An Indonesian foreign firm agreed to sell and deliver goods to a Malaysian company that paid a considerable sum of money in advance. However, the contract was frustrated because of the 5.0 magnitude of an earthquake near Bima in West Nusa Tenggara. The Malaysian company claimed the right to recover the deposit they paid prior to the frustrating event. Advise the Malaysian company.
In: Accounting
explain in brief. no google copy and paste is required
In: Biology
For energy engineers;
Review the mechanical design features materials, construction and so on of two types of energy storage system.
please talk about it deeply like an article. much explanation needed.
In: Electrical Engineering
In: Mechanical Engineering
Considering the entire procurement process (i.e., bidding through the contract award periods), what type of bonds are normally required to be provided by a bidder/proposer to be awarded a public works construction project?
In: Civil Engineering
Explain the construction and working of a CO2 laser with a
suitable energy level diagram.
Find the ratio of the population of the two states in a He–Ne laser
that produces light of
wavelength 632.8 nm at 27C
In: Physics
Select TWO companies listed in the construction sector of the Main Market of Bursa Malaysia
Compute the relevant ratios for the analysis of the companies’ capital structure for the years 2015, 2016, 2017, 2018 and 2019
In: Finance
The current confined space standard for construction went into effect on August 3, 2015. List five (5) new requirements for confined space work that are key to the new confined space standard.
In: Economics
Given two DFAs, A and B, show that you can construct a DFA C such that L(C) = ∅ if and only if L(A) ⊆ L(B). Prove that your construction works by proving the if and only if statement.
In: Computer Science
Record your estimate of neurocranial size relative to face size, and the presence or absence of postorbital construction of primates. (Use ratios)
Just use your best guess, was given no other information
In: Biology