Generally we purify the material prior to feeding it to process unit . There are many cases in which we cannot utilize materials without purification whether these are obtained from nature (for example, crude oil, Ore,) or prepared in the laboratory. Either Separation or purification by some method is necessary.

there are many examples

1. crude oil - the raw crude oil extracted from the oil wells can not be used directly because it contains many impurities such as high carbon chains compound and some elemental impurities that can harm our process operations. As a consequnce to prevent our process units from some undesirable hazards we first purify crude oils in different fracions.

example- Distillation of crude oil

2. Evaporation - In evaporation we can purify drinking water because we know that if we drink impure water that can cause many desease in human body.

example - Nacl formation from sea water

3. Screening- i will take one familiar example of wheat floor.

when wheat comes from grounds contains sand particles and some other materials. if we will not screen these materials then we will not get the desired quality of wheat floor. so we can understand that if we want to maintain quality, uniformity, similarity of product then we need to give feed also in pure form.


Related Solutions

when would one purposely add an inert material to a feed stream ? illustrate this strategy...
when would one purposely add an inert material to a feed stream ? illustrate this strategy with an example, and explain the advantages (and disadvantages) of doing this.
The standard cost for material and labour in a manufacturing process is provided per unit as:...
The standard cost for material and labour in a manufacturing process is provided per unit as: Material cost 5kgs                         shs.50 Labour cost 20hours                     shs.10 Material consumed in producing 500 units was Shs.25,650 against 2,700kgs of material. Wages paid was Sh6,050 for 11,600 hours, including 20 hours which was idle time due to machine breakdown. Required: Material cost variance Material price variance Material usage variance Labour cost variance Labour rate variance
In general, What condition must exist prior to calculating process capability? Discuss how process capability can...
In general, What condition must exist prior to calculating process capability? Discuss how process capability can be estimated through control charts.
Rustica Ltd. uses one raw material for one of their products. The standard cost per unit...
Rustica Ltd. uses one raw material for one of their products. The standard cost per unit at the beginning of the year was £28, made up as follows: Standard material cost per unit = 7 kg per unit @ £4 per kg = £28 In the middle of the year, the supplier had changed the specification of the material slightly due to problems experienced in the country of origin, so that the standard had to be revised as follows: Standard...
Consider the bill of material for Product "J": To make one unit of "J", it needs...
Consider the bill of material for Product "J": To make one unit of "J", it needs one unit of "K" and two units of "M". To make one unit of K, it requires 4 units (Corrected) of "L" . The gross requirements for J are 200 units in week 6 and 250 units in week 8.   Use the data given in the following table, develop the MRP tables for each item for an 8-week planning period. Use the lot-for-lot lot-sizing rule....
Cost standards for one unit of product no. C 1895: Direct material 3 pounds at $2.70...
Cost standards for one unit of product no. C 1895: Direct material 3 pounds at $2.70 per pound $ 8.10 Direct labor 7 hours at $7.70 per hour 53.90 Actual results: Units produced 5,600 units Direct material purchased 26,200 pounds at $2.90 $ 75,980 Direct material used 16,500 pounds at $2.90 47,850 Direct labor 40,300 hours at $7.50 302,250 Assume that the company computes variances at the earliest point in time. The direct-material price variance is: Multiple Choice None of...
Norther Leasing Corp. has the following standards for one unit of product: Direct material: 80 pounds...
Norther Leasing Corp. has the following standards for one unit of product: Direct material: 80 pounds X $6 $480 Direct labor: 3 hours X $16 per hour 48 Variable overhead: 1.5 hours of machine time X $50 per hour 75 Fixed overhead: 1.5 hours of machine time X $30 per hour 45 The predetermined OH rates were developed using a practical capacity of 6,000 units per year. Production is assumed to occur evenly throughout the year. During May 2010, the...
Norther Leasing Corp. has the following standards for one unit of product: Direct material: 80 pounds...
Norther Leasing Corp. has the following standards for one unit of product: Direct material: 80 pounds X $6 $480 Direct labor: 3 hours X $16 per hour 48 Variable overhead: 1.5 hours of machine time X $50 per hour 75 Fixed overhead: 1.5 hours of machine time X $30 per hour 45 The predetermined OH rates were developed using a practical capacity of 6,000 units per year. Production is assumed to occur evenly throughout the year. During May 2010, the...
A manufacturer uses process costing.  It has one direct material cost pool and one conversion cost pool.  Information...
A manufacturer uses process costing.  It has one direct material cost pool and one conversion cost pool.  Information for the month is as follows:                                                                     Beginning of Month       End of Month Work in process:                                           20,000 units                  8,000 units Conversion (% of completion in WIP):             35%                                65% Costs of Materials in WIP:                            $  81,000                             ? Costs of Conversion in WIP:                         $115,000                             ? During the month: Units started during the month:           69,000 units Costs incurred for Materials:           $300,000    Costs incurred for Conversion:        $270,000 Total Spoiled Units detected:                  4,398 units Other Income Statement Information: Sales:                                                  $920,000 Admin expenses                                $200,000 92% of direct...
What problems would you foresee in naming equipment in a process that had a unit number of
What problems would you foresee in naming equipment in a process that had a unit number of 10 (for example, pumps starting with P-11, P-12, etc.)?
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT