1. Steel is the material that has been chosen for a small link in the fuel injection mechanism in a space vehicle. Which steelmaking process would probably be used to manufacture the steel for this application?
2. You are involved in the design and construction of a new-steel -making factory. Which steel-making process would you incorporate into this new plant? How would the geographic location of the plant affect the selection of the process?
In: Mechanical Engineering
Provide the Introduction for the minor Project 1-Culvert Design. It should include at least the following information:
INTRODUCTION
A.General facts on culverts
B.Overview of Culverts
1.Shapes
1. Materials
2. Inlet types and selection
3. Considerations regarding Velocity at the culvert Outlet
4. Information regarding construction and culvert maintenance.
5. Culvert Hydraulic Programs.
Sketches and images to elucidate the information are also required
In: Civil Engineering
write a report on the below topic given with following instruction
Topic: mechanical evaluation of asphalt mastics produced using waste stone sawdust.
get familiar with the design and/or construction of sustainable /eco-friendly flexible pavements and recognize the need and engage in the civil engineering life-long learning process.
Introduction.
Summary.
Objectives and history.
project details.
Impact of the sustainable/eco-friendly approach (advantages and disadvantages).
conclusion.
In: Civil Engineering
Thompson’s proposal for a building construction contract was for $125,500. After finding that his bid was low, he checked his estimates and found that an item of $25,000 had been incorrectly recorded as $2,500 in making the summary of costs. Can he remove his bid? Is the contract likely to be valid? Why or why not? Explain your answer. To receive full credit, you should use the legal terms discussed in class.
In: Civil Engineering
You are the environmental specialist for a company that has just purchased a property and started construction of a home office. During excavation you find that the site is part of an inactive landfill. Testing of soil samples shows that vinyl chloride, a hazardous waste, is present in concentrations that exceed regulatory standards. What is your next action? If the remediation of the problem is very costly, will you seek participation by other parties? If so, why?
In: Civil Engineering
There are two steel I beams in a construction cite. The I beam A has 3" long stringer in the middle of the beam in the center of shear web and the second beam (beam B) has multiple edge cracking (0.1" deep) due to improper rolling process in the same middle area as beam A in both top and bottom flanges. As an engineer discuss which of the discontinuities will be more likely to be considered as a defect? Why?
In: Civil Engineering
Discuss the physical properties, usage, durability, application features, advantage & restriction of the following one material of a specific construction material, works/ project:
1) Fire-Rated Timber Door
General Guidelines:
Individual submission.
Write an essay.
The length of each essay should not less than 1500 words.
The report shall be typeset.
Formal report format is required.
Photos are appreciated in the report.
Reference should be provided
In: Civil Engineering
1- Describe the manufacturing process of a) asphalt binder, b) asphalt emulsion, c) asphalt cutback and name all materials used in their fabrication.
2- a) Describe the difference between hot-mix asphalt and cold-mix asphalt.
b) Give two construction applications/uses of cold-mix asphalt.
3- Name the material category (metallic, organic, inorganic) of asphalt and provide a justification for your classification.
In: Civil Engineering
Discuss the physical properties, usage, durability, application features, advantage & restriction of the following one material of a specific construction material, works/ project:
1)Structural SteelWorks for Staircase
General Guidelines:
Individual submission.
Write an essay.
The length of each essay should not less than 1500 words.
The report shall be typeset.
Formal report format is required.
Photos are appreciated in the report.
Reference should be provided
In: Civil Engineering
Lane and Louis were limited partners in a real estate venture. After the business was in financial difficulty, these limited partners had two meetings with the general partners to discuss the problems of the venture. In addition, Lane visited the construction site and “obnoxiously” complained about the work that was being conducted. Do these actions constitute taking part in the control of the business so that the limited partners become liable as general partners? Explain.
In: Operations Management