Question

In: Economics

As an engineer, you are asked to choose between a PV panel system and a wind...

As an engineer, you are asked to choose between a PV panel system and a wind turbine for your site. PV panel system costs 1,000,000 USD to implement while the cost of the wind turbine system is 600,000 USD. PV panels have a lifetime of 20 years, and wind turbine lifetime is ten years. The annual operation and maintenance cost of PV is 50,000 USD, and wind turbines are 30,000 USD. From the annual electricity generation, PV panels are making 200,000 USD every year, while this amount is 150,000 USD for the wind turbine. The salvage value of the PV is 75,000 USD, and the salvage value of the wind turbine is 50,000 USD. The interest rate is 12%.

a) Compare the annual worth of PV and wind turbines.

b) Compare the payback period of PV and wind turbines.

c) Compare the Benefit/Cost ratio of PV and wind turbines.

d) Select one option (PV or turbine) for your site. Include an explanation of why you select that option.

Solutions

Expert Solution

The computation is done as under:


Related Solutions

As an engineer, you are asked to choose between a PV panel system and a wind...
As an engineer, you are asked to choose between a PV panel system and a wind turbine for your site. PV panel system costs 900,000 USD to implement while the cost of the wind turbine system is 500,000 USD. PV panels have a lifetime of 25 years, and wind turbine lifetime is 15 years. The annual operation and maintenance cost of PV is 30,000 USD, and wind turbines are 50,000 USD. From the annual electricity generation, PV panels are making...
A solar Photovoltaic (PV) system consists of a PV panel, a charger controller, a battery, and an inverter.
A solar Photovoltaic (PV) system consists of a PV panel, a charger controller, a battery, and an inverter. The manufacturer of the PV system guarantees 20 years of lifetime of the entire PV system with reliability of 0.90 at the end of 20 years. The failure rate of its major components is given in Table 1. To achieve the overall system reliability goal, we can add redundant units for each subsystem (see Figure 2). Note that System A is the...
PV-panel panel normal vector has following azimuth and elevation angle Azimuth α Elevation ε Panel normal...
PV-panel panel normal vector has following azimuth and elevation angle Azimuth α Elevation ε Panel normal vector 180o 45o Sun azimuth and elevation angle are given in different time below Hour Azimuth α Elevation ε 5:00 54.09o 3.32o 8:00 92.43o 23.80o 13:00 178.69o 48.53o 17:00 252.09o 31.88o 21:00 304.39o 4.18o At what time the PV-panel power output is highest? Select one: a. 21:00 b. 17:00 c. 13:00 d. 5:00 e. 8:00
In the problem, you are on a game show, being asked to choose between three doors....
In the problem, you are on a game show, being asked to choose between three doors. Behind each door, there is either a car or a goat. You choose a door. The host, Monty Hall, picks one of the other doors, which he knows has a goat behind it, and opens it, showing you the goat. (You know, by the rules of the game, that Monty will always reveal a goat.) Monty then asks whether you would like to switch...
4. Imagine that you are asked to choose between two businesses (electric companies) that will supply...
4. Imagine that you are asked to choose between two businesses (electric companies) that will supply electricity to your home. One of these electric companies burns coal in a facility built in 1963. It has not been retrofitted with pollution-control equipment, but it offers electricity at a relatively low price. The other firm has been retrofitted with pollution-control equipment and generates a large percentage of its electricity from dams, windmills, and solar panels but its price for electricity is almost...
Calculate the angle of incidence for the PV panel installed in Brampton, at 3:00 p.m. July...
Calculate the angle of incidence for the PV panel installed in Brampton, at 3:00 p.m. July 10, facing due south with a tilt angle same as the latitude. If the solar insolation at this point is 1000 W/m2 ,calculate the insolation collected by the panel.
An energy company wants to choose between two regions in a state to install​ energy-producing wind...
An energy company wants to choose between two regions in a state to install​ energy-producing wind turbines. A researcher claims that the wind speed in Region A is less than the wind speed in Region B. To test the​ regions, the average wind speed is calculated for 90 days in each region. The mean wind speed in Region A is 13.8 miles per hour. Assume the population standard deviation is 2.8 miles per hour. The mean wind speed in Region...
An energy company wants to choose between two regions in a state to install​ energy-producing wind...
An energy company wants to choose between two regions in a state to install​ energy-producing wind turbines. A researcher claims that the wind speed in Region A is less than the wind speed in Region B. To test the​ regions, the average wind speed is calculated for 60 days in each region. The mean wind speed in Region A is 13.7 miles per hour. Assume the population standard deviation is 2.7 miles per hour. The mean wind speed in Region...
For a coastal area, you are asked as the responsible sanitary engineer to design a waste...
For a coastal area, you are asked as the responsible sanitary engineer to design a waste treatment plant. Briefly select the following and give a sound engineering justification: Effluent treatment train, Sludge treatment train, Effluent reuse/recycle/reclamation or ultimate disposal, Treated sludge usage or final disposal, Location of your suggested wastewater treatment plant, and Methods to be used for unit engineering design please solve this question with a clear hand writing
As a geotechnical engineer, you have been asked to conduct experiments that are required to be...
As a geotechnical engineer, you have been asked to conduct experiments that are required to be used in strength and static calculations. If the ground class is not determined and the budget is considered to be unlimited, explain what experiments you choose and why.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT