Question

In: Electrical Engineering

How do I solve short term load forecasting using Multiple Linear Regression? Can anyone provide me...

How do I solve short term load forecasting using Multiple Linear Regression? Can anyone provide me a step by step guide and solution? (Please provide a sample data)

Solutions

Expert Solution

Electric load forecasting is becoming most important constraint due to severe load demand.

Short term forecast is used to establish hourly schedule for generation resources.

This forcasting can be done in two ways

1.peak load models- in this type daily load is monitors and in this type of load time is mainly not the constraint.

2.load shape models-these are monitored in specific interval of time which involves sampling after every hour.


Related Solutions

How do I solve short-term load forecasting using Multiple Linear Regression? Can anyone provide me a...
How do I solve short-term load forecasting using Multiple Linear Regression? Can anyone provide me a step by step solution with a sample data?
How do you obtain the beta coefficients in multiple linear regression in short term load forecasting?...
How do you obtain the beta coefficients in multiple linear regression in short term load forecasting? Can anyone provide me a guide to obtain this? The internet is telling me to obtain estimates but I do not get it
How do I make a skewness and kurtosis graph in Excel? Can anyone provide me a...
How do I make a skewness and kurtosis graph in Excel? Can anyone provide me a step?
Multiple Linear Regression - Omitted Variable bias. Can someone provide me with an intuitive explanation of...
Multiple Linear Regression - Omitted Variable bias. Can someone provide me with an intuitive explanation of ommitted variable bias.
Can anyone explain to me how I solve this, I need to prepare a journal entry...
Can anyone explain to me how I solve this, I need to prepare a journal entry for the given problem: on jan 1 a corporation issued $325,000, 5.5%, 9 year bonds when the market rate was 6%. Interest is to be paid annually on each Jan 1
I am having trouble figuring out how to To-Do list using java. Can anyone guide me...
I am having trouble figuring out how to To-Do list using java. Can anyone guide me through the steps for achieving this?
What will be the advantages of short term load forecasting? Why is it essential to determine...
What will be the advantages of short term load forecasting? Why is it essential to determine the week ahead load demand?
Can you give me a reason why to use multiple linear regression and curve fitting in...
Can you give me a reason why to use multiple linear regression and curve fitting in short term load forecasting?
I will rate life saver to anyone who can answer these short questions for me! 1....
I will rate life saver to anyone who can answer these short questions for me! 1. Provide a molecular/microscopic interpretation of heat flow or heating, and work. 2. Explain why U of an ideal gas is only dependent on T, and independent on V and P, and show that CP - CV = nR for an ideal gas. 3. When 229 J of energy is supplied as heat at constant pressure to 3.00 mol CO2(g), the temperature of the sample...
Which of the following is a common Cause-and-Effect Forecasting Model?             Multiple Regression             Linear Trend...
Which of the following is a common Cause-and-Effect Forecasting Model?             Multiple Regression             Linear Trend Forecast             Moving Average Forecast             Mean Absolute Deviation The impact of poor communication and inaccurate forecasts resonates along the supply chain and results in the…?             Carbonaro effect             Delphi effect             Bullwhip effect             Doppler effect Which of the following is not a New Product forecasting approach?             Time series forecast             Analog/looks like forecast             Judgement forecast with expert opinion            ...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT