Question

In: Economics

Valles Global Industries has decided to address the issue of affordable housing. To do so, they...

Valles Global Industries has decided to address the issue of affordable housing. To do so, they have decided to attack it using systems engineering strategies. Thus, you have been assigned to develop a first-cut assessment of how to proceed. Refer to slide #2 in episode 5 for characteristics of large-scale systems. In five double-spaced pages or less develop an assessment of the characteristics.

here are the characteristics of system engineering.

•Complex - properties are not fully explained by an understanding of its component parts. Complex systems consist of a large number of mutually interacting and interwoven parts, entities or agents.

•Adaptive – able to adjust to different conditions, environment

•Emergent Behavior - the process of complex pattern formation from simpler rules.

•Intelligent - Endowed with the capacity to reason.

•Wicked - Have incomplete, contradictory, and changing requirements. The solution of one of its aspects may reveal or create another, even more complex problem

•System of Systems…

Solutions

Expert Solution


Related Solutions

Valles Global Industries has decided to address the issue of affordable housing. To do so, they...
Valles Global Industries has decided to address the issue of affordable housing. To do so, they have decided to attack it using systems engineering strategies. Thus, you have been assigned to develop a first-cut assessment of how to proceed.
The cosmetics division of Valles Global Industries (VGI) sells a special type of organic perfume that...
The cosmetics division of Valles Global Industries (VGI) sells a special type of organic perfume that is highly sought after. This perfume sells for $150 per 75 ml bottle. For many years, they have sold in Asia through a Seoul-based importer by the name of Park Beauty Products. Their contract with Park Beauty Products is up for renewal and VGI has decided to look at options. You are in charge of making a recommendation. Option 1: Continue to sell through...
Valles Global Industries (VGI) is getting ready to market their Internet-based party planning service. One of...
Valles Global Industries (VGI) is getting ready to market their Internet-based party planning service. One of the menu items is a kabob. The kabob was designed to have four vegetable chunks and three chunks of protein: beef, chicken, shrimp or tofu. On average, any vegetable will yield 5 chunks suitable for a kabob. One of any ten vegetables will be of poor quality and cannot be used. In presenting a menu and budget to a party-thrower, VGI recommends two kabobs...
Valles Global Industries (VGI) is considering purchasing a new 3-D prototyping machine that costs $650,000. Installation...
Valles Global Industries (VGI) is considering purchasing a new 3-D prototyping machine that costs $650,000. Installation costs $85,000.   a) If they borrow money at 12%, how many hours a month must be rented at $150 per hour to unsuspecting users so they exactly cover their purchase and loan costs? Use a three-year life. b) Recently, VGI discovered a new lender who will lend them money at 8%. This lender wants VGI to pay them 20% of each month’s rental over...
How do the global and local reflexes address the optimization of the ventilation : perfusion ratio...
How do the global and local reflexes address the optimization of the ventilation : perfusion ratio (keeping it close to 1)?
Too-big-to-fail is a key issue in global financial crisis 2008. Do you think whether this issue...
Too-big-to-fail is a key issue in global financial crisis 2008. Do you think whether this issue is fully resolved by regulatory bodies? Why or why not?
Boise Lumber has decided to enter the lucrative prefabricated housing business. Initially, it plans to offer...
Boise Lumber has decided to enter the lucrative prefabricated housing business. Initially, it plans to offer three models: standard, deluxe, and luxury. Each house is prefabricated and partially assembled in the factory, and the final assembly is completed on site. The dollar amount of building material required, the amount of labor required in the factory for prefabrication and partial assembly, the amount of on-site labor required, and the profit per unit are as follows. Standard Model Deluxe Model Luxury Model...
Boise Lumber has decided to enter the lucrative prefabricated housing business. Initially, it plans to offer...
Boise Lumber has decided to enter the lucrative prefabricated housing business. Initially, it plans to offer three models: standard, deluxe, and luxury. Each house is prefabricated and partially assembled in the factory, and the final assembly is completed on site. The dollar amount of building material required, the amount of labor required in the factory for prefabrication and partial assembly, the amount of on-site labor required, and the profit per unit are as follows. Standard Model Deluxe Model Luxury Model...
Boise Lumber has decided to enter the lucrative prefabricated housing business. Initially, it plans to offer...
Boise Lumber has decided to enter the lucrative prefabricated housing business. Initially, it plans to offer three models: standard, deluxe, and luxury. Each house is prefabricated and partially assembled in the factory, and the final assembly is completed on site. The dollar amount of building material required, the amount of labor required in the factory for prefabrication and partial assembly, the amount of on-site labor required, and the profit per unit are as follows. Standard Model Deluxe Model Luxury Model...
Boise Lumber has decided to enter the lucrative prefabricated housing business. Initially, it plans to offer...
Boise Lumber has decided to enter the lucrative prefabricated housing business. Initially, it plans to offer three models: standard, deluxe, and luxury. Each house is prefabricated and partially assembled in the factory, and the final assembly is completed on site. The dollar amount of building material required, the amount of labor required in the factory for prefabrication and partial assembly, the amount of on-site labor required, and the profit per unit are as follows. Standard Model Deluxe Model Luxury Model...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT