Suppose you have assumed the role as the construction manager (CM) in one of the City of Kelowna’s water park projects. The previous CM resigned the City. The project is 2 months behind the schedule. Over 75% of the allocated budget has been spent and only 55% (based on number of installed/constructed items) of the construction has been completed.
FIRSTLY, a proper analysis of the work completed will be done , and how the money spends will be studied, and I will try to locate the areas where excessive money is spent and also summarize how the project got delayed.
Now I will have to find a solution for both the issues and come to a conclusion which incorporates both the solutions
some of the steps that I will take will include
I will estimate the future costs properly so that I can find where can I apply cost reduction
I will try to avoid the scope of rework because it is a main unwanted expense which occurs in the construction field
I will do a proper study on staff and labors, and I will dismiss workers, if I feel they are not productive to the required level
I will try to hire multipurpose labors which will help in cost reduction
A proper interactive session will be conducted with labours and staffs , and will try to get their opinions and views on how the work can be completed in time with less budget
I will try to use technologies which can make the work fast and cost-effective