Question

In: Operations Management

The Attaran Corporation manufactures two electrical​ products: portable air conditioners and portable heaters. The assembly process...

The Attaran Corporation manufactures two electrical​ products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each heater must go through 2 hours of wiring and 1 hour of drilling. During the next production​ period, 240 hours of wiring time are available and up to 130 hours of drilling time may be used. Each air conditioner sold yields a profit of ​$20. Each heater assembled may be sold for a ​$16 profit.

Number of air conditioners to be produced​ =_____ ​(round your response to two decimal​ places).
Number of heaters to be produced​ = _______​(round your response to two decimal​ places).
Optimal solution value​ = _______​(round your response to two decimal​ places).

Solutions

Expert Solution

Number of air conditioners to be produced​ = 0
Number of heaters to be produced​ = 120
Optimal solution value​ = $1920

The problem is formulated in excel as below. The below 2 images show the formulation as well as the formulas used. The objective function to maximize is highlighted in green and the decision variables are highlighted in yellow.

Post these the solver parameters need to be entered as per the below image.

Once this is done, click on solve. The solver will solve the problem and show the message stating the same. Click on ok. The excel will now have the final solution as per below image.

Hence we can see that final solution is as below

Air conditioners : 0

Heaters : 120

Profit : 1920


Related Solutions

The Electrocomp Corporation manufactures two electrical products: air conditioners and large fans. The assembly process for...
The Electrocomp Corporation manufactures two electrical products: air conditioners and large fans. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each fan must go through 2 hours of wiring and 1 hour of drilling. During the next production period, 240 hours of wiring time are available and up to 140 hours of drilling time may be used....
Allen Air Conditioning manufactures room air conditioners at plants in Houston?, Phoenix?, and Memphis. These are...
Allen Air Conditioning manufactures room air conditioners at plants in Houston?, Phoenix?, and Memphis. These are sent to regional distributors in Dallas?, Atlanta?, and Denver. The shipping costs? vary, and the company would like to find the least cost way to meet the demands at each of the distribution centers.??Dallas needs to receive 800 air conditioners per? month, Atlanta needs 500?, and Denver needs 350. Houston has 850 air conditioners available each? month, Phoenix has 650?, and Memphis has 300....
Quality Air Conditioning manufactures three home air conditioners: an economy model, a standard model, and a...
Quality Air Conditioning manufactures three home air conditioners: an economy model, a standard model, and a deluxe model. The profits per unit are $65, $97, and $139, respectively. The production requirements per unit are as follows: Number of Fans Number of Cooling Coils Manufacturing Time (hours) Economy 1 1 8 Standard 1 2 12 Deluxe 1 4 14 For the coming production period, the company has 350 fan motors, 360 cooling coils, and 3000 hours of manufacturing time available. How...
An air conditioning company manufactures three home air conditioners: a regular model, a super model, and...
An air conditioning company manufactures three home air conditioners: a regular model, a super model, and a deluxe model. The profits per unit are $50, $70, and $140, respectively. The production requirements per unit and the availability of the three resources are given below: Regular Model Super Model Deluxe Model Available Number of fans 1 1 1 420 Number of cooling coils 1 2 4 650 Manufacturing Time 10 15 20 4500 hours How many regular models, super models, and...
Quality Air Conditioning manufactures three home air conditioners: an economy model, a standard model, and a...
Quality Air Conditioning manufactures three home air conditioners: an economy model, a standard model, and a deluxe model. The profit per unit are $63, $95, and $135, respectively. The production requirements per unit are as follows.        Number       Number of           Manufacturing    of Fans Cooling Coils Time (hours) Economy   1           1               8 Standard   1           2               12 Deluxe   1           4               14 For...
Quality Air Conditioning manufactures three home air conditioners: an economy model, a standard model, and a...
Quality Air Conditioning manufactures three home air conditioners: an economy model, a standard model, and a deluxe model. The profits per unit are $63, $95, and $135, respectively. The production requirements per unit are as follows: Number of Fans Number of Cooling Coils Manufacturing Time (hours) Economy Economy   1 1 8 Standard 1 2 12 Deluxe 1 4 14 For the coming production period, the company has 200 fan motors, 320 cooling coils, and 2400 hours of manufacturing time available....
Quality Air Conditioning manufactures three home air conditioners: an economy model, a standard model, and a...
Quality Air Conditioning manufactures three home air conditioners: an economy model, a standard model, and a deluxe model. The profits per unit are $69, $91, and $127, respectively. The production requirements per unit are as follows: Number of Fans Number of Cooling Coils Manufacturing Time (hours) Economy 1 1 8 Standard 1 2 12 Deluxe 1 4 14 For the coming production period, the company has 200 fan motors, 340 cooling coils, and 2800 hours of manufacturing time available. How...
Quality Air Conditioning manufactures three home air conditioners: an economy model, a standard model, and a...
Quality Air Conditioning manufactures three home air conditioners: an economy model, a standard model, and a deluxe model. The profits per unit are $59, $89, and $137, respectively. The production requirements per unit are as follows: Number of Fans Number of Cooling Coils Manufacturing Time (hours) Economy 1 1 8 Standard 1 2 12 Deluxe 1 4 14 For the coming production period, the company has 250 fan motors, 380 cooling coils, and 2600 hours of manufacturing time available. How...
Quality Air Conditioning manufactures three home air conditioners: an economy model, a standard model, and a...
Quality Air Conditioning manufactures three home air conditioners: an economy model, a standard model, and a deluxe model. The profits per unit are $67, $95, and $133, respectively. The production requirements per unit are as follows: Number of Fans Number of Cooling Coils Manufacturing Time (hours) Economy 1 1 8 Standard 1 2 12 Deluxe 1 4 14 For the coming production period, the company has 300 fan motors, 340 cooling coils, and 2000 hours of manufacturing time available. How...
Quality Air Conditioning manufactures three home air conditioners: an economy model, a standard model, and a...
Quality Air Conditioning manufactures three home air conditioners: an economy model, a standard model, and a deluxe model. The profits per unit are $61, $99, and $135, respectively. The production requirements per unit are as follows: Number of Fans Number of Cooling Coils Manufacturing Time (hours) Economy 1 1 8 Standard 1 2 12 Deluxe 1 4 14 For the coming production period, the company has 250 fan motors, 360 cooling coils, and 2600 hours of manufacturing time available. How...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT