Question

In: Accounting

A company is manufacturing building bricks and fire bricks. Both production require two processes. Brick forming...

A company is manufacturing building bricks and fire bricks. Both production require two processes. Brick forming and Heat treatment. The requirements for the two bricks are:

Building Bricks Fire Bricks
Forming per 100 bricks 3 hours 2 hours
Heating treatment per 100 bricks 2 hours 5 hours
Total cost of the two departments in one months were:
Forming $ 21 200
Heat treatment $ 48 800
Units produced during the month was: 130 000 70 000

Require:

Prepare statement of manufacturing costs for the two types of bricks.

Solutions

Expert Solution

1.1
The statement of manufacturing costs for the two types of bricks is prepared as below.
Statement Showing Manufacturing Costs of Building Bricks
Process Time for 100 Units (Hours) [A] Rate Per Hour ($) [B] Cost Per 100 Units [A*B] Cost for 130,000 Units
Brick Forming 3 4 $12 15,600 (130,000/100*12)
Heat Treatment 2 8 $16 20,800 (130,000/100*16)
$28 $36,400
Statement Showing Manufacturing Costs of Fire Bricks
Process Time for 100 Units (Hours) [A] Rate Per Hour ($) [B] Cost Per 100 Units [A*B] Cost for 70,000 Units
Brick Forming 2 4 $8 5,600 (70,000/100*8)
Heat Treatment 5 8 $40 28,000 (70,000/100*40)
$28 $33,600
Notes:
The rate per hour calculation is determined as follows:
Brick Forming:
Total Building Bricks Hours = (Building Bricks Produced during the Month*Number of Forming Hours Per 100 Bricks)/100 = (130,000*3)/100 = 3,900 hours
Total Fire Brick Hours = (Fire Bricks Produced during the Month*Number of Forming Hours Per 100 Bricks)/100 = (70,000*2)/100 = 1,400 hours
Total Hours Needed for Brick Forming = Total Building Brick Hours + Total Fire Brick Hours = 3,900 + 1,400 = 5,300 hours
Cost Per Hour of Brick Forming Department = Total Brick Forming Costs/Total Hours Needed for Brick Forming = 21,200/5,300 = $4 per hour
Heat Treatment:
Total Building Bricks Hours = (Building Bricks Produced during the Month*Number of Heat Treatment Hours Per 100 Bricks)/100 = (130,000*2)/100 = 2,600 hours
Total Fire Brick Hours = (Fire Bricks Produced during the Month*Number of Heat Treatment Hours Per 100 Bricks)/100 = (70,000*5)/100 = 3,500 hours
Total Hours Needed for Heat Treatment = Total Building Brick Hours + Total Fire Brick Hours = 2,600 + 3,500 = 6,100 hours
Cost Per Hour of Heat Treatment Department = Total Heat Treatment Costs/Total Hours Needed for Heat Treatment = 48,800/6,100 = $8 per hour

