Question

In: Statistics and Probability

It takes Fena Tailoring 3 hr of cutting and 6 hr of sewing to make a...

It takes Fena Tailoring 3 hr of cutting and 6 hr of sewing to make a tiered silk organza bridal dress. It takes 6 hr of cutting and 3 hr of sewing to make a lace sheath bridal dress. The shop has at most 30 hr per week available for cutting and at most 33 hr per week for sewing. The profit is ​$334 on an organza dress and ​$190 on a lace dress. How many of each kind of bridal dress should be made each week in order to maximize​ profit? What is the maximum​ profit?

Solutions

Expert Solution

Solution-

Let x and y represents the number of organza dresses and ​the lace dresses that should be made per week to maximize the profit.

Since the profit is ​$334 on an organza dress and ​$190 on a lace dress.

So, Profit function in dollars is

Z(x, y) = 334x + 190y .....(1)

Now,

Since it takes Fena Tailoring 3 hr of cutting to make a tiered silk organza bridal dress and 6 hr to make a lace sheath bridal dress.The shop has at most 30 hr per week available for cutting.

So, 3x + 6y ≤ 30

Dividing both sides by 3 to get

x + 2y ≤ 10 ....(2)

Similarly it takes Fena Tailoring 6 hr of sewing to make a tiered silk organza bridal dress and 3 hr of sewing to make a lace sheath bridal dress. shop has at most 33 hr per week for sewing.

So, 6x + 3y ≤ 33

Dividing both sides by 3 to get

2x + y ≤ 11 .....(2)

Now, we have two inequalities.Let us consider these inequalities as equation to find the corner points and solving them graphically.

Equation corrosponding to inequality (2) is

x + 2y =10 .....(4)

At x =0 , y =5 and

At y =0, x = 10

Equation corrosponding to inequality (3) is

2x + y = 11 .....(5)

At x =0, y =11 and

At y =0 , x = 5.5

Now, substracting equation (5) from 2 times if equation (4) to get

2(x+2y) -(2x +y) = 2(10) - 11

2x +4y -2x -y = 20 -11

3y =9

Or y =9/3 = 3 .....(6)

Putting the is value in equation (4) to get

x + 2(3) = 10

Or x +6 =10

Or x =10 -6 = 4 ....(7)

So, from equation (6) and (7) the point (4, 3) is the solution of the two equations.

Now, using the above information, the graphical representation of the solution of inequality (2) and (3) is shown below-

From the graph we can observe that the corner points of the solution are (0, 0), (0, 5), (5.5, 0) and (4, 3).

Now, Since the profit function is (from equation 1)

Z(x,y) = 334x + 190y

Let us check , which corner points will result in maximum profit in dollars.

Z(0,0) = 334(0) +190(0) =0

Z(5,0) = 334(5) + 190(0) = 1670 + 0 = $ 1670

Z(0, 5.5) =334(0) + 190(5.5) = 0 + 1045 =$1045

Z(4, 3)= 334(4) +190(3)= 1336 +570 = $ 1906

So, x =4 and y =3 will result in maximum profit.

Hence,

Number of dress of each kind of bridal dress that should be made each week in order to maximize​ profit are

