Flexible Budget

In an attempt to improve budgeting, the controller for Meliore, Inc., has developed a flexible budget for overhead costs. Meliore, Inc., makes two types of products, the standard model and the deluxe model. Meliore expects to produce 300,000 units of the standard model and 120,000 units of the deluxe model during the coming year. The standard model requires 0.05 direct labor hour per unit, and the deluxe model requires 0.08. The controller has developed the following cost formulas for each of the four overhead items:

Cost Formula          
Maintenance $34,600 + $1.25 DLH
Power $0.50 DLH
Indirect labor $68,200 + $2.30 DLH
Rent $31,700

At the end of the year, Meliore, Inc., actually produced 310,000 units of the standard model and 115,000 of the deluxe model. The actual overhead costs incurred were:

Maintenance $ 64,200
Power 12,410
Indirect labor 129,160
Rent 31,700

Required:

Prepare a performance report for the period. If there is no variance, enter "0" for the amount and select "NA" in the last column.

Meliore, Inc.
Performance Report
For the Year Ended December 31
Actual Budget Variance Fav/Unfav/NA
DLH for units produced
Production costs:
Maintenance $ $ $
Power
Indirect labor
Rent
Total $ $ $   

Solutions

Expert Solution

If it is helpful, please rate the answer and if any doubt arises let me know

Meliore Inc.
Performance Report
For the year ended December 31
Actual results Budget Variance
(i) (ii)
DLH for unit produced                                                         24,700        24,700
Production costs:
Maintenance $                                                     64,200        65,475 $    1,275 F
Power $                                                     12,410        12,350 $          60 U
Indirect labor $                                                 1,29,160     1,25,010 $    4,150 U
Rent $                                                     31,700        31,700 $           0 NA
Total $                                                 2,37,470     2,34,535 $    2,935 U
Workings: Budget
DLH for unit produced [(310000 X 0.05) + (115000 X 0.08)]        24,700
Production costs:
Maintenance [$34600 + ($1.25 X q)]        65,475
Power ($0.50 X q)        12,350
Indirect labor [$68200 + ($2.30 X q)]     1,25,010
Rent $                                                     31,700        31,700
Total     2,34,535

Related Solutions

Flexible Budget In an attempt to improve budgeting, the controller for Meliore, Inc., has developed a...
Flexible Budget In an attempt to improve budgeting, the controller for Meliore, Inc., has developed a flexible budget for overhead costs. Meliore, Inc., makes two types of products, the standard model and the deluxe model. Meliore expects to produce 400,000 units of the standard model and 140,000 units of the deluxe model during the coming year. The standard model requires 0.10 direct labor hour per unit, and the deluxe model requires 0.16. The controller has developed the following cost formulas...
Flexible Budget In an attempt to improve budgeting, the controller for Meliore, Inc., has developed a...
Flexible Budget In an attempt to improve budgeting, the controller for Meliore, Inc., has developed a flexible budget for overhead costs. Meliore, Inc., makes two types of products, the standard model and the deluxe model. Meliore expects to produce 400,000 units of the standard model and 140,000 units of the deluxe model during the coming year. The standard model requires 0.10 direct labor hour per unit, and the deluxe model requires 0.16. The controller has developed the following cost formulas...
Flexible Budget In an attempt to improve budgeting, the controller for Meliore, Inc., has developed a...
Flexible Budget In an attempt to improve budgeting, the controller for Meliore, Inc., has developed a flexible budget for overhead costs. Meliore, Inc., makes two types of products, the standard model and the deluxe model. Meliore expects to produce 300,000 units of the standard model and 140,000 units of the deluxe model during the coming year. The standard model requires 0.05 direct labor hour per unit, and the deluxe model requires 0.08. The controller has developed the following cost formulas...
Flexible Budget In an attempt to improve budgeting, the controller for Meliore, Inc., has developed a...
Flexible Budget In an attempt to improve budgeting, the controller for Meliore, Inc., has developed a flexible budget for overhead costs. Meliore, Inc., makes two types of products, the standard model and the deluxe model. Meliore expects to produce 400,000 units of the standard model and 110,000 units of the deluxe model during the coming year. The standard model requires 0.10 direct labor hour per unit, and the deluxe model requires 0.16. The controller has developed the following cost formulas...
Flexible Budget In an attempt to improve budgeting, the controller for Meliore, Inc., has developed a...
Flexible Budget In an attempt to improve budgeting, the controller for Meliore, Inc., has developed a flexible budget for overhead costs. Meliore, Inc., makes two types of products, the standard model and the deluxe model. Meliore expects to produce 300,000 units of the standard model and 130,000 units of the deluxe model during the coming year. The standard model requires 0.10 direct labor hour per unit, and the deluxe model requires 0.16. The controller has developed the following cost formulas...
Flexible Budget In an attempt to improve budgeting, the controller for Meliore, Inc., has developed a...
Flexible Budget In an attempt to improve budgeting, the controller for Meliore, Inc., has developed a flexible budget for overhead costs. Meliore, Inc., makes two types of products, the standard model and the deluxe model. Meliore expects to produce 300,000 units of the standard model and 120,000 units of the deluxe model during the coming year. The standard model requires 0.05 direct labor hour per unit, and the deluxe model requires 0.08. The controller has developed the following cost formulas...
Flexible Budget In an attempt to improve budgeting, the controller for Meliore, Inc., has developed a...
Flexible Budget In an attempt to improve budgeting, the controller for Meliore, Inc., has developed a flexible budget for overhead costs. Meliore, Inc., makes two types of products, the standard model and the deluxe model. Meliore expects to produce 300,000 units of the standard model and 120,000 units of the deluxe model during the coming year. The standard model requires 0.05 direct labor hour per unit, and the deluxe model requires 0.08. The controller has developed the following cost formulas...
Flexible Budget In an attempt to improve budgeting, the controller for Meliore, Inc., has developed a...
Flexible Budget In an attempt to improve budgeting, the controller for Meliore, Inc., has developed a flexible budget for overhead costs. Meliore, Inc., makes two types of products, the standard model and the deluxe model. Meliore expects to produce 400,000 units of the standard model and 120,000 units of the deluxe model during the coming year. The standard model requires 0.05 direct labor hour per unit, and the deluxe model requires 0.08. The controller has developed the following cost formulas...
Activity Flexible Budgeting, Performance Report, Volume Variance Novo, Inc., wants to develop an activity flexible budget...
Activity Flexible Budgeting, Performance Report, Volume Variance Novo, Inc., wants to develop an activity flexible budget for the activity of moving materials. Novo uses eight forklifts to move materials from receiving to stores. The forklifts are also used to move materials from stores to the production area. The forklifts are obtained through an operating lease that costs $18,000 per year per forklift. Novo employs 25 forklift operators who receive an average salary of $50,000 per year, including benefits. Each move...
Activity Flexible Budgeting, Performance Report, Volume Variance Novo, Inc., wants to develop an activity flexible budget...
Activity Flexible Budgeting, Performance Report, Volume Variance Novo, Inc., wants to develop an activity flexible budget for the activity of moving materials. Novo uses eight forklifts to move materials from receiving to stores. The forklifts are also used to move materials from stores to the production area. The forklifts are obtained through an operating lease that costs $18,000 per year per forklift. Novo employs 25 forklift operators who receive an average salary of $50,000 per year, including benefits. Each move...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT