In: Accounting
Q: Philips Company manufactures a variety of high- and low-volume products, including product 456, in its Westchester Plant. The following information pertains to the most recent year:
| 
 Total for product 456  | 
 Total for Westchester  | 
|
| 
 Unit-level overhead  | 
 $200,000  | 
|
| 
 Batch-level overhead  | 
 300,000  | 
|
| 
 Product-level overhead  | 
 500,000  | 
|
| 
 Plant-level overhead  | 
 400,000  | 
|
| 
 Total overhead  | 
 $1,400,000  | 
|
| 
 Units produced  | 
 100  | 
 5,000  | 
| 
 Direct labor hours  | 
 200  | 
 20,000  | 
| 
 Machine hours  | 
 90  | 
 10,000  | 
| 
 Setups  | 
 6  | 
 120  | 
| 
 Setup hours  | 
 30  | 
 500  | 
| 
 Design changes  | 
 4  | 
 40  | 
| 
 Design hours  | 
 280  | 
 4,000  | 
REQUIRED:
(1) If the Westchester Plant accumulates all overhead in a single cost pool and allocates it on the basis of machine hours, how much overhead cost will be allocated to a unit of Product 456?
(2) If the Westchester Plant uses ABC
with setups as the driver for all batch-level overhead, design
hours as the driver for all product-level overhead, and machine
hours as the driver for all unit- and plant-level overhead, how
much overhead cost will be allocated to a unit of Product
456?
1. Overhead cost allocated to a unit of Product 456 = Overhead rate * machine hours used
= 140 per machine hour * 90 machine hours
= $ 12,600
Overhead rate = Total overhead cost / Total Machine hours
= 1,400,000 / 10,000
= $ 140 per machine hour
2. Overhead cost allocated to a unit of Product 456 will be $ 55,400
| Activity Rate | Activity by Product 456 | Cost allocated | |
| Unit-level overhead | 20 per Machine hour | 90 | $ 1,800 | 
| Batch-level overhead | 2500 per setup | 6 | $ 15,000 | 
| Product-level overhead | 125 per Design hr | 280 | $ 35,000 | 
| Plant-level overhead | 40 per Machine hour | 90 | $ 3,600 | 
| $ 55,400 | 
| Activity | Activity Driver | 
Activity Overhead (A)  | 
Cost Driver quantity (B) | Activity rate for each pool (A/B) | 
| Unit-level overhead | Machine hours | $ 200,000 | 10,000.00 | 20 per Machine hour | 
| Batch-level overhead | Setups | $ 300,000 | 120.00 | 2500 per setup | 
| Product-level overhead | Design hours | $ 500,000 | 4,000.00 | 125 per Design hr | 
| Plant-level overhead | Machine hours | $ 400,000 | 10,000.00 | 40 per Machine hour |