Organza dress = x = 4

Lace dress = y = 3

And

The maximum​ profit is

Z(4,3) = $1906


Related Solutions

Product Cutting Sewing Material Skirt 1 1 1 Dress 4 3 1 Sport Coat 6 6...
Product Cutting Sewing Material Skirt 1 1 1 Dress 4 3 1 Sport Coat 6 6 4 The? Trim-Look Company makes several lines of? skirts, dresses, and sport coats.? Recently, a consultant suggested that the company reevaluate its South Islander line and allocate its resources to products that would maximize contribution to profits and to overhead. Each product requires the same polyester fabric and must pass through the cutting and sewing departments. The following data were collected for the study....
A batch of 400 sewing machines contains 6 that are defective. (a) Three sewing machines are...
A batch of 400 sewing machines contains 6 that are defective. (a) Three sewing machines are selected at random, without replacement. What is the probability that the second sewing machine is defective, but the first and third are acceptable? (b) Three sewing machines are selected at random, without replacement. What is the probability that the third sewing machine is defective, given that the first two are acceptable? (c) Sewing machines are selected, this time with replacement. What is the probability...
Anders Company has two producing departments - Cutting and Sewing - and two support departments -...
Anders Company has two producing departments - Cutting and Sewing - and two support departments - Maintenance and General Factory (GF). Anders provided the following information on the four departments: Maintenance General Factory Cutting Sewing Direct overhead costs $10,000 $270,000 $56,400 $75,000 Machine hours 459 2,000 9,000 9,000 Square footage 2,500 3,418 5,000 8,500 The company does not break overhead into fixed and variable components. The bases for allocation are maintenance - machine hours; general factory - square feet. 1....
Anders Company has two producing departments - Cutting and Sewing - and two support departments -...
Anders Company has two producing departments - Cutting and Sewing - and two support departments - Maintenance and General Factory (GF). Anders provided the following information on the four departments: Maintenance General Factory Cutting Sewing Direct overhead costs $10,000 $270,000 $56,400 $75,000 Machine hours 459 2,000 9,000 9,000 Square footage 2,500 3,418 5,000 8,500 The company does not break overhead into fixed and variable components. The bases for allocation are maintenance - machine hours; general factory - square feet. 1....
The company has two departments – Cutting and Sewing. The company uses the multiple production department...
The company has two departments – Cutting and Sewing. The company uses the multiple production department factory overhead rate method using direct labor hours. The budgeted factory overhead is $900,000 for the Cutting Department and $500,000 for the Sewing Department. The company plans to make 100,000 shirts and 50,000 pairs of pants. It takes 1 hour to cut and one hour to sew a shirt. It takes 1 hour to cut and 2 hours to sew a pair of pants....
Challenge 3 – Make 2D Array Write a function that takes 3 parameters and makes use...
Challenge 3 – Make 2D Array Write a function that takes 3 parameters and makes use of your prior two functions to create a 2D array filled with a default parameter. var twoD = Init2D(<width>, <height>, <fill val>); Challenge 4 – Random Integer in Range Write a function to return a random integer between a minimum value and maximum value. var ival = IntRandomRange(<min>, <max>); Challenge 5 – Random Int 2D Array Use your prior functions to provide a function...
Christmas Express makes wreaths in batch sizes of 15. The cutting & assembly process takes 2...
Christmas Express makes wreaths in batch sizes of 15. The cutting & assembly process takes 2 minutes per wreath and the decorating process time is 15 minutes per wreath. It takes 5 minutes to move the wreaths from the cutting & assembly process to the decorating process. Compute the value-added, non-value-added, and the total lead time of the wreath process. Value-added lead time: Non-value-added lead time: Move time Within batch wait time Total lead time Compute the value-added ratio. Round...
Ship A is traveling north at 6 mi/hr, and ship B is traveling west at 12 mi/hr
  Ship A is traveling north at 6 mi/hr, and ship B is traveling west at 12 mi/hr. When ship A was dead ahead of ship B, it was 6 mi away. Use MuPAD to determine how close the ships come to each other.    
what is the HR path a 9-10 solar mass star takes when it dies
what is the HR path a 9-10 solar mass star takes when it dies
Assume it takes Leonardo 10 minutes to make a donut and 30 minutes to make a...
Assume it takes Leonardo 10 minutes to make a donut and 30 minutes to make a carrot cake, and it takes Emilia 12 minutes to make a donut and 24 minutes to make a carrot cake. What is the opportunity cost to Leonardo of making a donut? a. 6 carrot cakes b. 3 carrot cakes c. 1/3 of a carrot cake d. 10 carrot cakes True or False. If someone has an absolute advantage at milking goats, they will necessarily...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT