Question

In: Statistics and Probability

A manufacturing company wish to solve a problem in its production line. The production manager develops...

A manufacturing company wish to solve a problem in its production line. The production manager develops a hypothesizes test to make sense in general manager’s mind. Production manager use the information below:

The null and alternative hypothesis of

?0: ?=0 versus ?1: ? ≠ 0

A sample correlation of 0.35 for a random sample of size n = 40 (Confidence level is %90).

Test the null hypothesis based on the given information above.

Solutions

Expert Solution

To test the null hypothesis and alternative hypothesis:

H​​​​​​0: The population correlation coefficient is not significantly different from zero.

i.e.H0: =0

Against

H​​​​​​1 : The population correlation coefficient is significantly different from zero.

i.e.H1: 0

= population correlation coefficient

The given information is:

r= sample correlation coefficient=0.35

n= sample size=40

Test statistic:

Is follow t-distribution with (n-2) degrees of freedom

t=2.3032

Cal | t |= 2.3032

critical value for n-1=40-2=38 degrees of freedom at 10% (i.e. 90% confidence interval) level of Significance is:

tab t= 1.684

P-value at 38 degrees of freedom and 10 % level of Significance is:

p-value =0.02683

Cal | t | > tab t and p-value < 0.10

Therefore,we reject null hypothesis H​​​​​​0 at 10% level of Significance.

Conclusion:

There is sufficient evidence to conclude that the population correlation coefficient is significantly different from zero.


Related Solutions

You work for a candy company and the manufacturing manager claims that the production line produces...
You work for a candy company and the manufacturing manager claims that the production line produces bags of candy with an average of exactly 50 candies per bag.   You are skeptical about this and you decide to test the claim by counting the candies in a sample of 25 bags. You discover in your sample that x = 48and s = 5. Determine whether or not you have enough statistical evidence to reject the manager's claim with a significance level...
You are manager of a manufacturing business. Business is going very well and one production line...
You are manager of a manufacturing business. Business is going very well and one production line is at full capacity. You want to double the size of the production line. Engineering has estimated the cost and time required. It can be accomplished without effecting the existing production. The timing of the cash flows for the facility is as follows. Month Cash Flow 1 $       (20,000.00) 2 $       (45,000.00) 3 $       (55,000.00) 4 $       (70,000.00) 5 $       (75,000.00) 6 $       (80,000.00)...
You are the production manager for a part manufacturing company. There are 2 manufacturing locations, plant...
You are the production manager for a part manufacturing company. There are 2 manufacturing locations, plant A and B. you suspect there is a difference in the proportion of rejected parts that are manufactured at Plant A as compared to plant B. for a week you observed: Plant A Plant B total Rejected parts 120 80 200 Acceptable parts 1880 1920 3800 2000 2000 4000 The proportion of rejected parts was 200/4000=5%. If there were no difference between the proportion...
The production manager for the XYZ manufacturing company is concerned that the customer orders are being...
The production manager for the XYZ manufacturing company is concerned that the customer orders are being shipped late. He asked one of his planners to check the timeliness of shipments for 900 orders. The planner randomly selected 900 orders and found that 100 orders were shipped late. Construct the 99% confidence interval for the proportion of orders shipped late.
The production manager for the XYZ manufacturing company is concerned that the customer orders are being...
The production manager for the XYZ manufacturing company is concerned that the customer orders are being shipped late. He asked one of his planners to check the timeliness of shipments for 900 orders. The planner randomly selected 900 orders and found that 180 orders were shipped late. Construct the 95% confidence interval for the proportion of orders shipped late. Please show all work, please type so it is legible, thank you
A production line manager wants to determine how well the production line is running. He randomly...
A production line manager wants to determine how well the production line is running. He randomly selected 90 items off of the assembly line and found that 8 were defective. (Assume all conditions have been satisfied for building a confidence interval). Find the 99% confidence interval. (0.0234, 0.1099) (0.0116, 0.1662) (0.0301, 0.1477) (0.0396, 0.1382)
Justin Brody is the production manager for a math textbook manufacturing company. The company produces Geometry...
Justin Brody is the production manager for a math textbook manufacturing company. The company produces Geometry and Calculus texts. Each Geometry text generates a profit of $80 and requires 3 hours assembly time and 4 hours of proofing. Each Calculus text generates $45 of profit and requires 5 hours of assembly and 2 hours of proofing. There are 360 hours of assembly time and 240 hours of proofing time available each month. Find the number of Geometry and Calculus texts...
A manufacturing company uses an acceptance scheme on items from a production line before they are...
A manufacturing company uses an acceptance scheme on items from a production line before they are shipped. Boxes of 20 items are readied for shipment. An inspector takes one item at random, inspects it, and then replaces it in the box; the next 8 inspectors do likewise. Finally, a tenth inspector goes through the same procedure. Find the probability that 3 inspectors find defective in the box containing 2 defectives. (Round from the fifth decimal place to the fourth decimal...
A manufacturing company operates two production lines.when both lines are operating,the production rate on each line...
A manufacturing company operates two production lines.when both lines are operating,the production rate on each line is 500 units per hour.At this production rate on each line is 500 per hour.At this production rate the failure rate of line 1 is 3 failures per 8-hr day(CFR) and the failure rate of line 2 is 2 failures per 8-hr day.when one line fails.the production rate of the second line must be increased in order to make production quotas.At the increased rate...
You are the production manager at a parachute manufacturing company. Parachutes are woven in your factory...
You are the production manager at a parachute manufacturing company. Parachutes are woven in your factory using a synthetic fiber purchased from 1 of 4 different suppliers. The factory uses 2 types of looms, the Athenian and the Spartan. You are concerned about the consistency of parachute strength, so you measure the strength for 5 parachutes made with each of the 4 fiber suppliers, using each of the 2 looms. Perform an ANOVA with these data for main effects and...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT