1. Formulas for swelling potential involving atterberg parameters. explain the terms with an example
a. what foundation would you recommend on a soil with a high moisture content at the surface but moderate at around 3.5m for a 5-storey airport building and why that foundation
b. What can be a recommendation for the design and construction of an airport pavement? What factors are taken into consideration to achieve this
In: Civil Engineering
Business Funding Question.
Solving a problem
You are supposed to negotiate 2 bank credits:
- one for intermediate trade with the USA (Import of iPhones 7)
and
- second – for the construction of the iPhone plant in Rome.
Suggest your terms and conditions: (sum, currency, duration,
interest rate, procedure of drawing and reimbursement, collateral –
if any etc.)
Required approximately 1 page in word.
In: Advanced Math
Superstructure Frames: Construction
Using all the different "design types" of superstructure frames (Concrete frame, Timber Frame, Steel Frame), how would you "design/build" a high-rise in your area (California, Fresno), and what types of structural systems would you use? You may make geographical assumptions to fit your model building.
In: Civil Engineering
Chapter 11
In: Operations Management
Selected data from the financial statements of KRJ Manufacturing are presented below. Calculate the gross profit margin, presenting your answer in percentage terms, rounded to two decimal places. e.g. 20.00%.
Sales $107,262
Cost of goods sold $51,727
Operating profits (EBIT) $32,852
Earnings before taxes (EBT) $28,308
Net profits $18,706
Tax expense 8,310
Depreciation expense $14,562
Total assets, beg of year $89,075
Total assets, end of year $83,449
Total equity, beg of year $42,951
Total equity, end of year $40,310
Cash flow from operations $28,084
In: Finance
Assume that the life of an engine follows a normal
distribution with an average life of 12 years and a standard
deviation of 2 years. The seller replaces all engines that fail
during the warranty period without additional charges.
a) If the manufacturer wishes to replace only 1% of the engines it sells, what is the warranty time it must offer?
b) supposes that Puerto Rico sold 30 engines, what is the percentage of probability that more than 1 customer will claim a guarantee?
c) the cost of repairing a $ 1,500 engine. How much money do you expect to spend for the engines you need to repair and are already under warranty?
In: Statistics and Probability
Edwards Company contracted on 4/1/17 to construct a building for $4,800,000. The project was completed in 2019. Additional data follow: 2017 2018 2019 Costs incurred to date $1,120,000 $2,700,000 $3,800,000 Estimated cost to complete 2,080,000 900,000 — Billings to date 1,000,000 3,800,000 4,800,000 Collections to date 800,000 2,600,000 4,400,000 Instructions (a) Calculate the income recognized by Edwards under the percentage-of-completion method of accounting in each of the years 2017, 2018, and 2019. (b) Prepare all necessary entries for the year 2018. (c) Present the balance sheet disclosures at December 31, 2018. Proper headings or subheadings must be indicated.
In: Accounting
Billy's Builders just obtained a contract for $500,000 to build a home for Mr. & Mrs. Mary. Jones estimates his total cost on the job to be $400,000. During the first month of the job, the following transactions occur: • Cash of $10,000 is paid for permits, fees and other startup costs. • An invoice is received from the excavation subcontractor for $10,000. • The first progress billing is prepared for $60,000.
If the above transactions were the only ones Billy's Builders had for the month, what will the revenue, expense, and profit look like under each accounting method
|
Accounting Method |
||||
|
Cash |
Accrual |
Percentage of Completion |
Completed Contract |
|
|
Revenue |
||||
|
Expense |
||||
|
Profit |
||||
In: Accounting
The following represents the financial information for Domingo Corporation for two months.
|
March |
April |
|||
|
Sales revenue |
$ |
504,000 |
$ |
468,000 |
|
Costs |
||||
|
Process inspection |
$ |
4,250 |
$ |
4,480 |
|
Scrap |
2,500 |
2,580 |
||
|
Quality training |
22,400 |
15,600 |
||
|
Warranty repairs |
8,200 |
8,700 |
||
|
Product testing equipment |
8,300 |
8,300 |
||
|
Customer complaints |
4,750 |
5,350 |
||
|
Rework |
18,300 |
25,000 |
||
|
Preventive maintenance |
16,100 |
12,100 |
||
|
Materials inspection |
9,100 |
7,400 |
||
|
Field testing |
12,000 |
15,000 |
Required:
Construct a cost of quality report for March and April. (Input all amounts as positive values. Round percentage answers to 1 decimal place (i.e., 32.1).)
In: Accounting
In: Accounting