ANS 1. a) Major problem that can cause network design failure :

- Hardware Failure : If a device that is connected in a network design fails this will eventually lead to the failure of the entire network.

- Warn out equipments : There can be many old devices that can lead to network failure, because they might not be able to work at their full potential.

- Possible Security threat : If there is any attack on the system that can increase the load on the system and eventually decrease system performance.

- Damage in the equipment : This can be caused due to any temperature conditions, increased humidity and also due to water damage.

- Power failure : When there is no backup and a short circuit leads to power failure than the network can fail.

- Routing problem : This can be caused by a configuration error .

b) Major problem that cause LAN design failure :

- Damaged card of Ethernet : those cards which are of bad quality of installed will lead to failure of LAN in the long run.

- Undesirable protocols : Sometimes the devices connected to LAN are installed with extra useless protocol that becomes cumbersome and brings fault to the network.

- Poor Switch assignment : This is the case in which too many devices are connected to a single switch this causing LAN bottleneck condition.

- Server overload : this can cause LAN failure because the server is not maintained up to the mark.

- Damaged devices : The device that are connected to LAN if they are worn out and not working according to the needs can lead to LAN failure.

- Power blackout : if there is complete failure of power to the devices connected to LAN.


Related Solutions

3) Discuss some general design considerations when making welding fixtures and also discuss some general clamping...
3) Discuss some general design considerations when making welding fixtures and also discuss some general clamping considerations when making welding fixtures.
Explain the methodologies and design issues that will need to be addressed by the network architect...
Explain the methodologies and design issues that will need to be addressed by the network architect when planning and designing a network. Also, detail how hardware, software, data, and media will determine the technology implemented. Include discussion on how devices such as switches, routers, and IOS function within a network.
Discuss some ways in which psychology is being applied to the general public and everyday problems.
Discuss some ways in which psychology is being applied to the general public and everyday problems.
Discuss some of the problems associated with general ledger systems that do not have datacoding schemes.
Discuss some of the problems associated with general ledger systems that do not have datacoding schemes. 
What is called Supertargetting in Heat Exchanger Network Design? How Heat Exchanger Network Design can be...
What is called Supertargetting in Heat Exchanger Network Design? How Heat Exchanger Network Design can be done by paying attention to Supertargetting?
Define “transportation network” and discuss the network analysis problems that are interest in transportation engineering while...
Define “transportation network” and discuss the network analysis problems that are interest in transportation engineering while explaining how the problems are interconnected. Discuss how the quality of a transportation network is assessed?
10. Discuss the advantages and disadvantages of the network organization design.
10. Discuss the advantages and disadvantages of the network organization design.
Examine Figure |-4 and discuss where and how problems can arise that can cause the resulting information to be bad or ineffective.
Examine Figure |-4 and discuss where and how problems can arise that can cause the resulting information to be bad or ineffective. 
Question 1 Cash flow problems are a major cause of insolvency and it is often created...
Question 1 Cash flow problems are a major cause of insolvency and it is often created by the delay in payments by customers. Cash flow planning involves making sure that a business generates enough cash at the right time to meet pressing liabilities. For example, many manufacturing businesses have a cash cycle. They buy raw materials (parts) on credit and then manufacture goods, which they store as Inventory (stock). They then sell these goods on credit (funds, which may be...
Question 1 Cash flow problems are a major cause of insolvency and it is often created...
Question 1 Cash flow problems are a major cause of insolvency and it is often created by the delay in payments by customers. Cash flow planning involves making sure that a business generates enough cash at the right time to meet pressing liabilities. For example, many manufacturing businesses have a cash cycle. They buy raw materials (parts) on credit and then manufacture goods, which they store as Inventory (stock). They then sell these goods on credit (funds, which may be...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT