1. The following data resulted from a study taken on a horizontal milling machine:

Pieces produced per cycle: 8.

Average measured cycle time: 8.36 minutes.

Average measured effort time per cycle: 4.62 minutes

. Average rapid traverse time: 0.08 minutes.

Average cutting time power feed: 3.66 minutes.

Performance rating: 115 percent.

Allowance (machine time): 10 percent

. Allowance (manual time): 15 percent.

The operator works on the job a full eight-hour day and produces 380 pieces. How many standard hours does the operator earn? What is her efficiency for the eight-hour day?

2. An analyst has estimated that there will be an 84% learning curve for an assembly operation. The first assembly takes 48 minutes and the standard time is set at 6 minutes.

a. How long will it take the operator to reach the standard time?

b. Unfortunately, the operator falls ill after the first week on the new assembly operation and returns after one week. What will be the estimated time for the operator to reach standard time now?

Solutions

Expert Solution

Answer: Standard hours operator earn =8.094 pieces per day

Answer: Efficiency==1.012 pieces per hour

The following data resulted from a study taken on a horizontal milling machine:

Pieces produced per cycle: 8.

Average measured cycle time: 8.36 minutes.

Average measured effort time per cycle: 4.62 minutes

Average rapid traverse time: 0.08 minutes.

Average cutting time power feed: 3.66 minutes.

Performance rating: 115 percent.

Allowance (machine time): 10 percent

Allowance (manual time): 15 percent.

The operator works on the job a full eight-hour day and produces 380 pieces.

How many standard hours does the operator earn?

*Allowance (machine time taken as 1.10) and 1 represents one day of operation.

Standard power feed cycle time= Average cutting time power feed+ Average rapid traverse time * 1 *1.10

=(3.66+0.08)*1*1.10=4.114 minutes

  • Allowance (manual time taken as 1.15)

Standard manual time cycle= Average measured cycle time- (Average cutting time power feed+ Average rapid traverse time )*1.15*1.15

=(8.36-(3.66+0.08))*1.15*1.15=6.110 minutes

Standard time= Standard power feed cycle time+ Standard manual time cycle

=10.224 minutes

Standard rate per piece=standard time/ 8

=10.224/8=1.278 minutes

Standard hours operator earn=standard rate per piece*(number of pieces produced per day/60)

=1.278* (380/60)

Answer =8.094 pieces per day

What is her efficiency for the eight-hour day?

Efficiency= Standard hours operator earn/8 hours a day

=8.094/8

Answer: Efficiency==1.012 pieces per hour

  • I have answered question 1 please resubmit the second for answering.”

Related Solutions

The following data resulted from a study taken on a horizontal milling machine: Pieces produced per...
The following data resulted from a study taken on a horizontal milling machine: Pieces produced per cycle: 8. Average measured cycle time: 8.36 minutes. Average measured effort time per cycle: 4.62 minutes. Average rapid traverse time: 0.08 minutes. Average cutting time power feed: 3.66 minutes. Performance rating: 115 percent. Allowance (machine time): 10 percent. Allowance (manual time): 15 percent. The operator works on the job a full eight-hour day and produces 380 pieces. How many standard hours does the operator...
The following data are taken from a study conducted by the National Park System, of which...
The following data are taken from a study conducted by the National Park System, of which Death Valley is a unit. The ground temperatures (°F) were taken from May to November in the vicinity of Furnace Creek. Compute the mean, median, mode,midrange,range, sample standard deviation and variance. 146 180 152 178 168 178 174 168 180 165 178 152 179 144
A sample of 18 observations taken from a normally distributed population produced the following data: 28.5...
A sample of 18 observations taken from a normally distributed population produced the following data: 28.5 27.5 25.3 25.3 31.3 23.3 26.2 24.5 28.3 37.4 23.9 28.8 27.5 25.5 27.1 25.5 22.7 22.7 Round your answers to three decimal places. a. What is the point estimate of μ? x¯=   b. Make a 90% confidence interval for μ. c. What is the margin of error of estimate for μ in part b? E=
1.       A study of demand for coffee from Sarah’s Coffee, LLC resulted in the following regression...
1.       A study of demand for coffee from Sarah’s Coffee, LLC resulted in the following regression equation:                                                                                        (.005)    ( .047)     (.078) where Q is the number of bags of coffee sold monthly, P is the price for a bad of Sarah’s coffee, Y is per capita income of the surrounding area, and PP is the price of pastry at Sarah’s coffee shop. The p-value for each coefficient is shown in parenthesis. The R2 = 0.46. Answer the following:...
The accompanying data resulted from a study of the relationship between y = brightness of finished...
The accompanying data resulted from a study of the relationship between y = brightness of finished paper and the independent variables x1 = hydrogen peroxide (% by weight), x2 = sodium hydroxide (% by weight), x3 = silicate (% by weight), and x4 = process temperature. x1 x2 x3 x4 y 0.2 0.2 1.5 145 83.9 0.4 0.2 1.5 145 84.9 0.2 0.4 1.5 145 83.4 0.4 0.4 1.5 145 84.2 0.2 0.2 3.5 145 83.8 0.4 0.2 3.5 145...
How hot does it get in Death Valley? The following data are taken from a study...
How hot does it get in Death Valley? The following data are taken from a study conducted by the National Park System, of which Death Valley is a unit. The ground temperatures (°F) were taken from May to November in the vicinity of Furnace Creek. Compute the mean, median, and mode for these ground temperatures. (Enter your answers to one decimal place.) 144 152 167 176 187 182 183 187 182 167 182 164 152 142
The following selected data were taken from the accounting records of Colorado Enterprises: Month Machine Hours...
The following selected data were taken from the accounting records of Colorado Enterprises: Month Machine Hours Manufacturing Overhead May 47,000 $ 899,000 June 60,400 1,134,000 July 70,000 1,295,700 August 53,000 982,000 Manufacturing overhead consists of three different costs; (1) machine supplies (variable), (2) property taxes (fixed), and (3) plant maintenance (semivariable). July's overhead costs were $171,500 for machine supplies, $24,200 for property taxes, and $1,100,000 for plant maintenance. Required: Determine the machine supplies and property taxes for May. By using...
The data in the accompanying table is from a paper. Suppose that the data resulted from...
The data in the accompanying table is from a paper. Suppose that the data resulted from classifying each person in a random sample of 45 male students and each person in a random sample of 92 female students at a particular college according to their response to a question about whether they usually eat three meals a day or rarely eat three meals a day. Usually Eat 3 Meals a Day Rarely Eat 3 Meals a Day Male 25 20...
The following table is taken from the results of a longitudinal study of children from a...
The following table is taken from the results of a longitudinal study of children from a working class community. The study began when these children entered kindergarten and were four or five years old. The information reported below was collected when the respondents were 18. Using the information from the table below, answer the following questions: Started fight before the age of 15 Boys Girls Row Total No 163 184 347 (47.0%) (53.0%) (89.9%) Yes 32 7 39 (82.1%) (17.9%)...
The following financial statements are taken from the records of Jade Inc. a) Use horizontal analysis...
The following financial statements are taken from the records of Jade Inc. a) Use horizontal analysis techniques to compare the changes between 2018 and 2017 balance sheet items. Do not enter dollar signs or commas in the input boxes. Use the negative sign for negative values. Round all percentages to the nearest whole number (i.e. 21.61% should be entered as 22%). Jade Inc. Balance Sheet As at March 31 2018 2017 $ Change % Change Current Assets Cash $337,200 $328,500...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT