Connecting the link between family life and social structure, Provide 5 examples of how society influences family life. How does this construction change over time?
In: Psychology
How many sugars ar needed to provide the energy and construction material fro making a new cell? Make an estimate for the average rate of sugar uptake for dividing bacterium.
In: Biology
“Introns and Exons” essay question
Explain why the average rate of evolution differs between introns and exons, and why this is important for choosing genetic markers to be used in phylogeny construction.
In: Biology
What document summarizes the financial position of the construction company?
Question options:
|
|||
|
|||
|
|||
|
In: Civil Engineering
Justify the reasons for saving the materials during
the construction of vertical curves in highway ,with the
component elements of vertical curves . Also Give the necsssity of
providing the component parts of vertical
curve
In: Civil Engineering
In: Civil Engineering
1. what are the right sequences of driving the precast reinforced convrete piles?
2.introduce the procedure of construction of the bored piles with the hole being supported by the mud in detail please
In: Civil Engineering
On March 1, 2017, Oriole Construction Company contracted to construct a factory building for Fabrik Manufacturing Inc. for a total contract price of $8,450,000. The building was completed by October 31, 2019. The annual contract costs incurred, estimated costs to complete the contract, and accumulated billings to Fabrik for 2017, 2018, and 2019 are given below: 2017 2018 2019 Contract costs incurred during the year $3,052,800 $2,254,300 $1,962,900 Estimated costs to complete the contract at 12/31 3,307,200 1,962,900 –0– Billings to Fabrik during the year 3,230,000 3,470,000 1,750,000 (a) Using the percentage-of-completion method, prepare schedules to compute the profit or loss to be recognized as a result of this contract for the years ended December 31, 2017, 2018, and 2019. (Ignore income taxes.) (If answer is 0, please enter 0. Do not leave any fields blank.) 2017 $ $ % $ $ 2018 $ $ % $ $ 2019 $ : $ (b) Using the completed-contract method, prepare schedules to compute the profit or loss to be recognized as a result of this contract for the years ended December 31, 2017, 2018, and 2019. (Ignore income taxes.) (If answer is 0, please enter 0. Do not leave any fields blank. Enter loss using either a negative sign preceding the number e.g. -45 or parentheses e.g. (45).) 2017 $ 2018 $ 2019 $
In: Accounting
On July 1, 2017, Skysong Construction Company Inc. contracted to build an office building for Gumbel Corp. for a total contract price of $1,910,000. On July 1, Skysong estimated that it would take between 2 and 3 years to complete the building. On December 31, 2019, the building was deemed substantially completed. Following are accumulated contract costs incurred, estimated costs to complete the contract, and accumulated billings to Gumbel for 2017, 2018, and 2019.
|
At |
At |
At |
||||
| Contract costs incurred to date | $327,800 | $1,180,000 | $2,090,400 | |||
| Estimated costs to complete the contract | 1,162,200 | 820,000 | –0– | |||
| Billings to Gumbel | 300,000 | 1,110,000 | 1,870,000 |
(a) Using the percentage-of-completion method,
prepare schedules to compute the profit or loss to be recognized as
a result of this contract for the years ended December 31, 2017,
2018, and 2019. (Ignore income taxes.) (If answer is 0,
please enter 0. Do not leave any field blank.
(b) Using the completed-contract method,
prepare schedules to compute the profit or loss to be recognized as
a result of this contract for the years ended December 31, 2017,
2018, and 2019. (Ignore income taxes.) (If answer is 0,
please enter 0. Do not leave any fields
blank.)
In: Accounting
Problem 18-11
On July 1, 2017, Vaughn Construction Company Inc. contracted to build an office building for Gumbel Corp. for a total contract price of $1,890,000. On July 1, Vaughn estimated that it would take between 2 and 3 years to complete the building. On December 31, 2019, the building was deemed substantially completed. Following are accumulated contract costs incurred, estimated costs to complete the contract, and accumulated billings to Gumbel for 2017, 2018, and 2019.
|
At |
At |
At |
||||
| Contract costs incurred to date | $304,000 | $1,207,800 | $2,089,200 | |||
| Estimated costs to complete the contract | 1,216,000 | 772,200 | –0– | |||
| Billings to Gumbel | 300,000 | 1,080,000 | 1,830,000 |
(a) Using the percentage-of-completion method,
prepare schedules to compute the profit or loss to be recognized as
a result of this contract for the years ended December 31, 2017,
2018, and 2019. (Ignore income taxes.) (If answer is 0,
please enter 0. Do not leave any field blank.)
(b) Using the completed-contract method, prepare schedules to compute the profit or loss to be recognized as a result of this contract for the years ended December 31, 2017, 2018, and 2019. (Ignore income taxes.) (If answer is 0, please enter 0. Do not leave any fields blank.)
In: Accounting