Question

In: Accounting

Discussion Post in paragraph format: You are responsible for updating the predetermined overhead rate for your...

Discussion Post in paragraph format:

You are responsible for updating the predetermined overhead rate for your company, analyzing the current costs, using projected changes, and creating the rate for the next year. You notice the maintenance cost had almost doubled last year compared to prior years. You need to analyze this situation more and determine ways to better track this increase. The factory manager has suggested you spread the costs over all the departments to smooth the increase.

1. Determine a costing system to use to help better analyze the increase. Explain how this system will allow for future analysis to identify the increases.

2. If the manager pushes to spread the costs, what are the options you have to ensure you are protecting the company from irregular increases?

Solutions

Expert Solution

Question 1

Is is advisable for the company to adopt activity based costing for the given situation.Also known as ABC Costing, the activity based costing  that assigns cost of each activity to products and services based on the consumption level by each of them. This method helps the company to find out the cost of the entire products and services and helps to find out the products or services which are not of much value addition or which are not profitable and aviod them which results in decrease of costs. This method of costing is preferable over the standard method involving allocating overheads at a single rate to the entire deprtment or the entire plant where the funds go in vain whether the activities are conducted or not.

Question 2

To avoid irregular increase of costs, it is advisable to find out that department which incurs the highest cost and allocate the maximum amount of overheads to the same department and reduce the overhead allocation to those with low cost. Analysing variances between the actual and budgeted costs also would help to find out the deviations incurred and thereby take steps to reduce the gap and irregular increases in the cost.


Related Solutions

Discussion Post in paragraph format: You are responsible for updating the predetermined overhead rate for your...
Discussion Post in paragraph format: You are responsible for updating the predetermined overhead rate for your company, analyzing the current costs, using projected changes, and creating the rate for the next year. You notice the maintenance cost had almost doubled last year compared to prior years. You need to analyze this situation more and determine ways to better track this increase. The factory manager has suggested you spread the costs over all the departments to smooth the increase. 1. Determine...
You are responsible for updating the predetermined overhead rate for your company, analyzing the current costs,...
You are responsible for updating the predetermined overhead rate for your company, analyzing the current costs, using projected changes, and creating the rate for the next year. You notice the maintenance cost had almost doubled last year compared to prior years. You need to analyze this situation more and determine ways to better track this increase. The factory manager has suggested you spread the costs over all the departments to smooth the increase. Determine a costing system to use to...
Predetermined Overhead Rate, Overhead Variances, Journal Entries Craig Company uses a predetermined overhead rate to assign...
Predetermined Overhead Rate, Overhead Variances, Journal Entries Craig Company uses a predetermined overhead rate to assign overhead to jobs. Because Craig's production is machine intensive, overhead is applied on the basis of machine hours. The expected overhead for the year was $6,461,400, and the practical level of activity is 363,000 machine hours.    During the year, Craig used 369,500 machine hours and incurred actual overhead costs of $6,502,100. Craig also had the following balances of applied overhead in its accounts: Work-in-process...
What is the firm’s predetermined overhead rate?
A company estimates that it has $400,000 in variable overhead costs annually and $265,000 in fixed rate overhead costs annually. Last year the variable and fixed overhead costs were $300,000 and $200,000, respectively. The firm estimates that it will have 32,500 direct labor hours this year.What is the firm’s predetermined overhead rate?
Problem #4 Predetermined Overhead Rate Broadway Corporation uses job order costing with a predetermined overhead rate...
Problem #4 Predetermined Overhead Rate Broadway Corporation uses job order costing with a predetermined overhead rate based on machine hours to apply overhead. The following costs were provided after Job 500 & 510 were complete. Given Estimated Annual Data: Machine Hours 55,000 DL rate/hour $8 Unit Overhead 345,000 Support labor (4,000 hours) 17,000 Facility Overhead 150,000 Supervisor Salaries 36,000 Total Overhead 495,000 Beginning Inventory Raw Materials and Supplies $10,500 Work in Process (Job 500 only) 54,000 Finished Goods 112,500 Purchases...
Start your discussion post with a summary paragraph on the major groups of genes that when...
Start your discussion post with a summary paragraph on the major groups of genes that when mutated can cause cancer, and include the types of mutations that can change their protein structure. Your next paragraph will focus on your gene of choice. You should find one to two reliable sources that discuss that gene. Focus on the group of cancer-causing genes that this gene belongs to, its normal function, and why the mutation can lead to the cell cycle becoming...
What was the company’s plantwide predetermined overhead rate?
Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories. The company has two manufacturing departments—Molding and Fabrication. It started, completed, and sold only two jobs during March—Job P and Job Q. The following additional information is available for the company as a whole and for Jobs P and Q (all data and questions relate to the month of March): Molding Fabrication Total Estimated total machine-hours used 2,500 1,500 4,000 Estimated total fixed manufacturing...
Calculating the Predetermined Overhead Rate, Applying Overhead to Production, Reconciling Overhead at the End of the...
Calculating the Predetermined Overhead Rate, Applying Overhead to Production, Reconciling Overhead at the End of the Year, Adjusting Cost of Goods Sold for Under- and Overapplied Overhead At the beginning of the year, Horvath Company estimated the following: Overhead $240,000 Direct labor hours 80,000 Horvath uses normal costing and applies overhead on the basis of direct labor hours. For the month of January, direct labor hours were 8,450. By the end of the year, Horvath showed the following actual amounts:...
2. Assigning Overhead to individual jobs – a. Predetermined Overhead rate is used to assign overhead...
2. Assigning Overhead to individual jobs – a. Predetermined Overhead rate is used to assign overhead costs to individual jobs in a manner which approximates their relative usage of overhead items based on estimated data that is established before the period begins. b. But by definition, overhead cannot be directly traced to individual jobs. Predetermined Overhead Rate = Estimated Total Factory Overhead Costs Estimated Activity Base Predetermined Overhead Rate Example: • Assume total manufacturing overhead is estimated to be $...
Osborn Manufacturing uses a predetermined overhead rate of $18.30 per direct labor-hour. This predetermined rate was...
Osborn Manufacturing uses a predetermined overhead rate of $18.30 per direct labor-hour. This predetermined rate was based on a cost formula that estimates $221,430 of total manufacturing overhead for an estimated activity level of 12,100 direct labor-hours.      The company incurred actual total manufacturing overhead costs of $217,000 and 11,600 total direct labor-hours during the period.     Required: 1. Determine the amount of underapplied or overapplied manufacturing overhead for the period.            2. Assuming that the entire amount of the...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT