In: Finance
Your division is considering two projects with the following cash flows (in millions):
0 | 1. | 2 | 3 |
Project A | -$35 | $4 | $14 | $20 |
Project B | -$15 | $8 | $5 | $4 |
What are the projects' NPVs assuming the WACC is 5%? Enter your answer in millions. For example, an answer of $10,550,000 should be entered as 10.55. Negative values, if any, should be indicated by a minus sign. Do not round intermediate calculations. Round your answer to two decimal places.
Project A: $ million
Project B: $ million
What are the projects' NPVs assuming the WACC is 10%? Enter your answer in millions. For example, an answer of $10,550,000 should be entered as 10.55. Negative values, if any, should be indicated by a minus sign. Do not round intermediate calculations. Round your answer to two decimal places.
Project A: $ million
Project B: $ million
What are the projects' NPVs assuming the WACC is 15%? Enter your answer in millions. For example, an answer of $10,550,000 should be entered as 10.55. Negative values, if any, should be indicated by a minus sign. Do not round intermediate calculations. Round your answer to two decimal places.
Project A: $ million
Project B: $ million
What are the projects' IRRs assuming the WACC is 5%? Do not round intermediate calculations. Round your answer to two decimal places.
Project A: %
Project B: %
What are the projects' IRRs assuming the WACC is 10%? Do not round intermediate calculations. Round your answer to two decimal places.
Project A: %
Project B: %
What are the projects' IRRs assuming the WACC is 15%? Do not round intermediate calculations. Round your answer to two decimal places.
Project A: %
Project B: %
If the WACC was 5% and A and B were mutually exclusive, which project would you choose? (Hint: The crossover rate is 1.66%.)
--Select-Project A Project B Neither
If the WACC was 10% and A and B were mutually exclusive, which project would you choose? (Hint: The crossover rate is 1.66%.)
-Select-Project A Project B Neither
If the WACC was 15% and A and B were mutually exclusive, which project would you choose? (Hint: The crossover rate is 1.66%.)
-Select-Project A Project B Neither
Rate | NPV-A | NPV-B | |
a | 5% | ($1.22) | $0.61 |
10% | ($4.77) | ($0.59) | |
15% | ($7.79) | ($1.63) |
b | Rate | IRR-A | IRR-B |
5% | 3.47% | 7.45% | |
10% | 3.47% | 7.45% | |
15% | 3.47% | 7.45% |
(IRR is same irrespective of the rate)
c: Select the project with higher NPV and which is not negative
Rate | NPV-A | NPV-B | Select |
5% | ($1.22) | $0.61 | B |
10% | ($4.77) | ($0.59) | Neither |
15% | ($7.79) | ($1.63) | Neither |
Workings