In: Economics
See the graph to solve questions -
a) EMAX means emission maximum which can be calculated when we put MAC = 0
So, EMAX is 100
b) Total damage (TD) at E = EMAX = 100
From the graph area of triangle a + b + c or area of triangle OAB shows the total damage(TD) at E = EMAX= 100
Area of traingle =
( MD = 6E, so 600)
Therefore TD, at EMAX = 100 is $30000
c) At E = EMAX = 100, TAC is zero
d) AT E = EMAX = 100, costs to the pollutee is equal to the marginal demage at 100
Substitute E as 100
Therefore, Cost to the pollutee at EMAX = E is $600
Similarly
Similary
(MD = 6E , so 6*100)
Therefore total damage is a + b + c