Question

In: Computer Science

Which of the following about CASE (Computer Aided Software Engineering) is incorrect?       a.   The information...

Which of the following about CASE (Computer Aided Software Engineering) is incorrect?

      a.   The information repository is the heart of an Integrated CASE tool.

      b.   Integrated CASE tools are stand-alone CASE tools connected together by the information repository.

      c.   Software reusability provided by Integrated CASE tools is attained through the use of the information repository.

      d.   CASE technology is mainly applied to eliminate the tasks of analysis and design for systems analysts.

      e.   None of the above

Solutions

Expert Solution

The correct answer is: a) The information repository is the heart of an Integrated CASE tool.

Because there are Two types of mechanisms have been used in CASE software to store design information:

  1. A dictionary, which contains names and descriptions of data items, processes, etc.
  2. A repository, which contains this dictionary information and a complete coded representation of plans, models and designs, with tools for cross-checking, correlation analysis and validation.

The heart of a well-designed I-CASE system is a repository, which is used as a knowledge base to store information about the organization, its structure, enterprise model, functions, procedures, data models etc. The meaning represented by diagrams and their detail windows is stored in the repository. The repository steadily accumulates information relating to the planning, analysis, design, construction and maintenance of systems. In other words: The repository is the heart of a CASE system.


Related Solutions

Interview someone whom you know or contact a company and learn about a computer–aided engineering software
Interview someone whom you know or contact a company and learn about a computer–aided engineering software tool that is related to mechanical engineering. Prepare a technical report of at least 250 words that describes what the software tool does and how it can help an engineer work more efficiently and accurately.    
Briefly describe different types of computer aided application in the field of transportation engineering. (minimum 8...
Briefly describe different types of computer aided application in the field of transportation engineering. (minimum 8 applications) Please respond clearly and briefly thanks
Cutting Edge Incorporated is a company engaged in the development of computer-aided design (CAD) software packages....
Cutting Edge Incorporated is a company engaged in the development of computer-aided design (CAD) software packages. The management of Cutting Edge wants to develop a project tracking system to accumulate and report data on current projects, employees and departments. They have given you the following attributes they store on an excel spreadsheet. A project can have several employees assigned to it. An employee belongs to only one department. Make any necessary assumptions and normalize to 3NF. (ProjectNumber, ProjectName, StartDate, ProjectStatus,...
What is the difference between Computer Science and Software Engineering?
What is the difference between Computer Science and Software Engineering?
Which of the following statements about the autonomic nervous system is INCORRECT?
Which of the following statements about the autonomic nervous system is INCORRECT?  A The preganglionic fibres in the parasympathetic division are usually long compared to the postganglionic fibres  B The sympathetic division mediates responses that allow the body to respond to 'flight and fright' situations  C The ganglia of the sympathetic division are usually close to the spinal cord  D The adrenal medulla is a sympathetic ganglion  E The parasympathetic nerves arise from the brain stem and the sacral region...
13. Which of the following statements is INCORRECT about trading on margin A. It is a...
13. Which of the following statements is INCORRECT about trading on margin A. It is a leveraged equity investment. B. Stocks purchased on margin are registered in street name. C. It increases payoff both on the upside and downside. D. In general, a limit-buy order may be placed to limit potential losses. 17. Consider the following short sale example: an investor borrows 100 shares of a stock from the broker, put down 50% as the initial margin, and sells the...
Which of the following statements about solubility is INCORRECT? A. It is a nonspontaneous process. B....
Which of the following statements about solubility is INCORRECT? A. It is a nonspontaneous process. B. A solution does not form if there is no change in internal energy during the dissolution process. C. It always involves a release of heat energy. D. An increase in disorder always results when a solution forms.
About utilization of fatty acids to generate ATP, which of the following is INCORRECT? a). It...
About utilization of fatty acids to generate ATP, which of the following is INCORRECT? a). It is first activated by ATP to form fatty acyl-CoA in the cytosol b). Fatty acyl-CoA needs carnitine acyltransferases to translocate to mitochondria c). Each round of beta-oxidation releases 1 acetyl CoA, 1 NADH and 1 NADPH d). The translocation process is repressed by high levels of insulin e). it is repressed by active fatty acid biosynthesis 16. Biosynthesis of fatty acids in mammalian hepatocytes...
Which of the following statements about quantum theory is incorrect? a. The energy and position of...
Which of the following statements about quantum theory is incorrect? a. The energy and position of an electron cannot be determined simultaneously. b. Lower energy orbitals are filled with electrons before higher energy orbitals. c. When filling orbitals of equal energy, two electrons will occupy the same orbital before filling a new orbital. d. No two electrons can have the same four quantum numbers. e. All of these are correct. The answer is C for Hund's rule but why A...
**SOFTWARE ENGINEERING** Think about the following, as they pertained to your project: the problems you encountered...
**SOFTWARE ENGINEERING** Think about the following, as they pertained to your project: the problems you encountered during the project the impact those problems had on development what was done to handle those problems what you would do in the future to avoid these problems or minimize their impacts Your analysis should include both technical and non-technical (e.g. , personnel, communication, etc. ) issues.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT