Question 2 – Comprehensive problem: Scoops Ahoy, Inc. is a manufacturer that produces ice cream. Its relevant range of production for 2019 is 101,000 to 106,000 pints of ice cream. When it produces and sells 104,000 pints, its average costs per unit are as follows:
|
Average cost per pint |
||
|
Direct materials |
$ |
0.35 |
|
Direct labor |
$ |
1.19 |
|
Variable manufacturing overhead |
$ |
0.23 |
|
Fixed manufacturing overhead |
$ |
0.27 |
|
Variable selling and administrative expenses |
$ |
0.09 |
|
Fixed selling and administrative expenses |
$ |
0.13 |
In: Accounting
Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis
Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 70,000 units of product were as follows:
| Standard Costs | Actual Costs | ||
| Direct materials | 231,000 lbs. at $4.90 | 228,700 lbs. at $4.80 | |
| Direct labor | 17,500 hrs. at $17.90 | 17,900 hrs. at $18.30 | |
| Factory overhead | Rates per direct labor hr., | ||
| based on 100% of normal | |||
| capacity of 18,260 direct | |||
| labor hrs.: | |||
| Variable cost, $4.00 | $69,300 variable cost | ||
| Fixed cost, $6.30 | $115,038 fixed cost | ||
Each unit requires 0.25 hour of direct labor.
Required:
a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Direct Materials Price Variance | $ | |
| Direct Materials Quantity Variance | $ | |
| Total Direct Materials Cost Variance | $ |
b. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Direct Labor Rate Variance | $ | |
| Direct Labor Time Variance | $ | |
| Total Direct Labor Cost Variance | $ |
c. Determine the variable factory overhead controllable variance, fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Variable factory overhead controllable variance | $ | |
| Fixed factory overhead volume variance | $ | |
| Total factory overhead cost variance | $ |
In: Accounting
Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis
Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 70,000 units of product were as follows:
| Standard Costs | Actual Costs | ||
| Direct materials | 203,000 lbs. at $5.20 | 201,000 lbs. at $5.10 | |
| Direct labor | 17,500 hrs. at $18.50 | 17,900 hrs. at $18.70 | |
| Factory overhead | Rates per direct labor hr., | ||
| based on 100% of normal | |||
| capacity of 18,260 direct | |||
| labor hrs.: | |||
| Variable cost, $3.90 | $67,570 variable cost | ||
| Fixed cost, $6.20 | $113,212 fixed cost | ||
Each unit requires 0.25 hour of direct labor.
Required:
a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Direct Material Price Variance | $ | |
| Direct Materials Quantity Variance | $ | |
| Total Direct Materials Cost Variance | $ |
b. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Direct Labor Rate Variance | $ | |
| Direct Labor Time Variance | $ | |
| Total Direct Labor Cost Variance | $ |
c. Determine variable factory overhead controllable variance, the fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Variable factory overhead controllable variance | $ | |
| Fixed factory overhead volume variance | $ | |
| Total factory overhead cost variance | $ |
In: Accounting
Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis
Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 6,400 units of product were as follows:
| Standard Costs | Actual Costs | ||
| Direct materials | 8,300 lb. at $6.00 | 8,200 lb. at $5.80 | |
| Direct labor | 1,600 hrs. at $18.70 | 1,640 hrs. at $19.00 | |
| Factory overhead | Rates per direct labor hr., | ||
| based on 100% of normal | |||
| capacity of 1,670 direct | |||
| labor hrs.: | |||
| Variable cost, $4.70 | $7,440 variable cost | ||
| Fixed cost, $7.40 | $12,358 fixed cost | ||
Each unit requires 0.25 hour of direct labor.
Required:
a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Price variance | $ | |
| Quantity variance | $ | |
| Total direct materials cost variance | $ |
b. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Rate variance | $ | |
| Time variance | $ | |
| Total direct labor cost variance | $ |
c. Determine variable factory overhead controllable variance, the fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Variable factory overhead controllable variance | $ | |
| Fixed factory overhead volume variance | $ | |
| Total factory overhead cost variance | $ |
In: Accounting
Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis
Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 70,000 units of product were as follows:
| Standard Costs | Actual Costs | ||
| Direct materials | 238,000 lbs. at $5.20 | 235,600 lbs. at $5.10 | |
| Direct labor | 17,500 hrs. at $17.00 | 17,900 hrs. at $17.20 | |
| Factory overhead | Rates per direct labor hr., | ||
| based on 100% of normal | |||
| capacity of 18,260 direct | |||
| labor hrs.: | |||
| Variable cost, $4.60 | $79,700 variable cost | ||
| Fixed cost, $7.30 | $133,298 fixed cost | ||
Each unit requires 0.25 hour of direct labor.
Required:
a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Direct Material Price Variance | $ | |
| Direct Materials Quantity Variance | $ | |
| Total Direct Materials Cost Variance | $ |
b. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Direct Labor Rate Variance | $ | |
| Direct Labor Time Variance | $ | |
| Total Direct Labor Cost Variance | $ |
c. Determine variable factory overhead controllable variance, the fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Variable factory overhead controllable variance | $ | |
| Fixed factory overhead volume variance | $ | |
| Total factory overhead cost variance | $ |
In: Accounting
Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis
Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 6,000 units of product were as follows:
| Standard Costs | Actual Costs | ||
| Direct materials | 7,800 lb. at $4.90 | 7,700 lb. at $4.70 | |
| Direct labor | 1,500 hrs. at $17.90 | 1,530 hrs. at $18.30 | |
| Factory overhead | Rates per direct labor hr., | ||
| based on 100% of normal | |||
| capacity of 1,560 direct | |||
| labor hrs.: | |||
| Variable cost, $3.40 | $5,050 variable cost | ||
| Fixed cost, $5.40 | $8,424 fixed cost | ||
Each unit requires 0.25 hour of direct labor.
Required:
a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Direct materials price variance | $ | |
| Direct materials quantity variance | ||
| Total direct materials cost variance | $ |
b. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Direct labor rate variance | $ | |
| Direct labor time variance | ||
| Total direct labor cost variance | $ |
c. Determine variable factory overhead controllable variance, the fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Variable factory overhead controllable variance | $ | |
| Fixed factory overhead volume variance | ||
| Total factory overhead cost variance | $ |
In: Accounting
Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis
Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 6,400 units of product were as follows:
| Standard Costs | Actual Costs | ||
| Direct materials | 8,300 lb. at $4.90 | 8,200 lb. at $4.70 | |
| Direct labor | 1,600 hrs. at $17.40 | 1,640 hrs. at $17.60 | |
| Factory overhead | Rates per direct labor hr., | ||
| based on 100% of normal | |||
| capacity of 1,670 direct | |||
| labor hrs.: | |||
| Variable cost, $3.30 | $5,230 variable cost | ||
| Fixed cost, $5.20 | $8,684 fixed cost | ||
Each unit requires 0.25 hour of direct labor.
Required:
a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Price variance | $ | |
| Quantity variance | $ | |
| Total direct materials cost variance | $ |
b. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Rate variance | $ | |
| Time variance | $ | |
| Total direct labor cost variance | $ |
c. Determine variable factory overhead controllable variance, the fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Variable factory overhead controllable variance | $ | |
| Fixed factory overhead volume variance | $ | |
| Total factory overhead cost variance | $ |
In: Accounting
Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis
Eastern Polymers, Inc., processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 6,400 units of product were as follows:
| Standard Costs | Actual Costs | ||
| Direct materials | 8,300 lbs. at $5.4 | 8,200 lbs. at $5.3 | |
| Direct labor | 1,600 hrs. at $16.1 | 1,640 hrs. at $16.4 | |
| Factory overhead | Rates per direct labor hr., | ||
| based on 100% of normal | |||
| capacity of 1,670 direct | |||
| labor hrs.: | |||
| Variable cost, $4.8 | $7,600 variable cost | ||
| Fixed cost, $7.6 | $12,692 fixed cost | ||
Each unit requires 0.25 hour of direct labor.
Required:
a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Price variance | $_________ | Favorable |
| Quantity variance | $______ | Favorable |
| Total direct materials cost variance | $____ | Favorable |
b. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Rate variance | $______ | Unfavorable |
| Time variance | $______ | Unfavorable |
| Total direct labor cost variance | $______ | Unfavorable |
c. Determine variable factory overhead controllable variance, the fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Variable factory overhead controllable variance | $_____ | Favorable |
| Fixed factory overhead volume variance | $_____ | Unfavorable |
| Total factory overhead cost variance | $_____ | Unfavorable |
In: Accounting
Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis
Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 70,000 units of product were as follows:
| Standard Costs | Actual Costs | ||
| Direct materials | 217,000 lbs. at $5.20 | 214,800 lbs. at $5.10 | |
| Direct labor | 17,500 hrs. at $16.70 | 17,900 hrs. at $16.90 | |
| Factory overhead | Rates per direct labor hr., | ||
| based on 100% of normal | |||
| capacity of 18,260 direct | |||
| labor hrs.: | |||
| Variable cost, $4.30 | $74,500 variable cost | ||
| Fixed cost, $6.80 | $124,168 fixed cost | ||
Each unit requires 0.25 hour of direct labor.
Required:
a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Direct Materials Price Variance | ||
| Direct Materials Quantity Variance | ||
| Total Direct Materials Cost Variance |
b. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Direct Labor Rate Variance | ||
| Direct Labor Time Variance | ||
| Total Direct Labor Cost Variance |
c. Determine the variable factory overhead controllable variance, fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Variable factory overhead controllable variance | ||
| Fixed factory overhead volume variance | ||
| Total factory overhead cost variance |
In: Accounting
Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis
Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 4,800 units of product were as follows:
| Standard Costs | Actual Costs | ||
| Direct materials | 6,200 lb. at $4.90 | 6,100 lb. at $4.80 | |
| Direct labor | 1,200 hrs. at $16.70 | 1,230 hrs. at $17.10 | |
| Factory overhead | Rates per direct labor hr., | ||
| based on 100% of normal | |||
| capacity of 1,250 direct | |||
| labor hrs.: | |||
| Variable cost, $4.50 | $5,350 variable cost | ||
| Fixed cost, $7.10 | $8,875 fixed cost | ||
Each unit requires 0.25 hour of direct labor.
Required:
a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Direct materials price variance | $ | |
| Direct materials quantity variance | ||
| Total direct materials cost variance | $ |
b. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Direct labor rate variance | $ | |
| Direct labor time variance | ||
| Total direct labor cost variance | $ |
c. Determine variable factory overhead controllable variance, the fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Variable factory overhead controllable variance | $ | |
| Fixed factory overhead volume variance | ||
| Total factory overhead cost variance | $ |
In: Accounting