In: Physics
The annual electricity production/consumption for the GRU (Gainesville Regional Utility) territory is about 1.9 million MWh/yr. Let’s assume that we can implement a significant energy efficiency program that can decrease the electricity consumption by 20%. It is also known that GRU has a 102.5 MW biomass power plant. With these facts and assumptions and your knowledge of solar energy, what size of PV array (in MW’s) needs to be installed for GRU to be 100% renewable powered for its annual electricity needs? Show all work and discuss the limitations of this approach.