In: Statistics and Probability
Otacnu Manufacturing Inc. builds electric insulators. If the insulators break when in use, a short circuit is likely to occur. To test the strength of the insulators, destructive testing in high-powered labs is carried out to determine how much force is required to break the insulators. The force is measured by observing how many pounds must be applied to the insulator before it breaks. The force measurements, collected from a sample of 30 insulators and stored in the Force are: Construct a frequency distribution and a percentage distribution.
1,870 |
1,728 |
1,656 |
1,610 |
1,634 |
1,784 |
1,522 |
1,696 |
1,592 |
1,662 |
1,866 |
1,764 |
1,734 |
1,662 |
1,734 |
1,774 |
1,550 |
1,756 |
1,762 |
1,866 |
1,820 |
1,744 |
1,788 |
1,688 |
1,810 |
1,752 |
1,680 |
1,810 |
1,652 |
1,736 |