In: Statistics and Probability
7)A researcher wishes to estimate, with 99% confidence, the population proportion of adults who think Congress is doing a good or excellent job. Her estimate must be accurate within
33% of the true proportion.
(a) No preliminary estimate is available. Find the minimum sample size needed.
(b) Find the minimum sample size needed, using a prior study that found that
32% of the respondents said they think Congress is doing a good or excellent job.
(c) Compare the results from parts (a) and (b).
8) A researcher wishes to estimate, with 99% confidence, the population proportion of adults who eat fast food four to six times per week. Her estimate must be accurate within
33% of the population proportion.
(a) No preliminary estimate is available. Find the minimum sample size needed.
(b) Find the minimum sample size needed, using a prior study that found that
44%
of the respondents said they eat fast food four to six times per week.
(c) Compare the results from parts (a) and (b).
6) In a survey of 2327 adults,727 say they believe in UFOs.
Construct a 90% confidence interval for the population proportion of adults who believe in UFOs.
7)A researcher wishes to estimate, with 99% confidence, the population proportion of adults who think Congress is doing a good or excellent job. Her estimate must be accurate within
33% of the true proportion.
(a) No preliminary estimate is available. Find the minimum sample size needed.
(b) Find the minimum sample size needed, using a prior study that found that
32% of the respondents said they think Congress is doing a good or excellent job.
(c) Compare the results from parts (a) and (b).
a)
If we have not given a prior estimate we take p = 0.5 for unbiasedness.
Margin of error = E = 0.33
Confidence level = C = 0.99
Zc = 2.58 ( Using z table)
p = 0.50
We have to find sample size (n)
b)
Margin of error = E = 0.33
Confidence level = C = 0.99
Zc = 2.58 ( Using z table)
p = 0.32
We have to find sample size (n)
c)
If the prior estimator is not given then the sample size large as compare to given prior estimator.
------------------------------------------------------------------------------------------------------------------------------------------
For the next question please repost!