Question

In: Statistics and Probability

Consider the double lot-by-lot sampling plan:                            Accept a lot      

  1. Consider the double lot-by-lot sampling plan:

                           Accept a lot                                                  Reject a lot

n1 = 8                           x1 = 0                                                   x1 =2

n2 = 8                           x1 + x2 =1                                            x1 + x2 = 2

Using this plan, what is the probability of rejecting a shipment of 40 circuit boards containing 2 defective boards? using hypergeometric probability distribution

Solutions

Expert Solution


Related Solutions

1. Consider a single sampling plan with a lot size of 1500, sample size of 150,...
1. Consider a single sampling plan with a lot size of 1500, sample size of 150, and acceptance number of 3. Construct the OC curve. If AQL is 0.05% (0.0005) nonconforming, and the LQL is 6% nonconforming, describe the protection offered by the plan at these quality levels. 2. Same thing at sample size of 200. 3. Construct the Outgoing Quality Curve for #1. What is the AOQL? 4. Construct the ATI curve for #1. If the process average nonconformance...
A pharmaceutical company receives large shipments of ibuprofen tablets and uses sampling plan to accept the...
A pharmaceutical company receives large shipments of ibuprofen tablets and uses sampling plan to accept the shipmemts. They randomly select and test 30 tablets, and accept the entire batch if there is at most one tablet that does not meet the required specifications. Suppose a particular shipment of ibuprofen tablets has a 10% rate of defects. What is the probability that this whole shipment will be accepted? Round your answer to 3 decimal places.
Question 3: A double sampling plan is such that n1=50=n2, c1=1 and c2=4. If the fraction...
Question 3: A double sampling plan is such that n1=50=n2, c1=1 and c2=4. If the fraction nonconforming is ? =0.15, what is the probability of acceptance on the first sample? What is the probability of the final acceptance? Calculate the probability of rejection on the first sample.
Let N=15,000 and a double sampling plan with n1=40, n2= 80, c1=1, c2=2, r1=r2=c2+1. The lotOs...
Let N=15,000 and a double sampling plan with n1=40, n2= 80, c1=1, c2=2, r1=r2=c2+1. The lotOs fraction defective is 2%. Compute the probability of accepting lot in the first sample.
Describe the audit sampling plan to perform a test of controls
Describe the audit sampling plan to perform a test of controls
A single-sampling plan has ? = 0.01, ? = 0.01, ?2 = 0.05, and ? =...
A single-sampling plan has ? = 0.01, ? = 0.01, ?2 = 0.05, and ? = 0.02. What should be the sample size ? and acceptance number ??
For an acceptance sampling plan with n = 25 and c = 0, find the probability...
For an acceptance sampling plan with n = 25 and c = 0, find the probability of accepting a lot that has a defect rate of 4%. (Round your answer to four decimal places.) What is the probability of accepting the lot if the defect rate is 8%? (Round your answer to four decimal places.)
An acceptance sampling plan with and has been designed with a producer’s risk of .075. Was...
An acceptance sampling plan with and has been designed with a producer’s risk of .075. Was the value of .01, .02, .03, .04, or .05? What does this value mean? What is the consumer’s risk associated with this plan if is .25? I already know the answer to this but could you please show me how to get the answer using excel
In the table below are selected values for the OC curve for the acceptance sampling plan...
In the table below are selected values for the OC curve for the acceptance sampling plan n = 210, c = 6. Upon failed inspection, defective items are replaced. Calculate the AOQ for each data point. (You may assume that the population is much larger than the sample.) Plot the AOQ curve. At approximately what population defective rate is the AOQ at its worst? Explain how this happens. How well does this plan meet the specifications of AQL = 0.015,...
Why are workers willing to accept a pay-as-you-go unfunded plan for Social Security, but not for...
Why are workers willing to accept a pay-as-you-go unfunded plan for Social Security, but not for a private pension plan?