Related Solutions

Sinclair Manufacturing and Boswell Brothers Inc. are both involved in the production of brick for the...
Sinclair Manufacturing and Boswell Brothers Inc. are both involved in the production of brick for the homebuilding industry. Their financial information is as follows: Sinclair Boswell Capital Structure Debt @ 10% $ 1,920,000 0 Common stock, $10 per share 1,280,000 $ 3,200,000 Total $ 3,200,000 $ 3,200,000 Common shares 128,000 320,000 Operating Plan: Sales (72,000 units at $15 each) $ 1,080,000 $ 1,080,000 Variable costs 864,000 432,000 Fixed costs 0 322,000 Earnings before interest and taxes (EBIT) $ 216,000 $...
Sinclair Manufacturing and Boswell Brothers Inc. are both involved in the production of brick for the...
Sinclair Manufacturing and Boswell Brothers Inc. are both involved in the production of brick for the homebuilding industry. Their financial information is as follows: Sinclair Boswell Capital Structure Debt @ 11% $ 1,080,000 0 Common stock, $10 per share 720,000 $ 1,800,000 Total $ 1,800,000 $ 1,800,000 Common shares 72,000 180,000 Operating Plan: Sales (58,000 units at $20 each) $ 1,160,000 $ 1,160,000 Variable costs 928,000 580,000 Fixed costs 0 308,000 Earnings before interest and taxes (EBIT) $ 232,000 $...
Sinclair Manufacturing and Boswell Brothers Inc. are both involved in the production of brick for the...
Sinclair Manufacturing and Boswell Brothers Inc. are both involved in the production of brick for the homebuilding industry. Their financial information is as follows: Sinclair Boswell Capital Structure Debt @ 10% $ 1,740,000 0 Common stock, $10 per share 1,160,000 $ 2,900,000 Total $ 2,900,000 $ 2,900,000 Common shares 116,000 290,000 Operating Plan: Sales (69,000 units at $15 each) $ 1,035,000 $ 1,035,000 Variable costs 828,000 414,000 Fixed costs 0 319,000 Earnings before interest and taxes (EBIT) $ 207,000 $...
Sinclair Manufacturing and Boswell Brothers Inc. are both involved in the production of brick for the...
Sinclair Manufacturing and Boswell Brothers Inc. are both involved in the production of brick for the homebuilding industry. Their financial information is as follows: Sinclair BoswellCapital Structure   Debt @ 10%$2,100,000  0Common stock, $10 per share 1,400,000 $3,500,000Total$3,500,000 $3,500,000Common shares 140,000  350,000      Operating Plan:     Sales (75,000 units at $15 each)$1,125,000 $1,125,000Variable costs 900,000  450,000Fixed costs 0  325,000Earnings before interest and taxes (EBIT)$225,000 $350,000 The variable costs for Sinclair are $12 per unit compared to $6 per unit for Boswell. a. If you combine Sinclair’s capital structure with Boswell’s...
Sinclair Manufacturing and Boswell Brothers Inc. are both involved in the production of brick for the...
Sinclair Manufacturing and Boswell Brothers Inc. are both involved in the production of brick for the homebuilding industry. Their financial information is as follows: Sinclair Boswell Capital Structure Debt @ 12% $ 1,320,000 0 Common stock, $10 per share 880,000 $ 2,200,000 Total $ 2,200,000 $ 2,200,000 Common shares 88,000 220,000 Operating Plan: Sales (62,000 units at $25 each) $ 1,550,000 $ 1,550,000 Variable costs 1,116,000 744,000 Fixed costs 0 312,000 Earnings before interest and taxes (EBIT) $ 434,000 $...
however Henry is building a fireplace in his home, the fireplace will require 2500 bricks. a)...
however Henry is building a fireplace in his home, the fireplace will require 2500 bricks. a) if the cost of chimney brick in 2017 $2.10. calculate the material cost of Henry's project in 2020 . the chimney brick index (CBI) was 442 in 2017 and is expected to be 651 in 2020 b) estimate the material cost of similar fireplace to be built in the year 2023 what assumption did you make?
Quality Brick Company produces bricks in two processing departments—Molding and Firing. Information relating to the company’s...
Quality Brick Company produces bricks in two processing departments—Molding and Firing. Information relating to the company’s operations in March follows: a. Raw materials were issued for use in production: Molding Department, $29,400; and Firing Department, $4,500. b. Direct labor costs were incurred: Molding Department, $18,900; and Firing Department, $5,100. c. Manufacturing overhead was applied: Molding Department, $22,200; and Firing Department, $36,800. d. Unfired, molded bricks were transferred from the Molding Department to the Firing Department. According to the company's process...
Quality Brick Company produces bricks in two processing departments—Molding and Firing. Information relating to the company’s...
Quality Brick Company produces bricks in two processing departments—Molding and Firing. Information relating to the company’s operations in March follows: Raw materials used in production: Molding Department, $26,900; and Firing Department, $4,000. Direct labor costs incurred: Molding Department, $17,000; and Firing Department, $4,500. Manufacturing overhead was applied: Molding Department, $22,200; and Firing Department, $36,300. Unfired, molded bricks were transferred from the Molding Department to the Firing Department. According to the company’s process costing system, the cost of the unfired, molded...
Quality Brick Company produces bricks in two processing departments—Molding and Firing. Information relating to the company’s...
Quality Brick Company produces bricks in two processing departments—Molding and Firing. Information relating to the company’s operations in March follows: a. Raw materials were issued for use in production: Molding Department, $23,000; and Firing Department, $8,000. b. Direct labor costs were incurred: Molding Department, $12,000; and Firing Department, $7,000. c. Manufacturing overhead was applied: Molding Department, $25,000; and Firing Department, $37,000. d. Unfired, molded bricks were transferred from the Molding Department to the Firing Department. According to the company's process...
Quality Brick Company produces bricks in two processing departments—Molding and Firing. Information relating to the company’s...
Quality Brick Company produces bricks in two processing departments—Molding and Firing. Information relating to the company’s operations in March follows: Raw materials used in production: Molding Department, $26,100; and Firing Department, $4,300. Direct labor costs incurred: Molding Department, $19,900; and Firing Department, $4,700. Manufacturing overhead was applied: Molding Department, $23,100; and Firing Department, $36,200. Unfired, molded bricks were transferred from the Molding Department to the Firing Department. According to the company’s process costing system, the cost of the unfired, molded...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT