Question

In: Accounting

A medium-sized industrial grade compressor can be purchased for $35,000. Annual O&M costs are expected to...

A medium-sized industrial grade compressor can be purchased for $35,000. Annual O&M costs are expected to increase $1,300 every year, with a 1st year O&M cost of $2,000. (MARR =16%, and planning horizon is 10 years)

• The compressor salvage value for a given period t, is calculated based on the following equation: Salvage value (t) = $30,000– $3,000 * t

a) Find the Optimum Replacement Interval for this Equipment

b) Find the Optimum Replacement Interval for this Equipment if the O&M costs is increased to $1,600/yr. What is your conclusion?

c) Find the Optimum Replacement Interval for this Equipment if the initial cost is reduced to $32,000. What is your conclusion?

Solutions

Expert Solution


Related Solutions

A medium-sized industrial grade compressor can be purchased for $35,000. Annual O&M costs are expected to...
A medium-sized industrial grade compressor can be purchased for $35,000. Annual O&M costs are expected to increase $1,300 every year, with a 1st year O&M cost of $2,000. (MARR = AAA+15%, and planning horizon is 10 years) • The compressor salvage value for a given period t, is calculated based on the following equation: Salvage value (t) = $30,000– $3,000 * t a) Find the Optimum Replacement Interval for this Equipment b) Find the Optimum Replacement Interval for this Equipment...
Please use excel and demonstrate the formulae used. A medium-sized industrial grade compressor can be purchased...
Please use excel and demonstrate the formulae used. A medium-sized industrial grade compressor can be purchased for $35,000. Annual O&M costs are expected to increase $1,300 every year, with a 1st year O&M cost of $2,000. (MARR = 16%, and planning horizon is 10 years) The compressor salvage value for a given period t, is calculated based on the following equation: Salvage value (t) = $30,000– $3,000 * t a) Find the Optimum Replacement Interval for this Equipment b) Find...
An industrial robot is purchased and installed for $85,000. Annual operating and maintenance costs are expected...
An industrial robot is purchased and installed for $85,000. Annual operating and maintenance costs are expected to be $1,500, with software upgrades increasing by $500 per year from $5,000 in year 1. If the robot has an eight-year life, what is the present value of the costs of owning it? Assume that the robot has no salvage value and assume the annual interest rate is 10%.
Assume an industrial building can be purchased for $2,500,000 today. The investment is expected to yield...
Assume an industrial building can be purchased for $2,500,000 today. The investment is expected to yield cash flows of $300,000 a year for the next five years (the cash flows will be received at the end of the year). The building is expected to sell for $2,750,000 at the end of the fifth year. Calculate the internal rate of return (IRR) for this transaction. show work please
Alternative R has a first cost of $88,000, annual M&O costs of $62,000, and a $20,000...
Alternative R has a first cost of $88,000, annual M&O costs of $62,000, and a $20,000 salvage value after 5 years. Alternative S has a first cost of $175,000 and a $58,000 salvage value after 5 years, but its annual M&O costs are not known. Determine the M&O costs for alternative S that would yield a required incremental rate of return of 23%. The M&O cost for alternative S is $
Economics Question. Please answer ASAP! Will provide thumbs up! Car's annual operating and maintenance (O&M) costs...
Economics Question. Please answer ASAP! Will provide thumbs up! Car's annual operating and maintenance (O&M) costs are given by the following schedule: Year Value 1 50 2 100 3 100 4 170 5 240 If MARR = 10%, and it is known that the value of O&M costs in the first year is the base annuity, define the value of parameter G in the equivalent arithmetic gradient series. (Note: Don't use the $ sign in your answer and keep 2...
Tuition costs at various colleges vary from $10,000 to $35,000 annually. These tuitions are expected to...
Tuition costs at various colleges vary from $10,000 to $35,000 annually. These tuitions are expected to increase over time. If the annual rate of increase is 4 percent, what will be the new range in tuition costs in twelve years? Use Appendix A to answer the questions. Round your answers to the nearest dollar. The range at 4 percent is $ - $ . If the rate doubles from 4 to 8 percent, what will be the range in tuition...
A property was purchased by an investor. The property is expected to produce $120,000 of annual...
A property was purchased by an investor. The property is expected to produce $120,000 of annual net operating income in year 1; increasing $10,000 every year thereafter. The owner intends to sell the property at the end of year 5. a. Assuming the bank requires a 1.2 debt coverage service ratio based on the expected first year NOI, what is the maximum monthly mortgage payment? b. Assuming the mortgage has a 6% annual interest rate, amortizes over 30 years, with...
Steering Company estimated the following annual hours and costs: Expected annual direct labor hours 40,000 Expected...
Steering Company estimated the following annual hours and costs: Expected annual direct labor hours 40,000 Expected annual direct labor cost $1,400,000 Expected machine hours 40,000 Expected material cost for the year $1,792,000 Expected manufacturing overhead $2,240,000 (a) Calculate predetermined overhead allocation rates using each of the four possible allocation bases provided. (Round direct labor cost and direct material cost answers to 2 decimal places, e.g. 15.25 and all other answers to 0 decimal places, e.g. 5,275.) Direct labor hours Direct...
Steering Company estimated the following annual hours and costs: Expected annual direct labor hours 40,000 Expected...
Steering Company estimated the following annual hours and costs: Expected annual direct labor hours 40,000 Expected annual direct labor cost $1,400,000 Expected machine hours 40,000 Expected material cost for the year $1,792,000 Expected manufacturing overhead $2,240,000 Direct labor hours Direct labor cost Machine hours Direct material cost Predetermined overhead allocation $56 $1.60 $56 $1.25 Determine the cost of the following job (number 253) using each of the four overhead allocation rates: (Round answers to 0 decimal places, e.g. 125.) Job...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT