Question

In: Accounting

In conducting interviews and observing factory operations to implement an activity-based costing system, you determine that...

In conducting interviews and observing factory operations to implement an activity-based costing system, you determine that several activities are unnecessary or redundant. For example, warehouse personnel was inspecting purchased components as they were received at the loading dock. Later that day, the components were inspected again on the shop floor before being installed in the final product. Both of these activities caused costs to be incurred but were not adding value to the product. If you include this observation in your report, one or more employees who perform inspections will likely lose their jobs. Page 804 Required As a plant employee, what is your responsibility to report your findings to superiors? Should you attempt to determine if the redundancy is justified? Explain. What is your responsibility to the employees whose jobs will likely be lost because of your report? What facts should you consider before making your decision to report or not??

Please do not answer in jpg format. kindly use word or txt.

Solutions

Expert Solution

Answer:

As a plant employee, what is your responsibility to report your findings to superiors?

Activities are of two type value added activities and non value added activities. So non value added activities do not add value to the product thereby should be reduced. But few non value added activities are essential non value added activities which means these are necessary in order to comply with standard requirements.The activities like inspection, checking, reworking,reporting are important in the process of production. These are important for the process of accountability and tracability. These do not add value to the activity but still it is important to carry these activities because these will help to give the right product to the customer.So when the components are received at dock it is important to inspect them because to know are the products are in good condition, whether those are damaged/defective or not. Is the quantity ordered is received or less is received. So inspection is really important else whatever is received will be accepted which will in turn will make the company product defective.Now the product was inspected again before being installed in final product this is also an essential non value added activity, because to fulfill the standard set for the product we have to inspect that right component is installed in final product. Let say if the employee do not inspect and wrong product is installed in the final product than the defective product will be manufactured which is having more loss than the cost of inspection.So according to me these are  essential non value added activity which needs to be done in order to comply with regulatory or set standards.

Should you attempt to determine if the redundancy is justified? Explain.

Redundancy is not justified as inspection is an activity which needs to be carried so that we receive right component in first situation and in second situation do not produce defective product.

What is your responsibility to the employees whose jobs will likely be lost by your report?

My responsibility is to make them sure that their role is also important in the process of production so need not worry that they will lose the jobs. I will mention that what type of activity you are doing and how it will help the organization.

What facts should you consider before making your decision to report or not?

The facts which we should consider that is this activity avoidable or not and is it important in the process of producing goods, will it help to give the product with right specification to customers. Will it be helpful to maintain regulatory requirements. All the standard specification are met. So as per this what I should consider in report is to mention the importance of inspection activities as essential non value added activities which should not affect the job of one or more employees.


Related Solutions

In conducting interviews and observing factory operations to implement an activity-based costing system, you determine that...
In conducting interviews and observing factory operations to implement an activity-based costing system, you determine that several activities are unnecessary or redundant. For example, warehouse personnel were inspecting purchased components as they were received at the loading dock. Later that day, the components were inspected again on the shop floor before being installed in the final product. Both of these activities caused costs to be incurred but were not adding value to the product. If you include this observation in...
In conducting interviews and observing factory operations to implement an activity-based costing system, you determine that...
In conducting interviews and observing factory operations to implement an activity-based costing system, you determine that several activities are unnecessary or redundant. For example, warehouse personnel was inspecting purchased components as they were received at the loading dock. Later that day, the components were inspected again on the shop floor before being installed in the final product. Both of these activities caused costs to be incurred but were not adding value to the product. If you include this observation in...
In conducting interviews and observing factory operations to implement an activity-based costing system, you determine that...
In conducting interviews and observing factory operations to implement an activity-based costing system, you determine that several activities are unnecessary or redundant. For example, warehouse personnel was inspecting purchased components as they were received at the loading dock. Later that day, the components were inspected again on the shop floor before being installed in the final product. Both of these activities caused costs to be incurred but were not adding value to the product. If you include this observation in...
In conducting interviews and observing factory operations to implement an activity-based costing system, you determine that...
In conducting interviews and observing factory operations to implement an activity-based costing system, you determine that several activities are unnecessary or redundant. For example, warehouse personnel were inspecting purchased components as they were received at the loading dock. Later that day, the components were inspected again on the shop floor before being installed in the final product. Both of these activities caused costs to be incurred but were not adding value to the product. If you include this observation in...
Explain how Morrison Pump Company could implement an activity-based costing (ABC) system. When you are deciding...
Explain how Morrison Pump Company could implement an activity-based costing (ABC) system. When you are deciding on a company to use, consider the costs and benefits in implementing an ABC system. In your post, provide some background information about your company. Explain what it produces and identify the activities that would drive costs. Discuss the cost pools that it would use. Recommend the process it would need to go through to implement ABC in the company. http://www.morrisonpump.com/
Mastery Problem: Activity-Based Costing (Advanced) Activity-Based Costing Traditionally, Overhead cost: Sometimes referred to as "factory overhead,"...
Mastery Problem: Activity-Based Costing (Advanced) Activity-Based Costing Traditionally, Overhead cost: Sometimes referred to as "factory overhead," this is an indirect cost that is not directly tied to the production of units, yet nonetheless must be built into product cost in order to appropriately price it. Examples are managerial salaries, rent expense, setup costs, and property taxes.overhead costs are assigned based arbitrarily on the rate of either Direct labor: This is a labor cost directly associated with the production of goods...
Dodo Inc., uses activity-based costing to determine product margins. In the first stage, the activity-based costing...
Dodo Inc., uses activity-based costing to determine product margins. In the first stage, the activity-based costing system allocates two overhead accounts--equipment depreciation and supervisory expense--to three activity cost pools--Machining, Order Filling, and Other--based on resource consumption. Data pertinnent to perform these allocations appears below: Overhead costs: Equipment depreciation $ 107,000 Supervisory expense $ 9,900 Distribution of Resource Consumption Across Activity Cost Pools: Activity Cost Pools Machining Order Filling Other Equipment depreciation 0.60 0.30 0.10 Supervisory expense 0.60 0.20 0.20 In...
What costs are affected by an Activity Based Costing system? By a Traditional Absorption Costing system?
What costs are affected by an Activity Based Costing system? By a Traditional Absorption Costing system?
What costs are affected by an Activity Based Costing system? By a Traditional Absorption Costing system?
What costs are affected by an Activity Based Costing system? By a Traditional Absorption Costing system?
You are part of a team responsible for implementing an activity-based costing system. Some of the...
You are part of a team responsible for implementing an activity-based costing system. Some of the members do not understand the steps involved in implementing such a system. Prepare a summary showing your team members the steps involved and a brief description of each step that are completed in the process.