07 Refer to Exhibit 5-4. The expected number of machine breakdowns per month is? 2. The probability of at least 3 breakdowns in a month is 3. The probability of no breakdowns in a month is 4.The expected number of new clients per month is...
1. If a company can identify times of the day during an 8 hour work shift...
1. If a company can identify times of the day during an 8 hour work shift when accidents are most likely to occur extra precautions can be instituted during those times. A random sampling of the accident report records over the last year at the factory gives the following frequency of occurrence of accidents during the different hours of the work shift. Can it be concluded based upon the data in the table that the proportions of accidents are equal...
IN AN 8 HOUR SHIFT Stage A 20 cars per hour               Initial set up time of...
IN AN 8 HOUR SHIFT Stage A 20 cars per hour               Initial set up time of 20 minute when changing the car model or size Stage B 20 cars per hour               Must be shut down for maintenance and cleaning for 30 minute after every 90 minute of operation Stage C 18 cars per hour               More customization, but no setups Where would you place the buffers and what should the buffer capacity in terms of the number of cars? Assume a...
A company has 3 machines: A, B, and C. The number of breakdowns per week is...
A company has 3 machines: A, B, and C. The number of breakdowns per week is distributed Poisson. On average, machine A breaks down .4 times per week, machine B breaks down .45 times per week and machine C breaks down .9 times per week. The probability that there are 2 breakdowns in one week is _____ (round to 4 decimal places).
Action Motor Sports Company uses a machine that can produce 100 razor scooters per hour. The...
Action Motor Sports Company uses a machine that can produce 100 razor scooters per hour. The firm operates 12 hours per day, five days per week. Due to regularly scheduled preventive maintenance, the machines will have to be down 5% of the available time. Based on experience with other products produced during preventive maintenance, the firm expects to achieve an efficiency level for the wheels of 95%. Last week's production was 5,640 scooters, some 60 units below effective capacity a....
Suppose that the average number of equipment breakdowns at a factory per week is 5. Later...
Suppose that the average number of equipment breakdowns at a factory per week is 5. Later we’ll show that the average is our best guess at the expected value of ? = ?ℎ? ?????? ?? ????????? ?????????? ?? ? ????? ???? (assuming that this distribution stays the same across multiple weeks.) It’s also known that, through some other sample statistic, that our best guess at the standard deviation of X given the data is 0.8. a. With the help of...
72) Keeran Corporation estimates that its variable manufacturing overhead is $5.20 per machine-hour and its fixed...
72) Keeran Corporation estimates that its variable manufacturing overhead is $5.20 per machine-hour and its fixed manufacturing overhead is $242,048 per period. If the denominator level of activity is 6,200 machine-hours, the predetermined overhead rate would be: A) $520.00 per machine-hour B) $5.20 per machine-hour C) $44.24 per machine-hour D) $39.04 per machine-hour 73) Fleming Incorporated makes a single product—a critical part used in commercial airline seats. The company has a standard cost system in which it applies overhead to...
Keeran Corporation estimates that its variable manufacturing overhead is $6.50 per machine-hour and its fixed manufacturing...
Keeran Corporation estimates that its variable manufacturing overhead is $6.50 per machine-hour and its fixed manufacturing overhead is $280,080 per period. If the denominator level of activity is 7,200 machine-hours, the predetermined overhead rate would be: Multiple Choice $650.00 per machine-hour $38.90 per machine-hour $6.50 per machine-hour $45.40 per machine-hour
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT