Question

In: Physics

A. The Sunshine Skyway Bridge is 131 m high. A truck crossing the bridge loses a...

A. The Sunshine Skyway Bridge is 131 m high. A truck crossing the bridge loses a piece of cargo, launching it horizontally and perpendicularly off the bridge at 75 miles per hour. How far does the object travel horizontally before it hits the water?

B.The Sunshine Skyway Bridge is 131 m high. A truck crossing the bridge loses a piece of cargo, launching it horizontally and perpendicularly off the bridge at 75 miles per hour. How fast is it going when it hits the water?

Solutions

Expert Solution

(A)

Considering vertical motion, the cargo has zero initial vertical velocity. Cargo will cover 131 m vertically before it hits the water.

Time taken by the cargo to hit the water is given by

uy=0, sy=131 m

Since, the horizontal velocity remains constant, the horizontal distance covered by the cargo is

(B) From (A) , the time taken by the rock to hit the water is 5.17 seconds. The vertical component of the velocity of the rock when it hits the ground is given by

Again, initial vertical velocity of the rock is zero.

The velocity just before the rock hits the water is

Remember:The horizontal velocity of the rock is 75 mph which remains costant throughout the motion of the rock but the initial vertical velocity of the rock is 0 as the rock is launched horizontally and perpendicular to the bridge.


Related Solutions

The Sunshine Skyway Bridge is 131 m high. A truck crossing the bridge loses a piece...
The Sunshine Skyway Bridge is 131 m high. A truck crossing the bridge loses a piece of cargo, launching it horizontally and perpendicularly off the bridge at 75 miles per hour. How far does the object travel horizontally before it hits the water? 102 m 118 m 137 m 155 m 173 m The Sunshine Skyway Bridge is 131 m high. A truck crossing the bridge loses a piece of cargo, launching it horizontally and perpendicularly off the bridge at...
* You wanted to estimate the mean number of vehicles crossing a busy bridge in your...
* You wanted to estimate the mean number of vehicles crossing a busy bridge in your neighborhood each morning during rush hour for the past year. To accomplish this, you stationed yourself and a few assistants at one end of the bridge on 31 randomly selected mornings during the year and counted the number of vehicles crossing the bridge in a 10-minute period during rush hour. You found the mean to be 119 vehicles per minute, with a standard deviation...
Design the concrete mix according to the following conditions: Design Environment Caissons for Bridge pier crossing...
Design the concrete mix according to the following conditions: Design Environment Caissons for Bridge pier crossing to the Outer Bankers, NC Required design strength=4800psi Minimum dimension = 12 in. Minimum space between rebars = 2.5 in. Minimum cover over rebars = 2.5 in. Statistical data indicate a standard deviation of compressive strength of 250 psi is expected (more than 30 samples). Only air entrained is allowed. Available Materials Air entrainer: Manufacture specification is 0.15 fl oz/1% air/100 lb cement. Aggregate:...
Design the concrete mix according to the following conditions: Design Environment Caissons for Bridge pier crossing...
Design the concrete mix according to the following conditions: Design Environment Caissons for Bridge pier crossing to the Outer Bankers, NC Required design strength=4800psi Minimum dimension = 12 in. Minimum space between rebars = 2.5 in. Minimum cover over rebars = 2.5 in. Statistical data indicate a standard deviation of compressive strength of 250 psi is expected (more than 30 samples). Only air entrained is allowed. Available Materials Air entrainer: Manufacture specification is 0.15 fl oz/1% air/100 lb cement. Aggregate:...
When crossing the Golden Gate Bridge, traveling into San Francisco, all drivers must pay a toll....
When crossing the Golden Gate Bridge, traveling into San Francisco, all drivers must pay a toll. Suppose the amount of time (in minutes) drivers wait in line to pay the toll follows an exponential distribution with a probability density function of f(x) = 0.49eāˆ’0.49x. a. What is the mean waiting time that drivers face when entering San Francisco via the Golden Gate Bridge? (Round your answer to 2 decimal places.) b. What is the probability that a driver spends more...
When crossing the Golden Gate Bridge, traveling into San Francisco, all drivers must pay a toll....
When crossing the Golden Gate Bridge, traveling into San Francisco, all drivers must pay a toll. Suppose the amount of time (in minutes) drivers wait in line to pay the toll follows an exponential distribution with a probability density function of f(x) = 0.35eāˆ’0.35x. a. What is the mean waiting time that drivers face when entering San Francisco via the Golden Gate Bridge? (Round your answer to 2 decimal places.) b. What is the probability that a driver spends more...
A locomotive is accelerating at 1.6 m/s2 as it passes through a 30-m-wide crossing. After the...
A locomotive is accelerating at 1.6 m/s2 as it passes through a 30-m-wide crossing. After the locomotive leaves the crossing, how much time is required until its speed reaches 40?
A crossing track was constructed over a water channel with a total length of 1700 m...
A crossing track was constructed over a water channel with a total length of 1700 m and width of 40 m. If you know that the maximum flow that can be carried by the water channel is 400 m3/s over a 25-year storm event. Calculate: a. The probability that the crossing track will flood next year. b. The probability that the crossing track will flood at least once in the next 12 years. c. The probability that the crossing track...
1) A ball is kickedfrom the top of a bridge at a height of 50 m...
1) A ball is kickedfrom the top of a bridge at a height of 50 m (measured from the surface of the water below) with an initial speed of 30 [m/s] at 22 degrees with respect to the x-axis. a) Determine the time it takes for the ball to reach its maximum height. b) Determine the maximum height of the ball (measured from the water below) c) Determine the speed of the ball at its heighest point on its trajectory...
Suppose the demand for crossing the Chargem Bridge is given by Q = 10,000 ā€“ 1,000P where P is in $/car and Q is the number of cars per day.
Suppose the demand for crossing the Chargem Bridge is given by Q = 10,000 ā€“ 1,000P where P is in $/car and Q is the number of cars per day.If the toll (P) is $2/car, how much revenue is collected daily?What is the price elasticity of demand at this point?Could the bridge authorities increase their revenues by changing their price?The Crazy Canuck Lines, a ferry service that competes with the Chargem Bridge begins operating hovercrafts that make commuting by ferry...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT